DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

SEMENTER I TAHUN 2015

No. URAIAN HP KAPASITAS BIAYA SEWA ALAT / JAM KET

C HARGA SEWA PERALATAN


1 ASPHALT MIXING PLANT 294.00 60.00 T/Jam 10,152,280.29
2 ASPHALT FINISHER 72.40 10.00 Ton 1,527,772.85
3 ASPHALT SPRAYER 4.00 850.00 Liter 67,798.78
4 BULLDOZER 100-150 HP 155.00 - - 850,735.03
5 COMPRESSOR 4000-6500 L\M 60.00 5,000.00 CPM/(L/m) 200,596.44
6 CONCRETE MIXER 0.3-0.6 M3 20.00 500.00 Liter 162,265.27
7 CRANE 10-15 TON 138.00 15.00 Ton 696,458.78
8 DUMP TRUCK 3.5 TON 100.00 3.50 Ton 461,482.88
9 DUMP TRUCK 10 TON 190.00 10.00 Ton 613,316.51
10 EXCAVATOR 80-140 HP 133.00 0.93 M3 758,952.66
11 FLAT BED TRUCK 3-4 M3 190.00 10.00 ton 544,934.11
12 GENERATOR SET 180.00 135.00 KVA 521,488.43
13 MOTOR GRADER >100 HP 135.00 10,800.00 - 836,480.14
14 TRACK LOADER 75-100 HP 70.00 0.80 M3 319,952.26
15 WHEEL LOADER 1.0-1.6 M3 96.00 1.50 M3 701,705.54
16 THREE WHEEL ROLLER 6-8 T 55.00 8.00 Ton 362,342.05
17 TANDEM ROLLER 6-8 T. 82.00 8.00 Ton 526,779.30
18 TIRE ROLLER 8-10 T. 100.50 9.00 Ton 568,271.29
19 VIBRATORY ROLLER 5-8 T. 82.00 8.00 Ton 451,391.21
20 CONCRETE VIBRATOR 5.50 25.00 - 44,739.20
21 STONE CRUSHER 220.00 50.00 T/Jam 761,800.73
22 WATER PUMP 70-100 mm 6.00 - - 45,143.51
23 WATER TANKER 3000-4500 L. 100.00 4,000.00 Liter 342,374.81
24 PEDESTRIAN ROLLER 8.80 835.00 Kg 90,736.08
25 TAMPER 4.70 121.00 Kg 47,177.32
26 JACK HAMMER - 1,330.00 - 34,360.88
27 FULVI MIXER 345.00 2,005.00 - 1,276,913.97
28 CONCRETE PUMP 100.00 8.00 M3 299,315.31
29 TRAILER 20 TON 175.00 20.00 Ton 585,648.91
30 PILE DRIVER + HAMMER 25.00 2.50 Ton 280,316.64
31 CRANE ON TRACK 35 TON 125.00 35.00 Ton 511,553.96
32 WELDING SET 40.00 250.00 Amp 130,437.58
33 BORE PILE MACHINE 150.00 2,000.00 Meter 858,359.74
34 ASPHALT LIQUID MIXER 5.00 1,000.00 Liter 42,825.87
35 TRONTON 150.00 15.00 Ton 511,813.77
36 COLD MILLING MACHINE 248.00 1,000.00 M 1,748,163.11
37 ROCK DRILL BREAKER 3.00 - - 292,692.97
38 COLD RECYCLER 900.00 2.20 M 6,556,423.97
39 HOT RECYCLER 400.00 3.00 M 7,437,796.67
40 AGGREGAT (CHIP) SPREADER 115.00 3.50 M 513,441.82
41 ASPHALT DISTRIBUTOR 115.00 4,000.00 Liter 421,938.35
42 SLIP FORM PAVER 105.00 2.50 M 582,266.63
43 CONCRETE PAN MIXER 134.00 600.00 Liter 620,105.46
No. URAIAN HP KAPASITAS BIAYA SEWA ALAT / JAM KET

44 CONCRETE BREAKER 290.00 20.00 m3/jam 969,330.28


45 ASPAHLT TANKER 190.00 4,000.00 liter 649,399.39
46 CEMENT TANKER 190.00 4,000.00 liter 602,799.39
47 CONDRETE MIXER (350) 20.00 350.00 liter 89,189.65
48 VIBRATING RAMMER 4.20 80.00 KG 46,530.10
49 TRUK MIXER (AGITATOR) 220.00 5.00 M3 740,019.88
50 BORE PILE MACHINE DIA 60 125.00 60.00 CM 622,545.81
51 CRANE ON TRACK 75-100 TON 200.00 75.00 Ton 722,841.00
52 BLENDING EQUIPMENT 50.00 30.00 Ton 273,486.73
53 ASPHALT LIQUID MIXER 40.00 20,000.00 Liter 130,238.37
54 BATCHING PLANT 20.00 400.00 liter 208,672.00
55 CHAIN SAW 3.00 - - 33,462.00
56 MESIN CAT MARKA LS 50,000.00
57 CUTTER MACHINE LS 15,000.00
58 MESIN LAS LISTRIK LS 25,000.00
59 PONTON + TUG BOAD LS -
60 PIPE SUPPORT Ls 10,000.00
61 Sewa Tripot/Tackel & handle crane 2 T 2.00 Ton 50,000.00 / hari
62 Peralatan potong pipa T1/Manual (gergaji) / Saw Ls Bh 75,000.00 / hari
63 Peralatan potong pipa T2/Mekanik / Cilinder Saw Ls Bh 120,000.00 / hari
64 CRANE 3 TON 110.00 3.00 Ton 258,314.00
65 Sewa Pompa Submersible 3m3/h 44,000.00 / hari

