You are on page 1of 29

Central Washington University

Outside Plant Communications Distribution Design Guide


(Revision 1.1)

May 25, 2001

Conley Engineering, Inc.


Consulting Electrical Engineers

TABLE

OF

CONTENTS

TABLE

OF

CONTENTS

LIST OF FIGURES...............................................................................................II LIST OF TABLES.................................................................................................II INTRODUCTION..................................................................................................1 DOCUMENT INTENT ..........................................................................................................................1 TYPE OF CONSTRUCTION....................................................................................................................2
NEW CONSTRUCTION OVERBUILD CONSTRUCTION BASIC CONSTRUCTION

DESIGNER QUALIFICATIONS AND DESIGN STANDARDS........................................4 DESIGNER QUALIFICATIONS.................................................................................................................4 DESIGN STANDARDS........................................................................................................................4


REFERENCES, STANDARDS, AND CODES MANUFACTURERS DEVIATION FROM STANDARDS

DESIGN CONSIDERATIONS..................................................................................7 OVERVIEW....................................................................................................................................7


TELECOMMUNICATIONS OUTSIDE PLANT MASTER PLAN DEFINITION OF TERMS

PATHWAY SYSTEM.........................................................................................................................10
GENERAL DESIGN CONSIDERATIONS UNDERGROUND CABLE VAULTS (UCVS) DUCTS (CONDUIT) DUCTBANKS

COMMUNICATIONS MEDIA.................................................................................................................20
GENERAL DESIGN CONSIDERATIONS GROUNDING AND BONDING MEDIA TYPES TERMINATION LABELING AND ADMINISTRATION

ENTRANCE FACILITIES.....................................................................................................................24
GENERAL DESIGN CONSIDERATIONS GROUNDING AND BONDING

APPENDICES....................................................................................................25 APPENDIX 1 CONSTRUCTION DRAWINGS...........................................................................................25 APPENDIX 2 BIBLIOGRAPHY AND REFERENCES ....................................................................................26

2011 Conley Engineering, Inc.

FIGURES

AND

TABLES

LIST

OF

FIGURES
1 2 3 4 5 6 TWO-LEVEL HIERARCHICAL STAR TOPOLOGY ...................................7 TYPICAL UCV DETAIL ....................................................................11 SPLAYED DUCT ENTRY/EXIT............................................................12 CORRECT AND INCORRECT DUCT ENTRY/EXIT FROM A UCV .............12 DUCT ENTRANCES IN A UCV ..........................................................16 TYPICAL 4X4 DUCTBANK DETAILS...................................................19

FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE

LIST

OF

TABLES
REFERENCES, STANDARDS, AND CODES ............................................5 DEFINITION OF TERMS......................................................................8 DUCT TYPES AND USAGE.................................................................14 DUCTBANK MINIMUM SEPARATIONS................................................17

TABLE TABLE TABLE TABLE

1 2 3 4

2011 Conley Engineering, Inc.

ii

INTRODUCTION

INTRODUCTION
The purpose of this document is to provide CWU staff, as well as consulting architects, engineers, and designers working for CWU with a guide for the design of outside plant (OSP) communications distribution systems that accurately reflect CWU and industry standards in effect as of this publication. This document was originally produced (in 1999) based on industry standards and practices, as well as the telecommunications practices in use at that time at CWU. Under the current revision, it has been updated to reflect the methods, materials and standards that have been used to for providing telecommunications services to the existing Residence Hall facilities. The updated document also reflects changes in industry practice as of this publication. Outside plant communications distribution systems designed for CWU are expected to support and integrate voice, data, and video communications with common media (fiber optic and unshielded twisted pair (UTP) copper cable). In general, it is the responsibility of the outside plant communications distribution designer to coordinate with the other designers on a project (architecture, electrical, mechanical, etc.) to ensure that other systems are both compatible with and complementary to the communications cabling system. CWUs design philosophy is that it is critical to coordinate between disciplines during the design phase of a project, rather than attempting to make adjustments in the field during construction.

DOCUMENT INTENT
This document addresses outside plant communications distribution system design as it relates to: Pathway System underground cable vaults (UCVs), ductbanks, ducts (conduits), etc. Communications Media fiber and UTP copper media. Building Entrance Facilities

This document is not intended to serve as a Master Specification nor for stand-alone use on design build projects it is to be used in conjunction with the CWU Outside Plant Communications Distribution System Master Specification. This document should serve as a guide for making standards compliant design decisions which, in due course, will be reflected in a system specification based upon the CWU Outside Plant Communications Distribution System Master Specification. In addition to specifications for a telecommunications project, plan drawings and schematic diagrams will also need to be produced by the designer. The drawings should conform to the guidelines contained in this document.

2011 Conley Engineering, Inc.

INTRODUCTION In addition, this document is not intended to replace or detract from the Customer-Owned Outside Plant Design Manual (CO-OSP) produced and distributed by BICSI. 1 Rather, this document is to be used in conjunction with the CO-OSP in order to reinforce selected CO-OSP content as well as highlight any differences between CO-OSP and CWU standards.

