LAMPIRAN SURAT PENAWARAN HARGA

: 060.RKS/613/B2/PPBJ-B/AREABKS/2014
: PENANAMAN SKTM UNTUK PEMOTONGAN BEBAN PENYULANG KIWI

: ..

SAT

VOL

SKTM

sktm
sktm
sktm
sktm

MATERIAL
Kabel tanah TM 20 KV - 3 x 240 mm2 (NA2XSEFGbY)
mtr
Straight Joint 20 KV XLPE - 3x240 mm2 Heat strink
set
Mur Baut
Bh
Pipa Galvanis 4 " x 3m medium B
bh
Dudukan Outdoor Termination Tiang Tunggal
set
Outdoor Termination 20 KV XLPE - 3x240 mm2
set
Besi UNP 15/15 stangkup lengkap duri,cat dan las
mtr
Pipa PVC D 5" (tebal 5mm) - AW/m (boring Cross jalan)
mtr
Label timah untuk tanda kabel, Lengkap Nama Penyulang & GI
bh
( 300x25x1 mm )
Patok tanda mof / tanda kabel
bh
Pasir urug
m3
Batu pelindung kabel
bh
Papan peringatan tanda galian kabel
bh

sktm
sktm2
sktm
sktm
sktm
sktm
sktm
sktm
sktm

JASA
Pemasangan KTM - 1 ( 1 kabel dibawah berm )
Pemasangan Jointing 20 KV
Perbaikan galian pada berm 1s/d 2 kbl
Pasang Kanal UNP 15 setangkup
Boring 1 kabel ( Sejajar Jalan )
Boring 1 kabel ( Crossing Jalan )
Pemasangan label timah
Pemasangan patok tanda kabel tiap 50 mtr
Pemasangan patok tanda mof / jointing

sktm
sktm2
sktm4
sktm4
sktm4
sktm4
sktm
sktm
sktm

10,990
44
3
1
1
1
22
175
1,187
215
223.00
6,693
8

mtr
bh
mtr
mtr
mtr
mtr
bh
bh
bh

2,231
44
2,231
22
8,472
175
1,187
171
44

set
set
set
set
set

1
1
6
6
3

SUTM
tiang tm5
sutm
sutm
sutm
sutm

MATERIAL
LBS Mekanik 24 kV 630 A lengkap OD
Travers Afspan UNP 10 - 3.000 mm
Isolator Afspan / Suspension Isolator
Strain clamp 70-150
Arester 20 kV 10 kA

SAT

VOL

SKTM
sutm
sutm
sutm
sutm
sutm
sutm
sutm
sutm
sutm
sutm
sutm

sutm
sutm
sutm
sutm
sutm
sutm
sutm
sutm

Sepatu kabel Al 240


Compression Joint / Joint Sleep 150
CCO 150 / 150
CCO 150 / 70
Pipa galvanis 0,75 " x 3m u/pelindung Ardhe
Conductor bare CU 50 mm2
Earthing road 16 x 2500 sqmm + klem
Stainless Steel Strip
Link 25 x 25
Stoping Buckle
A3CS 150 mm

bh
bh
bh
bh
btg
mt
btg
mtr
bh
bh
mtr

JASA
Pasang konstruksi TM 13B ( Lengkap Pipa , Arrester ,
set
Pentanahan & psg OutDoor ) Kabel naik traves tumpu
set
Pasang konstruksi TM 15B ( LBS Tiang )
set
Bongkar konstruksi TM 1B
bh
Pasang Compression Joint / Joint Sleep 150
bh
Pasang CCO 150 / 150
set
Pasang pentanahan TM tunggal
kms
Penarikan jaringan A3CS 3 x 150 mm
gw
Bongkar jaringan A3C 3 x 35 mm

3
2
9
3
3
54
6
15
15
15
153

1
1
1
2
6
1
0.048
1

SAT

VOL

SKTM
LAIN - LAIN
lain
lain

Angkutan ( Truk Engkel )


Foto Dokumentasi

unit
set

45
1

MATERIAL

SUBTOTAL
PPN (10%)
TOTAL

JASA

SUBTOTAL
PPN (10%)
TOTAL

SURAT PENAWARAN HARGA

EBAN PENYULANG KIWI

HARGA SATUAN

JUMLAH

KETERANGAN

5,750,000
41,250
222,750
687,500
2,750,000
478,500
151,250

253,000,000
123,750
222,750
687,500
2,750,000
10,527,000
26,468,750

17,325

20,564,775

49,500
288,600
6,600
372,690
Sub Jumlah I A

10,642,500
64,357,800
44,173,800
2,981,520
436,500,145

52,180
680,680
17,300
478,500
276,250
427,500
3,465
12,760
12,760
Sub Jumlah I B

116,413,580
29,949,920
38,596,300
10,527,000
2,340,390,000
74,812,500
4,112,955
2,181,960
561,440
2,617,545,655

