You are on page 1of 1

1

10

11

12

13

14

15

16

17

18

19

GRID LOCATION T1-T2/Tc


A

T1-T2/Tf T2-T3/Tc T2-T3/Tf T6-T7/Tc T6-T7/Tf T7-T8/Tc T7-T8/Tf

1150
B

3r1
100
C

75
D

150

75 4- 3r1 (B/S)
3EP2 - 3p3

75

3r1
D

2- 3r1 3EP2 - 3p3


2- 3r1

3@150=450

20

10

75

(TYP.)

1162.5
E

20

4- 3r1 (N/S) 300


1150

4- 3r1 (N/S)
EL15258.5 75

A
EL15858.5

A
3EP2 - 3p3

75

3@150=450

600

A-A
K

NOTES: 1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED. 2. INDICATES ORIENTATION OF MAIN MEMBER. 3. FOR LOCATION OF ASSEMBLIES REFER ERECTION DRAWINGS. 4. BOLTS SHOWN IN ASSEMBLY ARE FINGER TIGHTENED IN WORKSHOP AND FULLY TIGHTENED IN FIELD. 8
REBAR
Remarks

MATERIAL LIST FOR ONE ASSEMBLY MK'D Mark


L

3EP2 No. 1 8 Length 600.0 1250.0 Total WT KG Weight 28.3 37.6 65.8 No. 8

No. Required Remarks

Size PL20X300 D25

Grade A36 A36

3p3 3r1

NO. PLATE

REQUIRED AS DRAWN MKD' 3EP2

BOLT LIST FOR ASSEMBLY Diam


M

3EP2 Length No

Grade

Type

Connected_Member

PROJECT No. CLIENT

1024

PROJECT

ISSUED FOR APPROVAL


TITLE

CBS
N

BAHRIA TOWN ICON GALAXY CONSTRUCTION


09-12-2012

ASSEMBLY DRAWINGS
DISCIPLINE CS SIZE
1/20 16

JOB No. DWG No. A3

P/1128

SHEET No.

--------REV. A
19

A REV.

ISSUED FOR APPROVAL

-DSGN
7

KK DRWN
8

ID QC

AU REVD
9

RK APRVD
10 11 12

DATE
1

REVISION DESCRIPTION
6

THIS PRINT SUPERSEDES ALL PRINTS BEARING A LOWER REVISION LETTER / NUMBER
13 14 15

SCALE
1/10

P1024-DWG- 3EP2
17 18

You might also like