TYPE

OF

CONSTRUCTION

Throughout this document, reference will be made to three types of construction: new, overbuild and basic construction. Construction of a new outside plant communications distribution system as well as the addition to and/or modification of an existing outside plant communications distribution system are considered to be included in these construction projects. Tradeoffs between design standards and practicality will many times be dependent upon the type of construction. Different design approaches may be warranted given differing types of construction. Where the type of construction is applicable to the current discussion, a superscripted circular number, such as this CONSTRUCTION REFERENCE , will make reference next to the text. This This is an example of a reference number refers to a comment in a special to the text at the left Construction Reference box to the right of the text (see the example at right). The three types of construction are defined below. These definitions are applicable to the purposes of this document only.
NEW CONSTRUCTION

New construction is defined as construction that results in a new (or new portion of an existing) outside plant communications distribution system. For the most part, new pathway will be constructed and new communications media will be installed in the pathway. A recent CWU project with components that typify this type of construction is: Electrical Utility Upgrade Phase 1 (1999-2001)

OVERBUILD CONSTRUCTION

Overbuild construction is defined as construction which may include demolition and/or abandonment of existing pathway and communications media, reuse of existing pathway for installation of new communications media, and the addition of new pathway and/or media to existing pathway and/or media. Common terms referring to this type of construction include expansion, renovation, remodel, addition, and retrofit, among others.

The CO-OSP is probably the first widely distributed industry reference text for the design of standards compliant outside plant communications distribution systems.
2011 Conley Engineering, Inc.

INTRODUCTION
BASIC CONSTRUCTION

Basic construction is defined as construction that includes reuse of existing distribution pathway for the installation of new communications media. Demolition of existing communications media may be involved as well. In general, basic construction is focused on the installation of new communications media with no (or very minor) modifications made to the existing pathway system. Recent CWU projects with components that typify this type of construction are: Campus Fiber Optic Backbone (FOB) (1999-2001) Residential Network (RESNET) (1999-2001)

2011 Conley Engineering, Inc.

DESIGNER QUALIFICATIONS

AND

DESIGN STANDARDS

DESIGNER QUALIFICATIONS

AND

DESIGN STANDARDS

DESIGNER QUALIFICATIONS
It is required that all outside plant communications distribution system designs executed on the behalf of CWU be designed by a Registered Communications Distribution Designer (RCDD) as certified by BICSI2. This means that the design project shall be managed under the direct supervision of an RCDD on the consultants staff. Project related communications between CWU and the consultant shall be mainly through the RCDD. In addition to the RCDD certification, it is desirable that the RCDD have the following qualifications: Professional Engineer (P.E.) in the electrical engineering field RCDD/LAN certification from BICSI MCSE certification from Microsoft Corporation3 In addition, the RCDD shall have the following qualifications: The RCDD shall demonstrate a minimum of 5 years of experience in the design of outside plant communications distribution systems. Experience not directly related to the design of outside plant communications distribution systems, such as sales and/or marketing, project management, or installation experience, is not acceptable. The RCDD shall demonstrate that he/she has designed or has had personal design oversight of a minimum of five projects similar in size and construction cost to the current CWU project. The RCDD shall not be affiliated with any manufacturer associated with the communications distribution system industry. The RCDD shall be completely familiar and conversant with the standards listed below.

DESIGN STANDARDS
REFERENCES, STANDARDS,
AND

CODES

CWU standards are based upon the Customer-Owned Outside Plant Design Manual (CO-OSP) produced by BICSI, the Telecommunications Distribution Methods Manual (TDMM) also produced by BICSI, ANSI/TIA/EIA and ISO/IEC standards, and NEC codes, among others. It is required that the Designer be thoroughly familiar with the content and intent of these references, standards, and codes and that the Designer be
2

BICSI, 8610 Hidden River Pkwy, Tampa, FL 33637-1000 USA, Tampa, FL 33612-6415; 1-800-242-7405; www.bicsi.org 3 Microsoft Corporation, One Microsoft Way, Redmond, WA 98052-6399, (425) 882-8080; www.microsoft.com/mcse
2011 Conley Engineering, Inc.

DESIGNER QUALIFICATIONS AND DESIGN STANDARDS capable of applying the content and intent of these references, standards, and codes to all outside plant communications system designs executed on the behalf of CWU. Listed in the table below are references, standards, and codes applicable to outside plant communications systems design. If questions arise as to which reference, standard, or code should apply in a given situation, the more stringent shall prevail. As each of these documents are modified over time, the latest edition and addenda to each of these documents is considered to be definitive.
TABLE 1 REFERENCES , STANDARDS, Standard/Reference BICSI CO-OSP BICSI TDMM BICSI TCIM TIA/EIA - 758 TIA/EIA - 568 TIA/EIA - 569 TIA/EIA - 606 TIA/EIA - 607 TIA/EIA - 455 TIA/EIA - 526 IEEE 802.3 (series) NEC NESC L&I OSHA Codes
AND

CODES

Name/Description BICSI Customer-Owned Outside Plant Design Manual BICSI Telecommunications Distribution Methods Manual BICSI Telecommunications Cabling Installation Manual Customer-Owned Outside Plant Telecommunications Cabling Standard Commercial Building Telecommunications Cabling Standard Commercial Building Standard for Telecommunication Pathways and Spaces The Administration Standard for the Telecommunications Infrastructure of Commercial Buildings Commercial Building Grounding and Bonding Requirements for Telecommunications Fiber Optic Test Standards Optical Fiber Systems Test Procedures Local Area Network Ethernet Standard, including the IEEE 802.3z Gigabit Ethernet Standard National Electric Code, NFPA National Electrical Safety Code, IEEE Department of Labor and Industries, Electrical Section, RCW 19.28, WAC 296-46 and WAC 296-401A, Interim Printing Occupational Safety and Health Administration, Code of Federal Regulations (CFR) Parts 1910 - General Industry, and 1926 - Construction Industry, et al.

Also of use to the Designer are the references listed in Appendix 2 Bibliography and References.
MANUFACTURERS

In addition to the standards listed above, CWU has selected several manufacturers of communications cabling infrastructure products. These manufacturers and their products are identified in the CWU Communications Distribution System Master Specification. The outside plant communications distribution designer is required to incorporate only these manufacturers into
2011 Conley Engineering, Inc.