Disediakan PLN

Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN

HARGA SATUAN

JUMLAH

KETERANGAN

Sub Jumlah II A

787,310

787,310

2,621,560
85,000
37,500
27,500
173,520
24,850,000
497,160
Sub Jumlah II B

2,621,560
85,000
75,000
165,000
173,520
1,192,800
497,160
5,597,350

Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN
Disediakan PLN

HARGA SATUAN

995,100
375,440
Sub Jumlah IX

JUMLAH
44,779,500
375,440
45,154,940

SUBTOTAL
PPN (10%)
TOTAL

436,500,145
43,650,015
480,150,160

SUBTOTAL
PPN (10%)
TOTAL

2,668,297,945
266,829,795
2,935,127,740
TOTAL

3,415,277,899

Nama Kota, 10 Desember 2014


PT. TATA WAHANA TEKNIK

Ir. SALAMAT SIMANGUNSONG


Direktur

KETERANGAN

ANALISA HARGA JASA PEKERJAAN SKTM

NO
I
1

II

HARGA
SATUAN

URAIAN
PEKERJAAN GALIAN
GALIAN PADA TANAH KERAS /KORAL /BERM
a. 1 dan 2 Jalur
- Galian Tanah Keras/Koral/Berm
0.65
b. Galian Lubang Penyuntikan Kabel
- Galian Tanah Keras/Koral/Berm
0.98
c. Galian Lubang Sambungan
- Galian Tanah Keras/Koral/Berm
5.07
d. Galian Lubang Pengeboran Manual Crossing
- Galian Tanah Keras/Koral/Berm
9.00
e. k. Galian Lubang Pengeboran Manual Sejajar Jalan
- Galian Tanah Keras/Koral/Berm
2.40

m3

52,210.00

m3

52,210.00

m3

52,210.00

m3

52,210.00

m3

52,210.00

PEKERJAAN PENARIKAN DAN PENYAMBUNGAN


1 a. Penarikan/Penggelaran Kabel 3 x 240 mm2 / meter
1 Hari / 8 Jam = 500 Meter
- Penanggung Jawab teknik
8 jam
- Mandor
1 hr
- Pekerja
75 hr

33,360.00
184,800.00
115,680.00

Biaya Penggelaran kabel /meter


9,127,680 /
b. Penarikan/Penggelaran Kabel 3 x 300 mm2/meter
1 Hari / 8 Jam = 500 Meter
- Penanggung Jawab teknik
- Mandor
- Pekerja

500

8 jam
1 hr
75 hr

Biaya Penggelaran kabel /mete


9,127,680 /
2 a. Penyambungan SKTM 20 kV 3x150 / 240 / 300 mm2 / Set
Dengan Pola S / E 009.E/465/PD.IV/1996
1 Hari / 6 Jam = 1 Set
- Penanggung Jawab teknik
3 jam
- Jointer
6 jam
- Tukang Listrik
6 jam
- Supervisi (Pabrikan)
- Supervisi (Kontraktor)
b. Terminasi Kabel Outdoor 20 KV 3x150, 3x240, 3x300 mm2/set
Dengan Pola S / E 009.E/465/PD.IV/1996
1 Hari / 4 Jam = 1 Set
- Penanggung Jawab teknik
1 jam
- Jointer
4 jam
- Tukang Listrik
4 jam
- Pekerja
1 Pek.
- Supervisi (Pabrikan)
- Supervisi (Kontraktor)

33,360.00
184,800.00
115,680.00
500

33,360.00
30,780.00
26,820.00

33,360.00
30,780.00
26,820.00
115,680.00

IV

PEKERJAAN PENGEBORAN CROSSING JALAN


Crossing / Boring Manual
- Boring Manual
1.00 m'
- Pengadaan PVC ( per- meter
151,250.00
1.00 m'
Harga Pengeboran / Meter
258,000.00 +
151,250.00
Boring Mesin ( Lihat HS.Boring Mesin / Sesuai Kontrak )

2
3

V
1

Pengeboran Sejajar Jalan


- Boring Manual

1.00 m'

