Fall 2010
Soil Settlement:
Total Soil Settlement = Elastic Settlement + Consolidation Settlement
Stotal = Se + Sc
Elastic Settlement
Theory of Elasticity
Secondary Consolidation
Water
Voids
Solids
When the water in the voids starts to flow out of the soil matrix due to consolidation of the clay layer. Consequently, the excess pore water pressure (Du) will reduce, and the void ratio (e) of the soil matrix will reduce too.
Elastic Settlement
Se = Se =
Bqo
Es
Bqo
(1 - s) (1 - s)
2
2
(center of the flexible foundation)
Es
Where = m = B/L
[ ln ( 1 + m2 + m / 1 + m2 - m ) + m. ln ( 1 + m2 + 1 / 1 + m2 - 1 )
Se =
3.0
Bqo (1 - s) Es
2.5 2.0 av r
, av, r
1.5
For circular foundation =1 av = 0.85 r = 0.88 1 2 3 4 5 L/B Values of , av, and r
By: Kamal Tawfiq, Ph.D., P.E.
1.0
3.0 6 7 8 9 10
Consolidation Settlement
Sand
B
Caly
Hc
Overburden Pressure Po
Hc/2
2 1 Stress Distribution
2 1
Sand
Consolidation Settlement
Normally Consolidated Soil
Loading
p
Unloading
Sand
1
Hsand
Sand
1
Hsand
H clay/2
Dp p
Hclay
H clay/2
p Dp
Hclay
Sand
Sand
Void Ratio
Void Ratio
Void Ratio
Dp P
Dp P
eo
Cc
Po
Log P
Po
Po + Dp P
Log P
Po
Dp Po + Log P P
Hsand
2 1
Hsand
p Dp
2
Hclay
H clay/2
2 p Dp
2
Hclay
V oid Ratio
Dp P
V oid Ratio
Dp22 P Dp
eo
Cs Cs
Po
Po + Dp P = Pc
Log P
Po
Pc
Po + Dp 2 P 2
Log P
DH =
p2
2
1
2
1
Hsand
Hsand
H clay/2
p Dp
Hclay
H clay/2
2 p Dp
2
Hclay
Void Ratio
Dp P
Po + DpP2 2
Void Ratio
Dp 22 P
eo
Cs
Po
Pc
Log P
Po
Po + P2
Pc
Log P
DH =
CS H 1 + eO
Pc Po
Void Ratio
5 1
6 3 4 2
Pc
Log P
Example:
1. 2. 3. 4. Soil sample was obtained from the clay layer Conduct consolidation test [9 load increments ] Plot e vs. log (p) (Figure 2) Determine Compression Index (Cc ) & Swelling Index (Cs)
1
Figure 1
gsand = 96 pcf Sand gclay = 110 pcf
wc = 0.3
G.S. W.T.
3 ft 4 ft
Clay
Po 16 ft
Soil Sample
In the lab and after removing the soil sample from the ground, the stresses on the soil sample = 0
0.9
Dp1 Dp 2
In the ground, the sample was subjected to geostatic stresses. In the lab and before the consolidation test the stresses on the sample = 0. During testing, the geostatic stress is gradually recovered
100
0.8
eo = 0.795
0.7
Cc = 0.72 Cs = 0.1
Cc Cs
Dp9
0.6
0.5
0.4
0.3
10000
5.
Determine
3 ft 4 ft
Pc = 800 lb/ft2
Clay
16 ft
Pc Po
=1
0.9
Dp1
6 2
0.8
X X
5 3
0.7
0.6
0.5
0.4
7
0.3 100
Po = Pc1000
10000
Log (p)
0.9
2 Horizontal line
0.8
X X
3
0.7
0.6
0.5
0.4
7
0.3 100
10000
Pc Po
=1
2 Horizontal line 1
X X
3
Po
Pc Log (p)
Pc Po
>1
Building
Example:
A 150 x 100 building will be constructed at the site. The vertical stress due to the addition of the building qdesign =1000 lb/ft2 The weight of the building Qdesign will be transferred to the mid height of the clay layer Qdesign = 15,000,000 lb The added stress at 15 from the ground surface is Dp =
15,000,000 lb (150+15) x (100+15)
1
G.S. W.T.
3 ft 4 ft
Sand
Clay
Po
DP1
Po 16 ft
0.9
Dp1
0.8
0.7
DP = 790.51 lb/ft2 DP + Po =
0.6
0.5
0.4
0.3 100
Po1000
10000
Log (p)
Building
Example:
DP + Po = 790.51 + 803 = 1593.51 lb/ft2 Consolidation Settlement DH = DH = Cc H 1 + eO log ( Po + DP ) Po
gsand = 96 pcf
qdesign
G.S. W.T.
3 ft 4 ft
Sand
Clay
Po
DP1
Po 16 ft
0.9
Dp1
0.8
DP1
0.7
0.6
0.5
0.4
0.3 100
Po1000
Po + DP
10000
Log (p)
Demolished
When the building was removed, the soil has become an overconsolidated clay.
gsand = 96 pcf qdesign
G.S.
W.T.
3 ft 4 ft
The rebound has taken place through swelling from pint 1 to point 2
Sand
Clay
Po
Po
16 ft
0.9
Dp1
0.8
DP1
0.7
2
0.6
0.5
0.4
0.3 100
Po1000
Po + DP
10000
Log (p)
Scenario #1 The soil now is overconsolidated Soil: The new building is heavier in weight
DH = CS H 1 + eO P C CH P + DP 2 log ( C ) + log ( o ) Po PC 1 + eO
1
G.S. W.T.
3 ft 4 ft
Sand
Clay
Po
DP2
Po 16 ft
0.9
Dp1
DP2 DP1
0.8
0.7
DH =
0.1 x 16 1 + 0.61
log (
1593.51 803
) )
0.6
CS
0.5
CC
0.4
0.3 100
Po1000
Pc
Po + DP 2
10000
Log (p)
New Building
qdesign
G.S. W.T.
gsand = 96 pcf
3 ft 4 ft
Sand
Clay
Po
DP2
Po 16 ft
0.9
Dp1
eo = 0.61
Void Ratio (e)
Assume Po + Dp2 = 1600 psf
DP2 DP1
0.8
0.7
0.6
DH =
0.1 x 16 1 + 0.61 =
CS
0.5
0.4
0.3 100
Po1000Po
+ DP2
10000
Log (p)
New Building
0.7
0.6
0.5
0.4
0.3
0.2