DESIGNER QUALIFICATIONS AND DESIGN STANDARDS the design, and to design a communications distribution system that will be suitable for the use of products from these manufacturers.
DEVIATION STANDARDS

FROM

It is not the intent of CWU to rigidly impose standards on every aspect of an outside plant communications system design. Each design is unique and each design may be subject to situations in which deviations from the standards are warranted. If the Designer feels that deviation from a given standard is warranted, the Designer shall submit a written deviation request to CWU. The request will, at a minimum, indicate the standard from which there is a proposed deviation, the substitution being proposed in place of the standard, the reason the request is being made, and an explanation of the justifications (economic, technical or otherwise) for the deviation. The Designer may, upon written approval from CWU, incorporate the design deviation into the overall design. CWU approval is required on a project-by-project basis. The Designer should not assume that a deviation approval for one project means that the deviation will necessarily be approved for a subsequent project.

2011 Conley Engineering, Inc.

DESIGN CONSIDERATIONS

DESIGN CONSIDERATIONS

OVERVIEW
This section highlights design considerations of particular importance to CWU. It also discusses differing CWU standards given the type of construction (new, overbuild, or basic) for a particular project, as well as CWU standards that may differ from the standards listed previously in Table 1.
TELECOMMUNICATIONS OUTSIDE PLANT MASTER PLAN

Each design performed on the behalf of CWU shall conform to and integrate with the CWU Telecommunications Pathway Outside Plant Master Plan. This plan provides a 10-year strategy for the use and expansion of the underground telecommunications pathways on the CWU campus. The Master Plan calls for the campus to be subdivided into nine areas called Building Clusters. Each building within a cluster is connected with telecommunications pathway to a building within the cluster that will serve as the Building Cluster Hub. The Building Cluster Hubs are in turn connected with telecommunications pathway to the Communications Center. This configuration is based upon a TIA/EIA standard two-level hierarchical star topology such as that shown in Figure 1, below.
FIGURE 1 TWO-LEVEL HIERARCHICAL STAR TOPOLOGY

Please refer to the Master Plan Overview drawing in the CWU Telecommunications Pathway Outside Plant Master Plan for more detail.
DEFINITION
OF

TERMS

The table below defines and clarifies common terms that will be used throughout this section it is expected that the Designer is already familiar with these terms.

2011 Conley Engineering, Inc.

DESIGN CONSIDERATIONS
TABLE 2 DEFINITION Term Backbone Backfill
OF

TERMS

Base

Bedding

Building Cluster Building Cluster Hub Communications Center

Duct Ductbank Entrance Facility (EF)

Underground Cable Vault (UCV)

Definition Pathway or cable between buildings. Earth material used specifically for filling and grading excavations back to a finished state. Backfill is placed on top of the bedding surrounding encased ductbanks and direct-buried conduits. Earth materials used specifically to level and grade an excavations subgrade for the subsequent placement of encased ductbanks, direct-buried conduit, and UCVs. Base material is placed on top of the subgrade and beneath the bedding surrounding encased ductbanks, conduits, or UCVs. Earth material used specifically for filling excavations. Bedding is placed around encased ductbank, conduits, or UCVs. Bedding is placed on top of the Base (if a Base exists) and beneath the backfill. A group of buildings connected via pathway in a star topology to a Building Cluster Hub (see below). A building that serves as a pathway hub for the buildings in its Building Cluster. A centralized building on the CWU campus that serves as a pathway hub for the Building Cluster Hubs. The Communications Center, Building Cluster Hubs, and individual buildings are connected together with pathway in a two-level hierarchical star topology as shown in Figure 1. A single enclosed raceway (conduit) used for the routing of cables. An arrangement of multiple ducts, usually in tiers. The interface between the premises (in-building) communications distribution system and the outside plant communications distribution system and services (such as the public telephone network or inter-building (campus) backbone cabling.) The EF consists of protection hardware, connecting hardware and cable and equipment necessary to connect premises distribution to outside plant distribution. An underground cable vault (part of an underground duct system) used to facilitate placing, connectorizing, and maintaining telecommunications cables and associated equipment. UCV collectively refers to manholes, handholes, and pullholes. A large underground cable vault in which it is expected that a person can completely enter to perform work. A small underground cable vault in which it is expected that a person cannot completely enter to perform work. Handholes/pullholes are used for the placement of cable only. Splicing and/or equipment are not permitted in

Manholes

Handholes/Pullholes

Many of these definitions are excerpted or modified from original definitions from: BICSI, Customer-Owned Outside Plant Design Manual; BICSI, Telecommunications Distribution Methods (TDMM) Manual; and TIA/EIA 758, Customer-Owned Outside Plant Telecommunications Cabling Standard
2011 Conley Engineering, Inc.

DESIGN CONSIDERATIONS
handholes/pullholes.

2011 Conley Engineering, Inc.

DESIGN CONSIDERATIONS

PATHWAY SYSTEM
The pathway system (underground cable vaults, ducts, and ductbanks) is the foundational component of the outside plant communications distribution system. A pathway system designed with foresight provides for ease of administration, maintenance, future expansion, and replacement of cabling as technology changes. A well-designed pathway system contributes more to reducing the total cost of ownership of an outside plant communications distribution system than does any other single component. This section describes design considerations for the pathway system that are of particular concern to CWU. The Designer is expected to refer to the TIA/EIA standards and the BICSI CO-OSP and TDMM for other and more specific design criteria and detail.
GENERAL DESIGN CONSIDERATIONS

As discussed previously, the design of pathway shall conform to the TIA/EIA standard two-level hierarchical star topology as defined in the CWU Telecommunications Pathway Outside Plant Master Plan. Prior to design, the Designer is expected to meet with CWU and review CWUs requirements for the project. Items to review should include proposed pathway routing, aesthetic requirements, long range plans that CWU has regarding new and existing buildings, paved areas, opens spaces, etc. which could be affected by the design, and any unique requirements specific to the project. After the requirements review, a thorough and detailed field investigation shall be conducted. The field survey shall include, but should not be limited to:

CONSTRUCTION REFERENCE
This list is primarily applicable to
New and Overbuild Construction. However, items 1 and 2 are applicable to Basic Construction as well.