258,000.00
151,250.00

258,000.00

PEKERJAAN PERBAIKAN BEKAS GALIAN (BERIKUT MATERIAL)


PERBAIKAN BEKAS GALIAN PADA TANAH KERAS /KORAL /BERM
a. 1 dan 2 Jalur
- Urugan Tanah Keras/Koral/Berm
0.55 m3
- Pemadatan (2x)
0.50 m2

20,190.00
12,404.00

b. Lubang Penyuntikan Kabel


- Urugan Tanah Keras/Koral/Berm
- Pemadatan (2x)

0.97 m3
0.75 m2

20,190.00
12,404.00

4.29 m3
3.90 m2

20,190.00
12,404.00

d. Lubang Pengeboran Manual Crossing jalan


- Urugan Tanah Keras/Koral/Berm
- Pemadatan (6x)

8.40 m3
3.00 m2

20,190.00
22,210.00

e. Lubang Pengeboran Manual Sejajar Jalan


- Urugan Tanah Keras/Koral/Berm
- Pemadatan (6x)

2.08 m3
1.60 m2

20,190.00
22,210.00

c.

Lubang Sambungan
- Urugan Tanah Keras/Koral/Berm
- Pemadatan (2x)

VI PEKERJAAN LAIN - LAIN


1
Pembuangan tanah bekas galian dengan truck kapasitas 3-4 m3
jarak s/d 20 Km (Volume yang dibuang = lebar galian x (tinggi
lapisan pasir urug + lapisan penutup galian) x panjang trace galian )/m3
2
Penjagaan/hari kalender
- 1 Pekerja / Hari
101,220.00
3
Penyediaan tenaga untuk bantu pengujian kabel TM PLN/lokasi
- Pekerja
2.00 hr
101,220.00
- Instalator
2.00 hr
128,100.00
VII
1

PEKERJAAN PENGANGKUTAN KABEL


Angkutan Kabel TM./Meter
a. Angkutan SKTM
10 - 50 meter
b. Angkutan SKTM
50 - 200 meter
Angkutan Kabel TM./Haspel
a. Angkutan SKTM 1 Haspel
b. Angkutan SKTM 2 Haspel
c. Angkutan SKTM 3 Haspel

1.00 rit
1.00 rit

356,700.00
588,900.00

1.00 rit
1.00 rit
1.00 rit

968,730.00
1,325,350.00
1,563,100.00

IX

DIREKSI KEET
a. Pengadaan & pemasangan pagar pengaman dari seng (1,8mx1,8m)/ buah
- Seng (tebal 0,02 cm x 90 cm x 180 cm)
2.00 lbr
38,500.00
- Balok Kayu 5/7 Meranti Palembang
2.00 btg
77,000.00
- Paku seng
0.50 kg
44,000.00
- Cat Dua Warna
0.50 kg
42,350.00
- Pekerja
0.50 hr
115,680.00
- Tukang kayu
0.25 hr
162,720.00

M
JUMLAH
HARGA

TOTAL
DIBULATKAN

33,936.50

33,930.00

52,210.00

51,165.80

51,160.00

52,210.00

264,704.70

264,700.00

52,210.00

469,890.00

469,890.00

52,210.00

125,304.00

125,300.00

52,210.00

266,880.00
184,800.00
8,676,000.00
9,127,680.00
18,255.36

18,250.00

266,880.00
184,800.00
8,676,000.00
9,127,680.00
18255.36

18,250.00

100,080.00
184,680.00
160,920.00
150,000.00
85,000.00
680,680.00

680,680.00

33,360.00
123,120.00
107,280.00
115,680.00
150,000.00
85,000.00
614,440.00

614,440.00

258,000.00
151,250.00
409,250.00

409,250.00

258,000.00

258,000.00

11,104.50
6,202.00
17,306.50
19,584.30
9,303.00
28,887.30
86,615.10
48,375.60
134,990.70
169,596.00
66,630.00
236,226.00

20,190.00
12,404.00
17,300.00
20,190.00
12,404.00
28,880.00
20,190.00
12,404.00
134,990.00
20,190.00
22,210.00
236,220.00

41,995.20
35,536.00
77,531.20

77,530.00

85,000.00

85,000.00

101,220.00

101,220.00

202,440.00
256,200.00
458,640.00

458,640.00

356,700.00
588,900.00

356,700.00
588,900.00

356,700.00
588,900.00

968,730.00
###
###

968,730.00
###
###

968,730.00
1,325,350.00
1,563,100.00

20,190.00
22,210.00

77,000.00
154,000.00
22,000.00
21,175.00
57,840.00
40,680.00
372,695.00

372,690.00

ANALISA HARGA JASA PEKERJAAN SUTM


NO

HARGA
SATUAN
(Rp.)