0
Kontraktor Pelaksana

EKA RETNO SARI


Direktur
Pondasi Foot Plat T1

1 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

A Besi (a) : B Besi (b) : C Besi (c) :

1 Jumlah (a) = 8.00 bh 1 Jumlah (b) = 8.00 bh 1 Jumlah (c) = bh

2 Panjang = 3.5 m 2 Panjang = 3.5 m 2 Panjang = 1m

3 Panjang (a) = 28 m 3 Panjang (b) = 28 m 3 Panjang (c) = 0m

4 Jumlah btg (a) = 2.33 Btg 4 Jumlah btg (b) = 2.33 Btg 4 Jumlah btg (c) = - Btg

5 Berat (a) 44.17 Kg 5 Berat (b) 44.17 Kg 5 Berat (c) - Kg


.

Jumlah (A+B+C) = 88.34 Kg

Ukuran Pondasi :

1 Bh pondasi telapak uk 1,4x1,4x0,35 = 0.588 m3

4 1 m3 / 0.588 m3/m = 1.70 m'

D. Berat baja tul : 151.00 Kg/m3 = (A+B+C)

E. Sengkang :

1 Tinggi foot plat = m

2 Panjang 1 Sengkang = 1.25 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = - bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

F. Bendrat = - Kg/m3

G. Total Berat (D+E+F) = 151.00 Kg/m3


Berdasarkan Gambar Kerja :
K1 40/40
A. Dimensi Penampang :
1b = 0.4 m
2h = 0.4 m

3 Volume / m' = 0.16 m3/m'

4 1 m3 / 0.16 m3/m = 6.25 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 12 bh

6 Panjang Total Tul = 75.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.25 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 118.32 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.45 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 42.00 bh

14 Panjang Tot Sengkang = 60.9 m'

15 Jumlah Btg = 5.08 Btg

16 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

17 Berat Tul / m3 = 37.53 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 156.00 Kg/m3


Berdasarkan Gambar Kerja :
K3 35/35
A. Dimensi Penampang :
1b = 0.35 m
2h = 0.35 m

3 Volume / m' = 0.1225 m3/m'

4 1 m3 / 0.1225 m3/m = 8.16 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 10 bh

6 Panjang Total Tul = 81.63 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.80 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 128.78 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.25 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 55.00 bh

14 Panjang Tot Sengkang = 68.75 m'

15 Jumlah Btg = 5.73 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 27.11 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 156.00 Kg/m3


Berdasarkan Gambar Kerja :
K2 40/45
A. Dimensi Penampang :
1b = 0.4 m
2h = 0.45 m

3 Volume / m' = 0.18 m3/m'

4 1 m3 / 0.18 m3/m = 5.56 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 14 bh

6 Panjang Total Tul = 77.78 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.48 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 122.70 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.55 m'

12 Jarak Sengkang = 0.125 m

13 Jumlah Sengkang = 45.00 bh

14 Panjang Tot Sengkang = 69.75 m'

15 Jumlah Btg = 5.81 Btg

16 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

17 Berat Tul / m3 = 42.98 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 166.00 Kg/m3


Berdasarkan Gambar Kerja :
S 20/40
A. Dimensi Penampang :
1b = 0.2 m
2h = 0.4 m

3 Volume / m' = 0.08 m3/m'

4 1 m3 / 0.08 m3/m = 12.50 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 6 bh

6 Panjang Total Tul = 75.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.25 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 118.32 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.05 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 84.00 bh

14 Panjang Tot Sengkang = 88.2 m'

15 Jumlah Btg = 7.35 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 34.78 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 154.00 Kg/m3


Berdasarkan Gambar Kerja :
B1 25/60
A. Dimensi Penampang :
1b = 0.25 m
2h = 0.6 m

3 Volume / m' = 0.15 m3/m'

4 1 m3 / 0.15 m3/m = 6.67 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 12 bh

6 Panjang Total Tul = 80.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.67 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 126.20 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.55 m'

12 Jarak Sengkang = 0.125 m

13 Jumlah Sengkang = 54.00 bh

14 Panjang Tot Sengkang = 83.7 m'

15 Jumlah Btg = 6.98 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 33.01 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 160.00 Kg/m3


Berdasarkan Gambar Kerja :
B2 25/40
A. Dimensi Penampang :
1b = 0.25 m
2h = 0.4 m

3 Volume / m' = 0.1 m3/m'

4 1 m3 / 0.1 m3/m = 10.00 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 8 bh

6 Panjang Total Tul = 80.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 6.67 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 126.20 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.15 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 67.00 bh

14 Panjang Tot Sengkang = 77.05 m'

15 Jumlah Btg = 6.42 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 30.39 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 157.00 Kg/m3


Berdasarkan Gambar Kerja :
B3 20/35
A. Dimensi Penampang :
1b = 0.2 m
2h = 0.35 m

3 Volume / m' = 0.07 m3/m'

4 1 m3 / 0.07 m3/m = 14.29 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 8 bh

6 Panjang Total Tul = 114.29 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 9.52 Btg

9 Berat Besi 1 Btg Dia. = 13 mm = 12.50 Kg/Btg

10 Berat Tul / m3 = 119.02 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.95 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 96.00 bh

14 Panjang Tot Sengkang = 91.2 m'

15 Jumlah Btg = 7.60 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 35.97 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 155.00 Kg/m3


Berdasarkan Gambar Kerja :
Plat Lantai 12 cm
A. Dimensi Penampang :
1b = 1m
2h = 0.12 m

3 Volume / m' = 0.12 m3/m'

4 1 m3 / 0.12 m3/m = 8.33 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 24.000 bh