1. A thorough review of existing records and a comparison of these records against actual field conditions. 2. Notation of the condition, suitability, and diagrams showing the locations of existing pathway, UCVs, and building entrances likely to be used during the course of the project. 3. Documentation of where the telecommunications pathway will require coordination with pathway used for other utilities. 4. Investigate adverse ground conditions and obstructions (such as buildings, trees, etc.) and any significant changes in grade along the proposed pathway. 5. Notation of the existing paving types and the type of material used as a base below the paving along the proposed route. 6. Notation of the most desirable locations for new underground cable vaults (UCVs) and ductbank routes, as well as any alternative locations and routes.

2011 Conley Engineering, Inc.

10

DESIGN CONSIDERATIONS Detailed design should commence only after the field survey has been conducted and reviewed by CWU. The discussion below focuses on specific design considerations for the major components of the pathway system: UCVs, ducts, and ductbanks.
UNDERGROUND CABLE VAULTS (UCVS)

UCVs provide accessible space in an outside plant pathway system for the pulling, placing, and splicing of cables, as well as for maintenance and operations equipment. UCVs are also used to segment the pathway system into lengths compatible with standard reel lengths for outside plant cable and to conform to maximum pathway lengths as defined in the TIA/EIA standards. Underground cable vaults consist of manholes and handholes/pullholes (see Table 2, above). UCVs are also sometimes referred to as maintenance holes. Typically, manholes are installed for main ductbanks (i.e. ductbanks used for routing large portions of the telecommunications system backbone), and handholes/pullholes are installed for subsidiary ductbanks (i.e. ductbanks serving small clusters of buildings or a single building).
FIGURE 2 TYPICAL UCV DETAIL

RESTORE FINISHED GRAD CONDITION (TURF, CONCRETE FOR TURF AREAS, PRO

The quantity of duct entrances in a UCV should be sized for both immediate and future requirements. Adequate capacity for future duct entrances will mitigate the need for future wall breakouts. Additionally, UCVs configured for splayed duct entrances (rather than center entrances) are preferred. Splayed duct entry facilitates racking and minimizes bending of the communications cable. An example of splayed duct entry/exit is shown in the figure below.

2011 Conley Engineering, Inc.

11

DESIGN CONSIDERATIONS
FIGURE 3 SPLAYED DUCT ENTRY/EXIT
4 " C O ( T Y P N D U I T I C A L ) U C V

L A

I E

When designing duct entry and exit from a UCV, it is desirable to have ducts enter and exist from opposite ends of the UCV. If possible, ducts entering the sidewalls of a UCV should be avoided, given that sidewall entry may reduce overall racking space, may cause minimum cable bend radii to be exceeded, can complicate (or hinder) future cable maintenance, and can increase construction costs during cable installation. However, CWU recognizes that sidewall duct entry may be necessary or even desirable at times. If sidewall duct entry is necessary, the Designer shall ensure that ducts enter and exit at diagonally opposite corners rather than at endwall or sidewall midpoints. The Designer is to ensure that the design of the endwall and sidewall duct entry in a UCV will in no way hinder the proper installation and maintenance of the cable using the ducts. Refer to the Figure below for more detail regarding this requirement.
FIGURE 4 CORRECT
AND

INCORRECT DUCT ENTRY/EXIT

FROM A

UCV

IC

T I O

I C

T I O

4 " C O N D U I T ( T Y P I C A L ) U C V ( T Y P

I C

L )

( P

CR

O E

DR

)R

( A

IC

T I O

I C

T I O

I C

T I O

I N

I N

I N

2011 Conley Engineering, Inc.

12

DESIGN CONSIDERATIONS Other important design considerations for UCVs are: A UCV shall not be shared between telecommunications and any other utility (such as electrical). In no instance are joint-use UCVs permissible. All UCVs should be equipped with provisions for grounding and bonding, struts for racking, pulling eyes, and a sump. In general, powered devices shall not be installed in UCVs. Top slabs for UCVs shall be flush with the ground.

Design considerations unique to each type of UCV (manholes and handholes/pullholes) are discussed CONSTRUCTION REFERENCE below. The following discussion of
MANHOLES

manholes and handhole/pullholes is primarily applicable to New and Overbuild Construction.

Manholes are used for pulling, placing, and splicing cables, and for providing accessible space for cable maintenance and operation equipment. Ductbank depth, obstructions, and other utility pathways may necessitate placement of a manhole below normal depth. If this is the case, the roof of the manhole shall be placed at normal depth and riser extensions shall be used to increase the depth of the manhole. By doing so, the need for a deep collar (neck) will be eliminated. Additionally, lighting and ventilation can be maintained at a normal level. If a deep collar is unavoidable and the depth of the collar will exceed 24 inches, the Designer shall obtain written permission from CWU and ensure that the collar is equipped with permanent galvanized steps (rungs). Diamond plate hinged or removable covers are not acceptable for manholes. For reference purposes, a typical manhole size is 5 wide x 8 long x 7 high (exterior dimensions). Actual size may be as much as a foot or more larger in any direction.
HANDHOLES/PULLHOLES

Handholes/pullholes are used to facilitate cable placement in a pathway system. Handholes should not be used in place of manholes or for splicing cables. The primary use of a handhole/pullhole is to segment the pathway system. A handhole should be used if it is shown that a manhole is not required and if one or more of the following conditions exist: When the bends in a section of duct will exceed 180-degrees (see Ducts, below). When the length of the section of duct will exceed the TIA/EIA standard maximum length (see Ducts, below). For reference purposes, a handhole/pullhole is defined to be an underground cable vault sized 4 wide x 4 long x 4 high (exterior
2011 Conley Engineering, Inc.