URAIAN PEKERJAAN

I PEKERJAAN PEMASANGAN
1 PEMBUATAN PONDASI TIANG BESI & BETON
a Pondasi Tiang 11 meter
Pondasi Tiang 11 m 350 daN Type A jenis 1 (tanah biasa)
- Galian Tanah Biasa
0.36
m3
- Sirtu Padat
0.21
m3

50,210.00
185,000.00

2 PEMASANGAN & PENGADAAN PERLENGKAPAN TIANG


a Pemasangan Travers
1 Travers tunggal : UNP 10 - 1800 mm
- Pemasangan : Mandor
0.08
org
Instalator
0.67
org

184,800.00
146,400.00

Travers ganda : UNP 12 - 2200 mm


- Pemasangan : Mandor
Instalator

0.17
1.50

org
org

184,800.00
146,400.00

Travers ganda : UNP 12 - 2400 mm


- Pemasangan : Mandor
Instalator

0.17
1.50

org
org

184,800.00
146,400.00

Pemasangan Suspensi Assembly (12 bh/hari)


Pemasangan :
Mandor
1.00
Instalator
3.00
Pekerja
6.00

org
org
org

184,800.00
146,400.00
115,680.00

Pemasangan per-buah
Pemasangan Small Angle Assembly (12 bh/hari)
Pemasangan :
Mandor
1.00
Instalator
4.00
Pekerja
8.00

org
org
org

184,800.00
146,400.00
115,680.00

Pemasangan per-buah
Pemasangan Large Angle Assembly (12 bh/hari)
Pemasangan :
Mandor
1.00
Instalator
4.00
Pekerja
6.00

org
org
org

184,800.00
146,400.00
115,680.00

Pemasangan per-buah
Pemasangan Dead End Assembly (12 bh/hari)
Pemasangan :
Mandor
1.00
Instalator
4.00
Pekerja
6.00

org
org
org

184,800.00
146,400.00
115,680.00

Pemasangan per-buah

b PEMASANGAN ISOLATOR
1 Pin Isolator
- Pemasangan : Mandor
Instalator

1.00
1.00

org
org

184,800.00
146,400.00

Pemasangan per - buah


Hang Isolator
- Pemasangan : Mandor
Instalator

1.00
1.00

org
org

184,800.00
146,400.00

Pemasangan per - buah


c PEMASANGAN POLE TOP SWITCH
- Pemasangan : Mandor
Instalator
Pekerja

0.50
2.00
2.00

org
org
org

184,800.00
146,400.00
115,680.00

d PEMASANGAN LOAD BREAK SWITCH (LBS) TIANG SUTM


- Pemasangan : Mandor
0.50
org
Instalator
2.00
org
Pekerja
2.00
org
- Sewa Crane :
4.00
jam
e PEMASANGAN PIPA ARDE ( 1.25" - L = 3 mtr/btg)
- Pekerja
3.00
org
Pemasangan per - buah
f PENARIKAN KAWAT HANTARAN/GAWANG (Jarak max.40 m)
1 A3C 3 x 35 s/d 150 mm2 (2 gw/hari)
- Penarikan :
Mandor
1.00
org
Instalator
6.00
org
Pekerja
8.00
org

2
3

Pemasangan per-gawang
Pemasangan Per-meter
Pemasangan Terminal Outdoor 150 s/d 300 mm/set
Pemasangan Kawat Pengikat Hantaran di Isolator
- Pemasangan : Instalator
1.00
org

Pemasangan per - buah


h PENGADAAN DAN PEMASANGAN TANDA KILAT 20
Bahan Plat 20 cm x 30 cm, tebal Plat 2 mm
- Pengecatan
- Ongkos Pasang Instalator
1.00
Pekerja
1.00
Sewa Motor
1.00

KV
m2
m2
org
org
bh

Pemasangan per - buah


PENGADAAN DAN PEMASANGAN PENGHALANG PANJAT
- Pengadaan
- bh
- Ongkos Pasang Instalator
1.00
org
Pekerja
1.00
org
Kendaraan Pick - Up
1.00
bh

184,800.00
146,400.00
115,680.00
475,000.00

115,680.00

184,800.00
146,400.00
115,680.00

146,400.00

146,400.00
115,680.00
65,000.00

146,400.00
115,680.00
450,000.00

Pemasangan per - buah


PEMASANGAN ARRESTER
- Pengadaan Besi Dudukan Arrester
- Pemasangan : Mandor
Instalator
Pekerja
- Angkutan
Pemasangan per - buah

0.50
2.00
1.00
1.00

set
org
org
org
rit

184,800.00
146,400.00
115,680.00
356,700.00

TM
JUMLAH
HARGA
(Rp.)

