Pahang Cement Sdn Bhd

(A YTL COMPANY)

WORK INSTRUCTION
Page 1 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date: Scope

Rev. #: 01 1.0 1.1 1.2 1.3 1.4

Carbon brush and slip ring maintenance (Short maintenance) Carbon brush and slip ring condition monitoring (Short maintenance) Oil cool starter maintenance (3 months once) Motor terminal maintenance (6 months once)

2.0

Responsibility

Engineer / Engineering Executive / Asst. Executive E/I

3.0

Safety Requirements

3.1 To wear PPE with hand gloves, dust mask, goggles, ear plug and relevant
protection equipment. 3.2Make sure equipment isolated following procedure before start the works.

4.0

Environmental Requirements

Refer to DOC#: EWI-PR-011 Requirement when working in Dusty Environment.

5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4

Procedure Prepare maintenance equipment: Paint brush SSO extension Working light Spanner set

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 2 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date: Megger meter 5.1.6 Blower 5.1.7 5.1.8 5.1.9 Caliper Cotton rag

Rev. #: 01 5.1.5

Replacement part eg. carbon brush, contact plate, filter etc Maintenance on motor carbon brush and slip ring

5.2

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 3 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date:

Rev. #: 01

5.3

Maintenance on oil cool starter

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 4 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date:

Rev. #: 01

5.4

Maintenance on motor terminal

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 5 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date:

Rev. #: 01

6.0

Appendix

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 6 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date:

Rev. #: 01

Pahang Cement Sdn Bhd


(A YTL COMPANY)

WORK INSTRUCTION
Page 7 of 7 Prepared by: Initial: Approved by: Initial:

XXX Department DOC # : WI XX-00X Title: MAINTENANCE OF COAL MILL MAIN DRIVE MOTOR (713.01) Rev Date: REVISION HISTORY REV. NO 1 DATE DESCRIPTION Initial Release

Rev. #: 01

REVISED BY -