13

DESIGN CONSIDERATIONS dimensions) or smaller.


DUCTS (CONDUIT)

CWU has standardized on 4 conduits for telecommunications ducts, with the following two exceptions: Ducts containing cables that serve the Blue Light Emergency Telephones shall be 1 conduit. Ducts containing fiber optic cabling serving the power distribution system metering equipment shall be 1 conduit. The type of conduit to be used is dependent upon the application as shown in the following table.
TABLE 3 DUCT TYPES
AND

USAGE Usage Encased in concrete Direct-buried Exposed Direct-buried, Transitions at building entrances

Conduit Type Schedule 40 PVC Schedule 80 PVC Rigid Galvanized Steel PVC Coated Steel

If the design utilizes any existing pathway, the existing ducts must be proven during design in order to ensure that the selected pathway is clear and serviceable. Proving the ducts prior to construction will not only aid the Designer in selecting the appropriate pathway for use, it will also minimize unexpected (and costly) problems or delays during construction. Acceptable proving methods are, in order of preference: Pushing/pulling a test mandrel through the duct Blowing/pushing/pulling a ball through the duct Pulling on a previously installed pull cord and observing free movement on both ends. This method does not prove that a duct is adequate for a given number of cables, however it does suggest that the duct is probably not completely obstructed.

It is left to the Designer to select the appropriate method for proving a given duct. The proving method should be selected only after determining the quantity and size of the communications media to be placed in the duct and after reviewing the condition of the duct in the field.
DUCT LENGTH

The length of each ductbank segment should be as long as possible (without exceeding the TIA/EIA maximum distance, see below) in order to minimize the use of intermediary UCVs, cable splices, and labor during installation of the communications media. In general, longer contiguous ducts equate to lower construction costs.

2011 Conley Engineering, Inc.

14

DESIGN CONSIDERATIONS The maximum duct length (between UCVs and/or buildings) permissible according to the TIA/EIA 758 standard is 600 ft. Duct sections exceeding this distance will require the installation of intermediate UCVs.

CONSTRUCTION REFERENCE
This requirement may be waived
at times for New and Overbuild Construction given the following conditions: the duct run is straight; the Designer can demonstrate that the pulling tension of a typical communications cable making use of the duct will not be exceeded during installation.

In addition, as the number of bends in a pathway increases, the maximum The requirements of TIA/EIA 569length of the pathway will decrease, A, Figure C.5-2 should be met when due to cable pulling tension calculating maximum section lengths. constraints. Longer runs will therefore tolerate fewer bends. In general, the Designer should base the pathway system design on an initial segment length budget of approximately 300 feet, and designed in as straight a line as possible.
BENDS

The Designer shall ensure that bends consist of a single arc of a minimum15-foot radius. If a smaller radius is absolutely necessary, the radius shall be no less than 10 times the internal diameter of the duct. An individual bend shall not exceed 90 degrees. Factory manufactured conduit bends should be used wherever possible. The use of 90-degree elbows or condulets (LBs) is not permissible. In order to minimize the sidewall pressure exerted on cable sheaths at bend points, the Designer should ensure that bends with the most severe radii occur at the beginning (feed end) of a duct section, rather than in the middle or at the pulling end. A duct section may have no more than CONSTRUCTION REFERENCE the equivalent of two 90-degree bends (a This requirement may be waived total of 180 degrees) between pull for Basic Construction. Older existing pathway may, at times, points. The 180-degree maximum shall exceed this rule. The Designer include kicks and offsets. In addition, should note on the Construction two 90-degree bends separated by less Documents where such conditions exist. than 10 feet are not permissible. Where it is not possible to construct a section of duct within the 180-degree bend maximum, intermediary UCVs must be installed.
DUCT ENTRANCES IN UCV S
OR

BUILDINGS

Duct entrances in a UCV should be as perpendicular as possible. Where this is not possible, the Designer should ensure that the Contractor installs a smooth inner radius of grout between the UCV and the conduit bell, as shown in the figure below:

2011 Conley Engineering, Inc.

15

DESIGN CONSIDERATIONS
FIGURE 5 DUCT ENTRANCES
IN A

UCV

PULLH WALL
Ducts should ideally enter UCV end walls at a point approximately halfway between the floor and the roof. However, where the total number of ducts penetrating a UCV (or building entrance) is significantly less than the capacity of the UCV (or building entrance), the ducts should enter at the lower level in order to ensure that upper space is reserved for future duct entrances. The Designer shall ensure that the relative position of a duct (with respect to the side walls) is consistent as it enters and exits a UCV. Additionally, a duct exiting a UCV in a given position should enter the next UCV in the same relative position. Ducts that enter from a horizontal orientation should immediately off-load into a horizontal raceway system.

