You are on page 1of 18

RTN commissioning with weblct V2R5 V1.

0
Optical network product service department HW Xing Zibin 59397

1/Login the NE for new device The IP address of your laptop must be network section 129.9.x.x, the mask must be 255.255.0.0 Open weblct, and click the NE search.

Please be sure the domain must be 129.9.255.255 that is by default. Then click search. Click add NE after searching the NE. Cancel the NE searchdialog box.

2012-1-27

1 , 18

Select the NE that you want to login, and click the NE login, the use name is root or lct by default, password is password.

Click the NE Explore to open the NE Explore.

2012-1-27

2 , 18

2/Commissioning Quick configuration: For PDH MW (there is no line board (Optical board/Electronic board/Ethernet service board), and must be single direction MW), the Quick configuration is the best method for commissioning. But please remember the Quick configuration is only for new device. Strongly recommend Quick configuration is only for 10 system. Step1: Modify the NE name and NE ID Please modify the NE name and NE ID as planed. For example: there are several sets of IDU, if the NE ID of a IDU is 12 and the site name is upper23, the NE name is 12-upper23-1 and others maybe 13-upper23-2 or 14-upper233 IF there is no plan, please contact with HW engineer. You must not modify the extended NE ID, NE IP address and gateway IP address if there is no plan. If you modify the NE ID, the SCC board will be reset. You can close the NE Explore and delete the NE in NE list. Then you can search the NE and login again.

2012-1-27

3 , 18

Step2: Quick configuration Please click next and select the capacity and modulation configure the TX Frequency and TX power for the link as planed. If there is no plan for link ID and T/R spacing, please leave them (no need to change) and they are 1 and 0 respectively by default.

Please select how many E1 service we want to use as planed.

2012-1-27

4 , 18

Please select the clock source as planed. If there is no plan, please select the internal clock source for clock level 1 or contact with HW engineer.

Please configure the order wire and click next. Maybe there is no plan for order wire. But strongly recommend, the high site is 101 and low site is 102.

2012-1-27

5 , 18

If you make sure the configuration is ok, please click Apply and finish the Quick configuration.

Step3: NE time synchronization Before you configure the NE time synchronization, you must make sure you the time of your laptop is the local time. Then please double click the synchronous mode and select the NM, click apply.

2012-1-27

6 , 18

Right click and select the synchronize with NM time

Step4: 15min/24hour performance monitor Select the NE you want to configure the performance. Select the enable for 15-minute and 24-hour. If the operation is failed, please select the next day for form time and must not select the to time.

2012-1-27

7 , 18

Congratulations for you, if you finish the 4 steps! General configuration: General configuration is for any configuration of RTN 610 and RTN 620. Step1: Add boards Please first add the PXC board, then you can add others

Step2: Modify the NE name and NE ID Please modify the NE name and NE ID as planed. For example: there are
2012-1-27 8 , 18

several sets of IDU, if the NE ID of a IDU is 12 and the site name is upper23, the NE name is 12-upper23-1 and others maybe 13-upper23-2 or 14-upper233 IF there is no plan, please contact with HW engineer. You must not modify the extended NE ID, NE IP address and gateway IP address if there is no plan. If you modify the NE ID, the SCC board will be reset. You can close the NE Explore and delete the NE in NE list. Then you can search the NE and login again.

Step3: IF 1+1 protection Click the new and open the IF 1+1 protection dialog box. Select the working mode as planed, and select the working board and protection board. Please make sure the working board must be connect to main ODU that installed on main interface of coupler. The protection group ID, revertive mode, WTR time and reverse switching are by default, no need to change if there is no design. Click ok.

2012-1-27

9 , 18

Step4: IF configuration (radio work mode/link id/ATPC) Please select the capacity and modulation for the link as planed. No need to change the link ID if there is no design. Dont enable the ATPC if no requirements or design. If its a 1+1 system, only configure the main IF board.

Step5: ODU configuration (TX Frequency/TR spacing/TX power/transmission status of ODU including main and standby) Configure the TX Frequency as planed; The T/R Spacing is 0 by default, no need to change!

2012-1-27

10 , 18

Configure the TX power as planed.

Configure the transmission status of ODU. If its a 1+1, make sure the configure transmission status of ODU including main and standby ODU must be unmute

2012-1-27

11 , 18

Step6: Cross-connection

Step7: Clock source priority

2012-1-27

12 , 18

Step8: Order wire If there is no design for order wire, strongly recommend it is 101 for high site and 102 for low site.

Step9: NE time synchronization Before you configure the NE time synchronization, you must make sure you the time of your laptop is the local time. Then please double click the synchronous mode and select the NM, click apply.

2012-1-27

13 , 18

Right click and select the synchronize with NM time

Step10: 15min/24hour performance monitor Select the NE you want to configure the performance. Select the enable for 15-minute and 24-hour. If the operation is failed, please select the next day for form time and no need to select the to time.

2012-1-27

14 , 18

Extended ECC Mode If there are less than 4(including 4 ) IDUs in one shelter, you can connect the IDUs( EHT and EHT-HUB port on SCC board, EHT cable) like the picture as follows, and then set the Extended ECC Mode to Auto mode. After finishing, you can manage all IDUs in one MW network.

2012-1-27

15 , 18

IF 1+1 protection Please pay more attention to switching status of device and active board of device", please make sure they are normal and the active board is the main board. You can use the clear to change the switching status of device to normal.

loopback. Set the E1 loop back for example. (Other loopback is like this.) Inloop is internal, and outloop is external.
2012-1-27 16 , 18

PRBS TEST Please pay more attention to the testing direction! Before doing PRBS test, first confirm the cross-connecting of the near end and far end is ready!

2012-1-27

17 , 18

Remark: When aligning the antennas, turn off the standby ODU and make sure the ATPC is disabled, if it is a 1+1 system. If the both of IF boards and ODUs are normal, but the receive power of Main ODU is less about 6dBm than standby ODU, maybe the main ODU connects to the standby IF board. You can turn off the main and standby ODUs power, and then exchange the IF jumpers of main and standby IF boards.

2012-1-27

18 , 18

You might also like