6 Panjang Total Tul = 200.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 16.67 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 123.245 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 56.00 bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 124.00 Kg/m3


Berdasarkan Gambar Kerja :
RB 20/35
A. Dimensi Penampang :
1b = 0.2 m
2h = 0.35 m

3 Volume / m' = 0.07 m3/m'

4 1 m3 / 0.07 m3/m = 14.29 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 8 bh

6 Panjang Total Tul = 114.29 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 9.52 Btg

9 Berat Besi 1 Btg Dia. = 13 mm = 12.50 Kg/Btg

10 Berat Tul / m3 = 119.02 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.95 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 96.00 bh

14 Panjang Tot Sengkang = 91.2 m'

15 Jumlah Btg = 7.60 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 35.97 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 155.00 Kg/m3


Berdasarkan Gambar Kerja :
BKA 15/30
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.3 m

3 Volume / m' = 0.045 m3/m'

4 1 m3 / 0.045 m3/m = 22.22 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 6.000 bh

6 Panjang Total Tul = 133.33 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 11.11 Btg

9 Berat Besi 1 Btg Dia. = 12 mm = 10.65 Kg/Btg

10 Berat Tul / m3 = 118.3152 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.75 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 149.00 bh

14 Panjang Tot Sengkang = 111.75 m'

15 Jumlah Btg = 9.31 Btg

16 Berat Besi 1 Btg Dia. = 6 mm = 2.66 Kg/Btg

17 Berat Tul / m3 = 24.79 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 144.00 Kg/m3


Berdasarkan Gambar Kerja :
PK 10 cm
A. Dimensi Penampang :
1b = 1m
2h = 0.1 m

3 Volume / m' = 0.1 m3/m'

4 1 m3 / 0.1 m3/m = 10.00 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 16.000 bh

6 Panjang Total Tul = 160.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 13.33 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 98.596 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 67.00 bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 99.00 Kg/m3


Berdasarkan Gambar Kerja :
KP 15/15
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.15 m

3 Volume / m' = 0.0225 m3/m'

4 1 m3 / 0.0225 m3/m = 44.44 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4 bh

6 Panjang Total Tul = 177.78 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 14.81 Btg

9 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

10 Berat Tul / m3 = 70.112711 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.45 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 297.00 bh

14 Panjang Tot Sengkang = 133.65 m'

15 Jumlah Btg = 11.14 Btg

16 Berat Besi 1 Btg Dia. = 6 mm = 2.66 Kg/Btg

17 Berat Tul / m3 = 29.65 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 100.00 Kg/m3


Berdasarkan Gambar Kerja :
BB 15/30
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.3 m

3 Volume / m' = 0.045 m3/m'

4 1 m3 / 0.045 m3/m = 22.22 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 6 bh

6 Panjang Total Tul = 133.33 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 11.11 Btg

9 Berat Besi 1 Btg Dia. = 12 mm = 10.65 Kg/Btg

10 Berat Tul / m3 = 118.32 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.75 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 149.00 bh

14 Panjang Tot Sengkang = 111.75 m'

15 Jumlah Btg = 9.31 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 44.07 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 163.00 Kg/m3


Berdasarkan Gambar Kerja :
PB 12 cm
A. Dimensi Penampang :
1b = 1m
2h = 0.12 m

3 Volume / m' = 0.12 m3/m'

4 1 m3 / 0.12 m3/m = 8.33 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 24.000 bh

6 Panjang Total Tul = 200.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 16.67 Btg

9 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

10 Berat Tul / m3 = 78.8768 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 56.00 bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 79.00 Kg/m3


Berdasarkan Gambar Kerja : Berdasarkan Gambar Kerja :
PM 12 cm PM 12 cm
A. Dimensi Penampang : A. Dimensi Penampang :
1b = 1m 1b = 1m
2h = 0.12 m 2h = 0.12 m

3 Volume / m' = 0.12 m3/m' 3 Volume / m' = 0.12 m3/m'

4 1 m3 / 0.12 m3/m = 8.33 m' 4 1 m3 / 0.12 m3/m = 8.33 m'

B. Tulangan Pokok : B. Tulangan Pokok :

5 Jumlah Tulangan = 12.000 bh 5 Jumlah Tulangan = 12.000 bh

6 Panjang Total Tul = 100.00 m' 6 Panjang Total Tul = 100.00 m'

7 Panjang 1 Btg = 12 m 7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 8.33 Btg 8 Jumlah Btg Tul = 8.33 Btg

9 Berat Besi 1 Btg Dia. = 12 mm = 10.65 Kg/Btg 9 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

10 Berat Tul / m3 = 88.7364 Kg/m3 10 Berat Tul / m3 = 40 Kg/m3

C. Sengkang : Berat Total Tulangan 129.00 Kg/m3

11 Panjang 1 Sengkang = 0 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 56.00 bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 89.00 Kg/m3


Pondasi Foot Plat T2

1 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg 12 10.65 Kg/Btg

A Tul. Lentur (a) : B Besi (b) : C Besi (c) :

1 Jumlah (a) = 7.00 bh 1 Jumlah (b) = 7.00 bh 1 Jumlah (c) = 0 bh

2 Panjang = 3.1 m 2 Panjang = 3.1 m 2 Panjang = 1.8 m

3 Panjang (a) = 21.7 m 3 Panjang (b) = 21.7 m 3 Panjang (c) = 0m

4 Jumlah btg (a) = 1.81 Btg 4 Jumlah btg (b) = 1.81 Btg 4 Jumlah btg (c) = - Btg

5 Berat (a) 34.23 Kg 5 Berat (b) 19.26 Kg 5 Berat (c) - Kg


.