BELL

Concrete encased ducts entering a CONSTRUCTION REFERENCE If in some extreme case, CWU building shall transition to PVC coated allows ductbank to be constructed rigid steel using one 10 stick of conduit. without concrete encasement, the The purpose of the PVC coated rigid steel transition to PVC coated rigid steel should occur a minimum of 10 prior is to reduce the chance of shear damage to the building. due to settling on either side of the junction between the ductbank and the building footing. If (in the opinion of a structural engineer) rigid steel is unnecessary, then this requirement could be waived, following the deviation request process described above.
DUCTBANKS

NON GROU

CON

Ductbank consists of an arrangement of multiple ducts constructed in tiers. Typical ductbank arrangements are 2, 3, and 4 ducts wide by 2, 3, or 4 ducts high. CWU has standardized on ductbanks constructed of PVC conduits encased in concrete, with full-length reinforcement and formed sides.

CONSTRUCTION REFERENCE
Ducts used for Blue Light
Emergency Telephones are not subject to this requirement.

In general, direct-buried conduit ductbanks are not permissible, unless extenuating circumstances warrant. Should the use of direct-buried PVC conduit ductbank be warranted, the Designer should ensure that all PVC bends are encased in concrete.
2011 Conley Engineering, Inc.

HORIZONTAL CO
16

DESIGN CONSIDERATIONS Where ductbank passes under paved surfaces capable of supporting motor vehicle traffic, conduit should transition to PVC coated rigid steel a minimum of 10 outside the footprint of the paved surface. The quantity of ducts to install within a ductbank will vary greatly depending upon the application. However, with the increasing migration from copper cable to fiber optic cable on the CWU campus, it is expected that the requirement for duct space will decrease over time. In keeping with this expectation and with the recommendations made in the CWU Telecommunications Pathway Outside Plant Master Plan, typical ductbank configurations are shown below. It should be noted that these typical configurations should serve as a guideline only. The quantity of ducts in a duct bank should meet the needs of the application at hand and provide for future expansion capability. Buildings up to 100,000 sq. ft.: 2 ducts Buildings 100,000 sq. ft. to 300,000 sq. ft.: 4 ducts Buildings larger than 300,000 sq. ft.: 6 ducts Buildings serving as a Building Cluster Hub: 6 ducts Pathway between Building Cluster Hubs and the Communications Center: 4 ducts

Unless specifically noted above, a typical ductbank will contain four ducts, arranged 2 wide x 2 high. In general, ductbank used for CONSTRUCTION REFERENCE telecommunications pathway should not be This may not be possible for Overbuild Construction. shared with other utilities. Budgetary constraints, space limitations, and various obstructions can make this difficult to achieve at times. Should shared ductbank be a necessity (rare situations requiring a deviation request), the Designer should ensure that adequate separation exists between duct used for telecommunications and duct used for other utilities. Refer to the table below for minimum separation distances.
TABLE 4 DUCTBANK MINIMUM SEPARATIONS Structure Power or other duct Pipes (gas, oil, water, etc.) Minimum Separations5 Refer to the latest edition of the NEC/NESC (at the time of this writing: 3 inches if in concrete, 12 inches if in well tamped earth) Refer to the latest edition of the NEC/NESC (at the time of this writing: 12 inches if parallel, 6 inches if crossing)

Should future circumstances warrant, CWU might desire to convert concreteencased communications ductbank (not direct-buried ductbank) into electrical power ductbank. The Designer should therefore ensure that communications ductbank specifications (conduit spacing, reinforcement,
5

Measured from outside to outside

2011 Conley Engineering, Inc.

17

DESIGN CONSIDERATIONS grounding requirements, etc.) conform to NEC requirements for power ductbank. If building ducts are constructed concurrently with and in the same duct bank with a main duct run, place building ducts (subsidiary/lateral ducts) on top of the ducts for the main run. This is economically advantageous, makes the building ducts more accessible, and affords some top protection for the main ducts. Drain slope should exist at all points of the ductbank to allow drainage and prevent the accumulation of water. A drain slope of per foot is desirable if possible. If not possible due to inadequate natural slope or long duct runs, a drain slope of 3 per 100 feet is acceptable. If no other option exists, provide a drain slope by sloping the first half of the ductbank up towards the midpoint, and then down from the midpoint to the end (sometimes referred to as a center crown). Drain slope requirements shall be identified in the Contract Documents they shall not be left up to the discretion of the Contractor. Details for a typical four-conduit ductbank (2 wide x 2 high) are shown in the figure below:

2011 Conley Engineering, Inc.

18

DESIGN CONSIDERATIONS
FIGURE 6 TYPICAL 4X4 DUCTBANK DETAILS

RESTORE FI FOR TURF ARE

IF EXISTING GRADE IS ASPHALT OR CONC SAWCUT EXISTING GRADE A MINIMUM 6" W THAN TRENCH W

6" WIDE METALLIC WAR

IF EXISTING GRADE IS TURF USE IMPORTED EARTH BACKFILL (95% CO IF EXISTING GRADE IS ASPHALT OR USE GRAVE

UNDISTUR

2011 Conley Engineering, Inc.

19

CONCRETE

DESIGN CONSIDERATIONS

COMMUNICATIONS MEDIA
The communications industry is now witnessing a convergence of technologies. Voice, data, and video are all capable of utilizing the same type of communications media (i.e. singlemode fiber). Additionally, these technologies are also beginning to converge into a single technology capable of combining voice, data, and video signals into a common signal transmitted down a single path. Accordingly, and as discussed in the CWU Telecommunications Pathway Outside Plant Master Plan, CWU has standardized on singlemode fiber optic media as the media of choice for all future, voice, data, and video backbone systems. Copper media (for voice and various signaling systems) as well as multimode fiber optic media (for existing data network equipment and various building and power metering systems) will continue to be installed and used, but will be used less extensively as time progresses. As the voice, data, and video systems begin to make use of the singlemode fiber on campus, existing copper and multimode fiber media can be removed. Additionally, singlemode fiber media is significantly smaller than the copper media used on campus. These two factors combined will tend to ease the shortage of duct space on campus. This section defines design considerations for outside plant communications media (cable and connecting hardware) that are of particular concern to CWU. The Designer is expected to refer to the TIA/EIA standards and the BICSI CO-OSP and TDMM for other and more specific design criteria and detail.
GENERAL DESIGN CONSIDERATIONS

