Supply and run of 2 of 126 /0.4mm (16 Sq.mm) F.R PVC insulated flexible copper cable in existing pipe for mains including all labour charges etc., complete.
1 2
3 4 5 6 10
Taking Output = 100 M a) Material run of 4of 126 /0.4mm (16 Sq.mm) run of 1 of 84/0.3mm (4.0 Sq.mm) b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers C) Cost for 100 RM Municipal Allowance @25% Rate per Metre = C/100 Note : Labour Charges considered for 100 M / day Add over heads @14%
Supply and run of 2 of 126 /0.4mm (10 Sq.mm) F.R PVC insulated flexible copper cable in existing pipe for mains including all labour charges etc., complete.
200.00 100.00
Mtrs Mtrs
100 100
Mtrs Mtrs
12320.00 3478.20
24640.00 3478.20
1 1 1
11 12
41.71
339.60
3.1.6
1 2
3 4 5 6 10
Taking Output = 100 M a) Material run of 2of 126 /0.4mm (10 Sq.mm) run of 1 of 84/0.3mm 4.0 Sq.mm) b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers C) Cost for 100 RM Municipal Allowance @25% Rate per Metre = C/100
200.00 100.00
Mtrs Mtrs
100 100
Mtrs Mtrs
7480.00 3478.20
14960.00 3478.20
1 1 1
11
12
Note : Labour Charges considered for 100 M / day Add over heads @14% Supply and Run of 2 of 56/0.3mm (4.0 Sq.mm) with Run 1 of 14/0.3mm (1.0 Sqmm) Fire Retardant (FR) / FRLS P.V.C. insulated flexible ISI mark copper cable of RPG / Havells / Polycab make in existing pipe for run of mains including all labour charges etc., complete. Taking Output = 100 M a) Material Run of 2 of 56/0.3mm (4.0 Sq.mm) Run 1 of 14/0.3mm (1.0 Sqmm) b) Labour charges : Skilled Electrician Semi Skilled Electrician Helpers C) Cost for 100 RM Municipal Allowance @25% Rate per Metre = C/100 Note : Labour Charges considered for 100 M / day Add over heads @14%
28.15
229.25
3.1.5
1 2
200.00 100.00
Mtrs Mtrs
100 100
Mtrs Mtrs
3478.20 1001.00
6956.40 1001.00
3 4 5 6 10
1 1 1
11 12
13.48 109.77