Jumlah (A+B+C) = 53.49 Kg

Ukuran Pondasi : 0.275

1 Bh pondasi telapak uk 1,2x1,2x0,35 = 0.432 m3

4 1 m3 / 0.432 m3/m = 2.31 m'

D. Berat baja tul : 124.00 Kg/m3 = (A+B+C)

E. Sengkang :

1 Tinggi foot plat = m

2 Panjang 1 Sengkang = 1.25 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = - bh

14 Panjang Tot Sengkang = 0 m'

15 Jumlah Btg = - Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = - Kg/m3

F. Bendrat = - Kg/m3

G. Total Berat (D+E+F) = 124.00 Kg/m3


Berdasarkan Gambar Kerja :
K1A 40/40
A. Dimensi Penampang :
1b = 0.4 m
2h = 0.4 m

3 Volume / m' = 0.16 m3/m'

4 1 m3 / 0.16 m3/m = 6.25 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 8 bh

6 Panjang Total Tul = 50.00 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 4.17 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 78.88 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.45 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 42.00 bh

14 Panjang Tot Sengkang = 60.9 m'

15 Jumlah Btg = 5.08 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 24.02 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 103.00 Kg/m3


Berdasarkan Gambar Kerja :
K3A 35/35
A. Dimensi Penampang :
1b = 0.35 m
2h = 0.35 m

3 Volume / m' = 0.1225 m3/m'

4 1 m3 / 0.1225 m3/m = 8.16 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 8 bh

6 Panjang Total Tul = 65.31 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 5.44 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 103.02 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.25 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 55.00 bh

14 Panjang Tot Sengkang = 68.75 m'

15 Jumlah Btg = 5.73 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 27.11 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 131.00 Kg/m3


Berdasarkan Gambar Kerja :
K2A 40/45
A. Dimensi Penampang :
1b = 0.4 m
2h = 0.45 m

3 Volume / m' = 0.18 m3/m'

4 1 m3 / 0.18 m3/m = 5.56 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 10 bh

6 Panjang Total Tul = 55.56 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 4.63 Btg

9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg

10 Berat Tul / m3 = 87.64 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 1.55 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 38.00 bh

14 Panjang Tot Sengkang = 58.9 m'

15 Jumlah Btg = 4.91 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 23.23 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 111.00 Kg/m3


Berdasarkan Gambar Kerja :
S 15/20
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.2 m

3 Volume / m' = 0.03 m3/m'

4 1 m3 / 0.03 m3/m = 33.33 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4 bh

6 Panjang Total Tul = 133.33 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 11.11 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 82.163333 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.55 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 223.00 bh

14 Panjang Tot Sengkang = 122.65 m'

15 Jumlah Btg = 10.22 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 48.37 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 131.00 Kg/m3


Berdasarkan Gambar Kerja :
Balok Selasar
A. Dimensi Penampang :
1b = 0.12 m
2h = 0.2 m

3 Volume / m' = 0.024 m3/m'

4 1 m3 / 0.024 m3/m = 41.67 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4.000 bh

6 Panjang Total Tul = 166.67 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 13.89 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 102.70417 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.49 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 278.00 bh

14 Panjang Tot Sengkang = 136.22 m'

15 Jumlah Btg = 11.35 Btg

16 Berat Besi 1 Btg Dia. = 6 mm = 2.66 Kg/Btg

17 Berat Tul / m3 = 30.22 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 133.00 Kg/m3


Berdasarkan Gambar Kerja :
RB 15/20
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.2 m

3 Volume / m' = 0.03 m3/m'

4 1 m3 / 0.03 m3/m = 33.33 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4 bh

6 Panjang Total Tul = 133.33 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 11.11 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 82.16 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.55 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 223.00 bh

14 Panjang Tot Sengkang = 122.65 m'

15 Jumlah Btg = 10.22 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 48.37 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 131.00 Kg/m3


Berdasarkan Gambar Kerja :
S 15/20
A. Dimensi Penampang :
1b = 0.15 m
2h = 0.2 m

3 Volume / m' = 0.03 m3/m'

4 1 m3 / 0.03 m3/m = 33.33 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4 bh

6 Panjang Total Tul = 133.33 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 11.11 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 82.163333 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.55 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 223.00 bh

14 Panjang Tot Sengkang = 122.65 m'

15 Jumlah Btg = 10.22 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 48.37 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 131.00 Kg/m3


Berdasarkan Gambar Kerja :
KP 11/11
A. Dimensi Penampang :
1b = 0.11 m
2h = 0.11 m

3 Volume / m' = 0.0121 m3/m'

4 1 m3 / 0.0121 m3/m = 82.64 m'

B. Tulangan Pokok :

5 Jumlah Tulangan = 4 bh

6 Panjang Total Tul = 330.58 m'

7 Panjang 1 Btg = 12 m

8 Jumlah Btg Tul = 27.55 Btg

9 Berat Besi 1 Btg Dia. = 10 mm = 7.39 Kg/Btg

10 Berat Tul / m3 = 203.71074 Kg/m3

C. Sengkang :

11 Panjang 1 Sengkang = 0.29 m'

12 Jarak Sengkang = 0.15 m

13 Jumlah Sengkang = 551.00 bh

14 Panjang Tot Sengkang = 159.79 m'

15 Jumlah Btg = 13.32 Btg

16 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg

17 Berat Tul / m3 = 63.02 Kg/m3

D. Bendrat = - Kg/m3

E. Total Berat (B+C+D) = 267.00 Kg/m3


REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : Pembinaan dan Fasilitas Pengembangan UMKM