Following is a list of general items to consider when selecting a communications media system: Direct-buried cable and aerial cable should not be used. If extenuating circumstances require the use of these cable types, the Designer must obtain approval from CWU in writing prior to finalizing the Construction Documents. Fiber optic cable shall not be spliced. CONSTRUCTION REFERENCE This may not be possible for The CWU Telecommunications Pathway Overbuild and Basic Construction if Outside Plant Master Plan has been the Designer must make use of the designed to minimize the amount of fiber existing fiber optic outside plant cable. splices necessary in the outside plant. Where cables are to be pulled through UCVs without splicing, the duct selected for cable installation shall be at the same elevation as it enters and exits the UCV. Changes in duct selections, especially in elevations, should be avoided to ensure that no damage occurs to the cable sheaths and that pulling tensions are kept as low as possible.

2011 Conley Engineering, Inc.

20

DESIGN CONSIDERATIONS Ducts are to be assigned during the course of design, not during construction. Duct assignments must be approved by CWU prior to the release of Construction Documents. If a multiple ducts are available for use, the bottom ducts should be used first in order to facilitate future cable placement. Communications cabling entering a building should be routed so as not to block or obstruct the planned usage or expansion of any other building that occupies or will occupy the space. For long cable runs, the longest cable reel lengths obtainable shall be used. Splices should not be used except where cable reel lengths are exceeded. If splices are used, the Designer should ensure that: 1. The cable ends to be spliced have permanent slack loops with sufficient length that the cable can be removed from the UCV and reach a satisfactory work surface for splice activities. 2. The splice location (UCV or EF) should have enough space for storing slack cable after the splice is completed. 50-foot service loops (cable slack) shall be provided for each end of a cable terminating in a building. Service loops (cable slack) shall be provided for fiber optic cabling that enters a building in the UCV nearest the building entrance. The length of cable in the service loop shall be sufficient that if a cable break occurs between the UCV and the building, sufficient slack cable would be available in the UCV to reterminate the fiber optic cabling at the existing patch panel, without the use of a splice. Communications backbone cables serving CONSTRUCTION REFERENCE different systems (i.e. voice, data, video) For New Construction, use shall be segregated6. Segregation can different ducts for cables serving different systems. For Overbuild occur by using different ducts (the most and Basic construction, the use of desirable solution), or it may occur by innerduct is an acceptable alternative although inductive using separate innerducts within the interference (see below) may be an same duct. issue. Sharing of ducts can produce Duct fill shall conform to the TIA/EIA undesirable inductive interference, can damage the facilities by standards and the NEC. subjecting the cable to abrasion For copper media, indoor dry splice and tensional stress if the facilities enclosures shall be installed prior to are pulled in at different times, and may present coordination problems terminating the copper cable on building between the various trades entrance protectors. involved. Cables are to be tagged (labeled) at locations near where they enter a UCV from a duct and near where they enter a duct to leave a UCV.
AND

GROUNDING

BONDING

CWU has standardized on considering all locations exposed for grounding, bonding, and electrical protection purposes. Cables with an outer metallic sheath shall be bonded at each UCV. Bond all other cables with dielectric components whenever a splice is made.

Segregation is desirable in order to ensure that when maintenance work is performed on a backbone cable serving a specific system, work on the cable will not disrupt the functionality of the backbone cables serving other systems
2011 Conley Engineering, Inc.

21

DESIGN CONSIDERATIONS When a splice occurs in a UCV, metallic sheath components in the cable(s) and splice enclosures must be bonded to the UCV grounding system. Additionally, cable shield bond continuity shall be maintained. Bonds should be made with #6 AWG solid copper wire not more than 20 long. If over 20, the conductor must be sized according to NEC requirements. Cables should be grounded as close to the entrance of the buildings as possible.
INNERDUCT

The use of innerduct for subducting purposes is strongly encouraged (although it may not be applicable to every situation). CWU has standardized on three configurations for subducting a 4-inch conduit with innerduct: Three 1 innerducts Two 1 and one 1 innerduct Four 1 innerducts

It is left to the Designer to select the most appropriate configuration for subducting based upon the conditions of the duct and the application. Innerduct shall not be filled with cable beyond 50% capacity.
MEDIA TYPES

CWU recognizes three types of communications media for the campus backbone system: Category 3 UTP (copper) used for voice, analog signaling, and various metering applications Singlemode Fiber Optic used for data, video, and increasingly, voice applications 62.5/125 m Multimode Fiber Optic used primarily for data applications and various metering applications.

As discussed above, CWU has standardized on singlemode fiber for its voice, data, and video applications. However, copper and multimode fiber media will still be in use for some time. The type and quantity of communications media to install will vary greatly depending upon the application. In keeping with the recommendations made in the CWU Telecommunications Pathway Outside Plant Master Plan, typical communications media configurations are shown below. It should be noted that these typical configurations should serve as a guideline only. The type and quantity of communications media shall be determined on a case-bycase basis by the Designer, ensuring that it meets the needs of the application at hand and provides for future expansion capability.
BETWEEN BUILDING CLUSTER HUBS
AND

BUILDINGS

Singlemode Fiber:

12-Strands (4 Data, 4 Video, 4 Spare)

CONSTRUCTION REFERENCE
Hybrid fiber cable is permitted in
Residence Halls only. CWU uses 12 SM/12MM hybrid fiber optic cable for these applications. 22