TOTAL
DIBULATKAN
(Rp.)

18,075.60
38,850.00
56,925.60

56,920.00

15,400.00
97,600.00
113,000.00

113,000.00

30,800.00
219,600.00
250,400.00

250,400.00

30,800.00
219,600.00
250,400.00

250,400.00

184,800.00
439,200.00
694,080.00
###
109,840.00

109,840.00

184,800.00
585,600.00
925,440.00
###
141,320.00

141,320.00

184,800.00
585,600.00
694,080.00
###
122,040.00

122,040.00

184,800.00
585,600.00
694,080.00
###
122,040.00

122,040.00

184,800.00
146,400.00
331,200.00
33,120.00

33,120.00

184,800.00
146,400.00
331,200.00
41,400.00

41,400.00

92,400.00
292,800.00
231,360.00
616,560.00

616,560.00

92,400.00
292,800.00
231,360.00
###
###

###

347,040.00
173,520.00

173,520.00

184,800.00
878,400.00
925,440.00
###
994,320.00
24,858.00
185,000.00

994,320.00
24,850.00
185,000.00

146,400.00
14,640.00

14,640.00

146,400.00
115,680.00
65,000.00
327,080.00
21,805.33

21,800.00

146,400.00
115,680.00
450,000.00
712,080.00

47,472.00

47,470.00

92,400.00
292,800.00
115,680.00
356,700.00
857,580.00
428,790.00

428,790.00

Harga Satuan Bahan dan Upah


Harga Bahan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Seng (tebal 0.02 cm x 90 cm x 180 cm)


38,500 lbr
Batang Kaso 5/7 Meranti Palembang
77,000 btng
Paku Seng
44,000 kg
Cat Dua Warna
42,350 kg
63,800 bh
Patok tanda kabel 20 KV PLN
63,800 bh
Tegel tanda mof kabel 20 KV PLN
1,000 bh
Batu Bata
17,325 bh
Timah lebel ( 5 cm x 25 cm x 1.20 mm )
6,600 bh
Keramik tanda peringatan kabel PLN
380,000 m3
Pasir pasang
288,600 m3
Pasir Urug
478,500 m
Besi kanal UNP 15 (Double)
346,390 m
Besi kanal UNP . 120.55.7 (Double)
151,250 m
Pipa PVC 5'' (5 mm) Type AW
79,563 m
Joint PVC 5'' (5 mm) Type AW
Straight Joint 20 KV XLPE - 3 x 300 mm Heat Shrink 5,750,000 set
2,750,000 set
Outdoor Termination 20 KV XLPE - 3 x 300 mm
687,500 set
Dudukan Terminal Outdoor
41,250 bh
Mur Baut
46,750 kg
Tali pancing
49,500 bh
Tanda patok boring
30,250 m
Kawat Duri
Pipa Galvanize 4"
222,750 m'
Pengadaan/Pemasangan Angkur
20,350 bh
Pengadaan/Pemasangan besi uk. 85x45x6 mm
24,200 m'
Pengadaan/Pemasangan Klem besi
20,625 bh
Kabel Heater
23,375 m'
Harga Satuan Upah

1
2
3
4
5
6
7
8
9
10
11
12

Penanggung Jawab Tekni


Mandor
Tukang Listrik
Tukang Kayu
Tukang Batu
Jointer
Pekerja
Operator
Instalator
Pembantu Instalator
Supervisi (Pabrikan)
Supervisi (Kontraktor)

33,360
23,100
26,820
20,340
20,340
30,780
14,460
14,460
18,300
16,740

/
/
/
/
/
/
/
/
/
/

jam
jam
jam
jam
jam
jam
jam
jam
jam
jam

=
=
=
=
=
=
=
=
=
=

266,880
184,800
214,560
162,720
162,720
246,240
115,680
115,680
146,400
133,920
165,000.00
90,000.00

/
/
/
/
/
/
/
/
/
/
/
/

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

Tangerang, 10 Desember 2014


PT. TATA WAHANA TEKNIK

Ir. SALAMAT SIMANGUNSONG


Direktur