PEKERJAAN : Bangunan Sarana Pemasaran Produk UMKM Kegiatan Pembinaan dan Fasilitasi pengembangan UMKM
LOKASI : Menggala
KABUPATEN : Tulang Bawang
T. ANGGARAN : 2020

NO. URAIAN JUMLAH HARGA PEKERJAAN

A PEKERJAAN PERSIAPAN Rp 8,450,000.00

B PEKERJAAN MINIMARKET BMWMART


I PEKERJAAN TANAH Rp 15,031,208.71
II PEKERJAAN PONDASI Rp 12,763,857.11
III PEKERJAAN BETON Rp 74,674,118.66
IV PEKERJAAN PASANGAN Rp 56,441,488.73
V PEKERJAAN PINTU DAN JENDELA Rp 37,759,676.73
VI PEKERJAAN KUNCI DAN PENGGANTUNG Rp 295,339.15
VII PEKERJAAN ATAP Rp 46,806,936.35
VIII PEKERJAAN PLAFOUND Rp 28,057,101.59
IX PEKERJAAN LANTAI Rp 57,390,344.45
X PEKERJAAN ELEKTRIKAL Rp 34,692,944.00
XI PEKERJAAN SANITASI Rp 47,079,768.41
XII PEKERJAAN PENGECATAN Rp 23,597,980.34
XIII PEKERJAAN LAIN - LAIN Rp 19,107,008.06

JUMLAH Rp 462,147,772.30
PPN 10% Rp 46,214,777.23
JUMLAH TOTAL Rp 508,362,549.53
DIBULATKAN Rp 508,362,000.00

Terbilang : Lima Ratus Delapan Juta Tiga Ratus Enam Puluh Dua Ribu Rupiah

Bandar Lampung, 08 September 2020

Kontraktor Pelaksana
CV. KARYA PAKARANNU

EKA RETNO SARI


Direktur
RENCANA ANGGARAN BIAYA

KEGIATAN : Pembinaan dan Fasilitas Pengembangan UMKM


PEKERJAAN : Bangunan Sarana Pemasaran Produk UMKM Kegiatan Pembinaan dan Fasilitasi pengembangan UMKM
LOKASI : Menggala
KABUPATEN : Tulang Bawang
T. ANGGARAN : 2020

HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOL. SAT. SATUAN (Rp)
(Rp)

A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan pembongkaran Ls 1.00 LS 2,500,000.00 2,500,000.00
###
2 Pek. Pengukuran dan Pemasangan Bowplank Ls 1.00 LS 1,500,000.00 1,500,000.00
###
3 Biaya Administrasi dan Dokumentasi 0% s/d 100% Ls 1.00 LS 1,000,000.00 1,000,000.00
4 Pembuatan Papan Nama Proyek Ls 1.00 Unit 200,000.00 200,000.00
5 Listrik kerja Ls 1.00 LS 1,000,000.00 1,000,000.00
6 Biaya Obat Obatan / P3K Ls 1.00 LS 250,000.00 250,000.00
7 Penerapan Sistem Manajemen Keselamatan Kontruksi (SMKK) Ls 1.00 LS 2,000,000.00 2,000,000.00
###
Total A 8,450,000.00
###

B PEKERJAAN MINIMARKET BMWMART


I PEKERJAAN TANAH
1 Galian Tanah Pondasi menerus dan Pondasi Footplat A.2.3.1.1 17.87 M3 74,487.50 1,331,091.63
2 Timbunan tanah kembali A.2.3.1.9 5.96 M3 53,025.00 316,029.00
3 Timbunan tanah untuk peninggian lantai, didatangkan A.2.3.1.16 66.60 M3 105,292.50 7,012,480.50
4 Perataan dan Pemadatan Tanah Timbunan A.2.3.1.10 86.58 M3 53,025.00 4,590,904.50
5 Pasir urug dibawah pondasi dan lantai A.2.3.1.11 10.58 M3 168,308.42 1,780,703.08

Sub Total B.I 15,031,208.71


II PEKERJAAN PONDASI
1 Pekerjaan pasangan batu belah adk. 1 : 4 A.3.2.1.2 16.64 M3 767,058.72 12,763,857.11

Sub Total B.II 12,763,857.11


III PEKERJAAN BETON
1 Pekerjaan pondasi beton bertulang adk. 1:2:3 utk foot plat A.4.1.1.28 1.76 M3 3,585,820.68 6,311,044.39
2 Pek. Sloof 15/30, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 2.94 M3 901,532.85 2,650,506.59
- Pembesian A.4.1.1.17 558.29 Kg 12,349.78 6,894,755.88
- Begisting A.4.1.1.21 43.50 M2 143,218.00 6,229,983.00
3 Pek. Sloof 15/20, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 0.21 M3 901,532.85 189,321.90
- Pembesian A.4.1.1.17 36.64 Kg 12,349.78 452,495.76
- Begisting A.4.1.1.21 2.80 M2 143,218.00 401,010.40
3 Pek. Kolom K1 25/25, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 5.85 M3 901,532.85 5,273,967.19
- Pembesian A.4.1.1.17 1,049.14 Kg 12,349.78 12,956,642.94
- Begisting A.4.1.1.22.a 41.60 M2 207,327.75 8,624,834.40
4 Pek. Kolom Praktis 11/11, Beton Bertulang A.4.1.1.35 36.00 M' 75,558.10 2,720,091.60
5 Pek. Ringbalk 15/30, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 2.94 M3 901,532.85 2,650,506.59
- Pembesian A.4.1.1.17 558.29 Kg 12,349.78 6,894,755.88
- Begisting A.4.1.1.23.a 34.80 M2 210,327.45 7,319,395.26
6 Pek. Ringbalk 15/20, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 0.23 M3 901,532.85 207,352.56
- Pembesian A.4.1.1.17 44.49 Kg 12,349.78 549,441.49
- Begisting A.4.1.1.23.a 3.40 M2 210,327.45 715,113.33
7 Pek. Balok Linitel 10/15, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 0.15 M3 901,532.85 135,229.93
- Pembesian A.4.1.1.17 30.37 Kg 12,349.78 375,062.67
- Begisting A.4.1.1.23.a 3.33 M2 210,327.45 700,390.41
8 Pek. Plat Dag tebal 10 cm, Beton Bertulang
- Pekerjaan Beton K-175 A.4.1.1.5 0.45 M3 901,532.85 405,689.78
- Pembesian A.4.1.1.17 71.84 Kg 12,349.78 887,207.84
- Begisting A.4.1.1.24.a 4.50 M2 250,959.75 1,129,318.88