2011 Conley Engineering, Inc.

Multimode Fiber: Copper:

DESIGN CONSIDERATIONS 24-Strands (4 Data, 2 Access Control, 4 Fire Alarm, 2 HVAC Control, 2 Power Metering, 10 Spare) 25-Pairs
AND THE

BETWEEN BUILDING CLUSTER HUBS

COMMUNICATIONS CENTER

Singlemode Fiber: Multimode Fiber: Copper:


BETWEEN
THE

48-Strands 24-Strands 0-Pairs


AND THE

COMPUTER CENTER

COMMUNICATIONS CENTER

Singlemode Fiber: Multimode Fiber: Copper:


TERMINATION

96-Strands 48-Strands 0-Pairs

Separate fiber patch panels shall be provided for multimode and singlemode fiber optic cabling. Fiber optic media shall be terminated on separate fiber patch panels depending upon fiber type.

CONSTRUCTION REFERENCE
For Residence Halls served by
hybrid fiber: A single patch panel may be used to terminate both types of fiber in the hybrid cable separate fiber patch panels are not required in this case.

Copper media shall always be terminated on building entrance protectors.


LABELING
AND

ADMINISTRATION

It is the responsibility of the Designer to ensure that the Construction Documents clearly define the labeling requirements and that the Contractor properly labels all outside plant media during construction. Inadequate or incomplete labeling is not acceptable. Refer to the Master Specification Section 16741 - Outside Plant Communications Circuits for more information.

2011 Conley Engineering, Inc.

23

DESIGN CONSIDERATIONS

ENTRANCE FACILITIES
This section defines design considerations for entrance facilities that are of particular concern to CWU and specific to the outside plant communications distribution system. The Designer is expected to refer to the TIA/EIA standards and the BICSI COOSP and TDMM for other and more specific design criteria and detail. In addition, the Designer is expected to reference the CWU Inside Plant Communications Distribution Design Guide for more detail regarding the design of telecommunications spaces, including entrance facilities and equipment rooms.
GENERAL DESIGN CONSIDERATIONS

Following is a list of general items to consider when designing pathway and communications media into a building entrance facility: In general, a structural engineer should approve all structural changes or penetrations into a building. The entrance facility shall not be more than 50 from the actual entrance into the building. In order to comply with NEC requirements, not more than 50 of an outside plant cable can be exposed between the entrance conduit stub and the cable termination point. If more than 50 is required, the cable7 must be routed in rigid metallic conduit. Fire-rated tape wrap is not acceptable. Ducts entering a building shall transition to PVC coated rigid steel conduit a minimum of 10 feet prior to entering the building. Ducts shall enter the entrance facility parallel to the backboard to be used. Ducts shall not enter perpendicular to the backboard surface, which could cause cables to be bent sharply. Below grade ducts should extend 4 above finished floor. Building entrance protectors (primary protectors) should be provided for all OSP copper cables and should support both primary (overvoltage) and secondary (overcurrent) protection.
AND

GROUNDING

BONDING

CWU has standardized on considering all locations exposed for grounding, bonding, and electrical protection purposes. The ground terminal for building entrance protectors should be bonded directly to the electrical power ground.

Some types of fiber media are now indoor/outdoor rated and are therefore not subject to this requirement.
2011 Conley Engineering, Inc.

24

APPENDICES

APPENDICES

APPENDIX 1 CONSTRUCTION DRAWINGS


Construction drawings should be thoroughly and accurately marked. Listed below are items that should be included on construction drawings, dependent upon the type of project8: Routing of the pathway system, including ductbanks and UCVs. Physical locations of obstructions, including UCVs, ductbanks, buildings, roads, poles, existing underground utilities. Duct configurations indicating duct sizes and types between UCVs and between UCVs and buildings. Duct contents indicating cable assignments. UCV and building cable racking diagrams (elevations) indicating the positions of all existing and new cables and splice enclosures. Backboard/entrance facility elevations within buildings. Pair sizes, gauges, and types of copper cables. Strand counts and types of optical fibers. Drain slope requirements Labeling Phasing (if required) Staging

Much of the following list was excerpted from RUS Bulletin 1751F-644 Underground Plant Construction

2011 Conley Engineering, Inc.

25

APPENDICES

APPENDIX 2 BIBLIOGRAPHY

AND

REFERENCES

AMP, Planning & Installation Guide BICSI, Customer-Owned Outside Plant Design Manual BICSI, Telecommunications Distribution Methods Manual CWU, Telecommunications Pathway Outside Plant Master Plan CWU, Outside Plant Communications Distribution System Master Specification CWU, Premises Communications Distribution System Master Specification CWU, Premises Communications Distribution Design Guide IEEE, National Electrical Safety Code (NESC), 1997 Edition NEC, National Electrical Code (NEC), 1999 Edition OSHA, Code of Federal Regulations (CFR) Parts 1910 - General Industry, and 1926 - Construction Industry, et al RUS, Bulletin 1751F-643 Underground Plant Design, 1998 RUS, Bulletin 1751-644 Underground Plant Construction, 1998 RUS, Bulletin 1751-815 Electrical Protection of Outside Plant, 1998 Siecor, Siecor Standard Recommended Procedures for Installation, 1998 TIA/EIA 758, Customer-Owned Outside Plant Telecommunications Cabling Standard TIA/EIA 568A, Commercial Building Telecommunications Cabling Standard TIA/EIA 569A, Commercial Building Standards for Telecommunications Pathways and Spaces TIA/EIA 606, Administration Standards for the Telecommunications Infrastructure of Commercial Buildings TIA/EIA 607, Commercial Building Grounding and Bonding Requirements for Telecommunications

2011 Conley Engineering, Inc.

26

You might also like