Sub Total B.III 74,674,118.66


IV PEKERJAAN PASANGAN
1 Pek. Pasangan bata merah adk. 1 : 4 A.4.4.1.9 214.24 M2 100,080.86 21,441,322.71
2 Pek. Plesteran adk. 1 : 4 A.4.4.2.4 382.98 M2 56,786.42 21,748,062.27
3 Pek. aci adk. 1 : 4 A.4.4.2.27 382.98 M2 34,602.60 13,252,103.75

Sub Total B.IV 56,441,488.73


V PEKERJAAN PINTU DAN JENDELA
1 Pasang dinding pastisi Gypsum Rangka Alumunium (Pts) Supl 1. 1.00 Unit 17,827,979.51 17,827,979.51
2 Pasang kusen dan daun pintu Allumunium standar Km/ wc Ls 1.00 Unit 1,235,000.00 1,235,000.00
3 Pasang Rollingdoor besi A.4.2.1.7 28.13 M2 599,536.00 16,864,947.68
4 Pasang roster kaca / glass block Ls 20.00 Buah 25,000.00 500,000.00
5 Pek. Kusen Kayu Kls. II A.4.6.1.2 0.07 M3 5,632,012.50 394,240.88
6 Pek. Daun pintu panel A.4.6.1.5 1.60 M2 543,279.00 869,246.40
7 Pek. Pas. Kaca 8 mm A.4.6.2.18 0.28 M2 243,793.80 68,262.26

Sub Total B.V 37,759,676.73


HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOL. SAT. SATUAN (Rp)
(Rp)
VI PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pek. Pasangan engsel pintu A.4.6.2.5 3.00 Bh 38,006.30 114,018.90
2 Pek. Pasangan kunci 2x slagh A.4.6.2.4 1.00 Bh 181,320.25 181,320.25

Sub Total B.VI 295,339.15


VII PEKERJAAN ATAP
1 Pek. Kuda - kuda baja Ringan SNI Canal C.075 A.4.2.1.22 170.58 M2 157,700.21 26,900,501.01
2 Pek. Pasangan penutup atap Spandex Warna A.4.5.2.45.a 170.58 M2 98,841.13 16,860,319.10
3 Pek. Listplank GRC T= 20 cm A.4.2.1.25 51.35 M' 59,320.67 3,046,116.24

Sub Total B.VII 46,806,936.35


VIII PEKERJAAN PLAFOUND
1 Pek. Pasangan plafond gypsumboard 9mm + rangka hollow A.4.5.1.7.a 192.00 M2 132,727.13 25,483,608.96
2 Pasangan list plafond gypsum A.4.5.1.8 87.00 M' 29,580.38 2,573,492.63

Sub Total B.VIII 28,057,101.59


HARGA JUMLAH
NO. URAIAN PEKERJAAN KODE VOL. SAT. SATUAN (Rp)
(Rp)
IX PEKERJAAN LANTAI
1 Pek. Lantai beton tumbuk T = 5 cm A.4.1.1.4 7.79 M3 765,224.10 5,961,095.70
2 Pekerjaan Lantai keramik 40 x 40 A.4.4.3.35b 195.32 M2 225,874.84 44,117,873.66
3 Pekerjaan Plin keramik 10 x 40 A.4.4.3.39.a 74.10 M2 51,650.75 3,827,320.69
4 Pek. Pasangan lantai keramik 20/20 (km/wc) A.4.4.3.36 3.93 M2 188,258.40 739,855.51
5 Pek. Pasangan diding keramik 20/25 (km/wc) A.4.4.3.54.a 11.49 M3 238,833.67 2,744,198.89

Sub Total B.IX 57,390,344.45


X PEKERJAAN ELEKTRIKAL
1 Pek. Pasangan titik daya api 16.500 Va Supl 2. 1.00 Unit 20,416,645.00 20,416,645.00
2 Pas. Instalasi listrik (Titik api) A.6.1.1 23.00 Titik 343,097.00 7,891,231.00
3 Pasang downlight case 4" A.6.1.6 4.00 Bh 114,332.00 457,328.00
4 Pasang Lampu TL 2x18 watt Inbow Divider A.6.1.7 12.00 Bh 347,642.00 4,171,704.00
5 Pasang saklar tunggal A.6.1.4 1.00 Bh 67,872.00 67,872.00
6 Pasang saklar ganda A.6.1.3 1.00 Bh 77,972.00 77,972.00
7 Pasang saklar triple A.6.1.2 4.00 Bh 88,072.00 352,288.00
8 Pasang stop kontak A.6.1.5 7.00 Bh 108,272.00 757,904.00
9 Pasang Exhausfan Ls 1.00 Bh 500,000.00 500,000.00

Sub Total B.X 34,692,944.00


XI PEKERJAAN SANITASI
1 Pasang kloset jongkok A.5.1.1 2 1.00 Bh 535,431.29 535,431.29
2 Pasang kran air 1/2" A.5.1.1 35 2.00 Bh 70,245.50 140,491.00
3 Pek. Pas. Wastafell A.5.1.1 5 1.00 Bh 1,791,593.54 1,791,593.54
4 Pasang pipa AW 4" untuk jaringan air kotor A.5.1.1 32 12.00 M' 136,140.43 1,633,685.10
5 Pasang pipa AW 3" untuk jaringan air bekas A.5.1.1 31 12.00 M' 91,144.93 1,093,739.10
6 Pasang pipa AW 3/4" untuk jaringan air bersih A.5.1.1 26 24.00 M' 22,646.73 543,521.40
7 Pekerjaan pembuatan septictank Ls 1.00 Unit 5,000,000.00 5,000,000.00
8 Reserfoir air daya tampung 1 m3 Ls 1.00 Unit 1,200,000.00 1,200,000.00
9 Pas. Floor drain Stainles A.5.1.1 36 2.00 Bh 47,672.00 95,344.00
10 Pengeboran Kedalaman 00 Meter dia. 6"
Termasuk Pengadaan bentonit dan Lain-lain
Dari Kedalaman 0 s/d 30 Meter SB.13 30.00 M' 152,045.40 4,561,362.00
Dari Kedalaman 30 s/d 60 Meter SB.14 30.00 M' 153,939.15 4,618,174.50
11 Pengadaan dan pemasangan pipa cassing jenis SB.11 40.00 M' 398,639.43 15,945,577.00
Pipa PVC tipe PV dia 4" + Assesoris
12 Pengadaan dan pemasangan pipa outlet jenis A.5.1.1 28 40.00 M' 43,275.98 1,731,039.00
Pipa PVC tipe PV dia 1,5" + Assesoris
13 Pipa saringan (screen) dia 4" + Assesoris SB.7 4.00 M' 717,624.70 2,870,498.78
14 Pipa Conection ke Bak Air Jenis Pipa PVC A.5.1.1 28 12.00 M' 43,275.98 519,311.70
dia. 1,5" + Assesoris
15 Pengadaan dan Pemasangan Gravel Grounding, Ls 1.00 Unit 2,000,000.00 2,000,000.00
Penyemenan dan Lain-lain
16 Pengadaan dan Pemasangan Pompa Submersible Ls 1.00 Unit 2,800,000.00 2,800,000.00
Kapasitas 1 PK Total Head 60 m Lengkap
dengan Peralatan dan Assesoris
Sub Total B.XI 47,079,768.41
XII PEKERJAAN PENGECATAN
1 Pekerjaan pengecatan dinding A.4.7.1.10 382.98 M2 38,927.93 14,908,616.72
2 Pekerjaan pengecatan plafound A.4.7.1.10 192.00 M2 38,927.93 7,474,161.60
3 Pekerjaan dinding partisi gypsum A.4.7.1.10 13.22 M2 38,927.93 514,627.17
4 Pengecatan kayu A.4.7.1.4 10.27 M2 68,215.66 700,574.85

Sub Total B.XII 23,597,980.34


XIII PEKERJAAN LAIN - LAIN
1 Pek. Pasangan paving blok 8 cm A.4.4.3.65 106.85 M2 159,913.30 17,086,736.11
2 Pek. Pasangan kanstin beton tumbuk A.4.4.3.66 30.00 M' 34,009.07 1,020,271.96
3 Pek. Pasangan SIGER dari Bhn; Plat T= 2mm Ls 1.00 Unit 1,000,000.00 1,000,000.00

Sub Total B.XIII 19,107,008.06


Total B 453,697,772.30
Jumlah D.02 B
Total A + B 462,147,772.30
Jumlah D.02 B
ANALISA HARGA SATUAN PEKERJAAN
(PERMEN PU TAHUN 2013)

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 95,000.00 71,250.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 73,750.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 73,750.00
E Overhead 1% x D 737.50
F Harga Satuan Pekerjaan (D+E) 74,487.50

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian A.2.3.1.9
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 95,000.00 47,500.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 52,500.00
E Overhead 1% x D 525.00
F Harga Satuan Pekerjaan (D+E) 53,025.00

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 95,000.00 47,500.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 52,500.00
E Overhead 1% x D 525.00
F Harga Satuan Pekerjaan (D+E) 53,025.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug A.2.3.1.11


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 95,000.00 28,500.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 29,500.00
B BAHAN
Pasir urug 1.2000 114,285.00 137,142.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 166,642.00
E Overhead 1% x D 1,666.42
F Harga Satuan Pekerjaan (D+E) 168,308.42

A.2.3.1.16. Pengurugan 1 m3 tanah timbunan pilihan A.2.3.1.16


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 95,000.00 23,750.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 26,250.00
B BAHAN
Tanah Timbunan Pilihan m3 1.2000 65,000.00 78,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 104,250.00
E Overhead 1% x D 1,042.50
F Harga Satuan Pekerjaan (D+E) 105,292.50

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP A.3.2.1.2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 95,000.00 142,500.00
Tukang Batu L.02 OH 0.7500 97,500.00 73,125.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 230,625.00
B BAHAN
Batu belah m3 1.2000 233,333.00 279,999.60
Semen Portlan Kg 163.0000 1,080.00 176,040.00
Pasir Pasang m3 0.5200 139,999.00 72,799.48
JUMLAH HARGA BAHAN 528,839.08
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 759,464.08
E Overhead 1% x D 7,594.64
F Harga Satuan Pekerjaan (D+E) 767,058.72

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.4 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100),
slump (3-6) cm, w/c = 0,87 A.4.1.1.4
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 95,000.00 114,000.00
Tukang Batu L.02 OH 0.2000 97,500.00 19,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 141,500.00
B BAHAN
Semen Portlan kg 230.0000 1,080.00 248,400.00
Pasir beton kg 893.0000 178.57 159,464.29
Koral Beton kg 1,027.0000 183.33 188,283.33
Air Liter 200.0000 100.00 20,000.00
JUMLAH HARGA BAHAN 616,147.62
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 757,647.62
E Overhead 1% x D 7,576.48
F Harga Satuan Pekerjaan (D+E) 765,224.10
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 A.4.1.1.5
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 95,000.00 156,750.00
Tukang Batu L.02 OH 0.2750 97,500.00 26,812.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 194,662.50
B BAHAN
Semen Portlan kg 326.0000 1,080.00 352,080.00
Pasir beton kg 760.0000 178.57 135,714.29
Koral Beton kg 1,029.0000 183.33 188,650.00
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 697,944.29
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 892,606.79
E Overhead 1% x D 8,926.07
F Harga Satuan Pekerjaan (D+E) 901,532.85

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 95,000.00 6,650.00
Tukang Besi L.02 OH 0.0700 97,500.00 6,825.00
Kepala Tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 14,575.00
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 10,000.00 105,000.00
Kawat beton Kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 107,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 122,275.00
E Jumlah Per Kg D / 10 12,227.50
F Overhead 10% x E 122.28
G Harga Satuan Pekerjaan (E+F) 12,349.78

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.2600 97,500.00 25,350.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 79,950.00
B BAHAN
Kayu kelas III m3 0.0400 1,650,000.00 66,000.00
Paku 5 – 10 cm Kg 0.3000 17,000.00 5,100.00
Minyak bekisting Liter 0.1000 5,000.00 500.00
JUMLAH HARGA BAHAN 71,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 151,550.00
E Overhead 1% x D 1,515.50
F Harga Satuan Pekerjaan (D+E) 153,065.50

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.2600 97,500.00 25,350.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 79,950.00
B BAHAN
Kayu Papan kelas IV m3 0.0450 1,250,000.00 56,250.00
Paku 5 – 10 cm Kg 0.3000 17,000.00 5,100.00
Minyak bekisting Liter 0.1000 5,000.00 500.00
JUMLAH HARGA BAHAN 61,850.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 141,800.00
E Overhead 1% x D 1,418.00
F Harga Satuan Pekerjaan (D+E) 143,218.00

A.4.1.1.22.a Pemasangan 1 m2 bekisting (2-3 Kali Pakai) untuk kolom A.4.1.1.22.a


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 97,500.00 32,175.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 101,475.00
B BAHAN
Paku 5 – 10 cm Kg 0.4000 17,000.00 6,800.00
Minyak bekisting Liter 0.2000 5,000.00 1,000.00
Balok kayu kelas III m3 0.0090 1,650,000.00 14,850.00
Plywood tebal 9 mm Lbr 0.2100 95,000.00 19,950.00
Dolken kayu φ 8-10cm, 4m Batang 1.2000 18,000.00 21,600.00
Kayu papan kelas III m3 0.0240 1,650,000.00 39,600.00
JUMLAH HARGA BAHAN 103,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 205,275.00
E Overhead 1% x D 2,052.75
F Harga Satuan Pekerjaan (D+E) 207,327.75

A.4.1.1.23.a Pemasangan 1 m2 bekisting (2-3 Kali Pakai) untuk Balok A.4.1.1.23.a


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 97,500.00 32,175.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 101,475.00
B BAHAN
Kayu papan kelas III m3 0.0240 1,650,000.00 39,600.00
Paku 5 – 10 cm Kg 0.4000 17,000.00 6,800.00
Minyak bekisting Liter 0.2000 5,000.00 1,000.00
Balok kayu kelas III m3 0.0108 1,650,000.00 17,820.00
Dolken kayu φ 8-10cm, 4m Batang 1.2000 18,000.00 21,600.00
Plywood tebal 9 mm Lbr 0.2100 95,000.00 19,950.00
JUMLAH HARGA BAHAN 106,770.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 208,245.00
E Overhead 1% x D 2,082.45
F Harga Satuan Pekerjaan (D+E) 210,327.45

A.4.1.1.24.a Pemasangan 1 m2 bekisting( 2-3 kali pakai) untuk lantai A.4.1.1.24.a


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 97,500.00 32,175.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 101,475.00
B BAHAN
Paku 5 – 10 cm Kg 0.4000 17,000.00 6,800.00
Minyak bekisting Liter 0.2000 5,000.00 1,000.00
Balok kayu kelas III m3 0.0090 1,650,000.00 14,850.00
Plywood tebal 9 mm Lbr 0.2100 95,000.00 19,950.00
Dolken kayu φ 8-10cm, 4m Batang 3.6000 18,000.00 64,800.00
Kayu papan kelas III m3 0.0240 1,650,000.00 39,600.00
JUMLAH HARGA BAHAN 147,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 248,475.00
E Overhead 1% x D 2,484.75
F Harga Satuan Pekerjaan (D+E) 250,959.75

A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) A.4.1.1.28


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 95,000.00 503,500.00
Tukang Batu L.02 OH 0.2750 97,500.00 26,812.50
Tukang Kayu L.02 OH 1.3000 97,500.00 126,750.00
Tukang Besi L.02 OH 1.0500 97,500.00 102,375.00
Kepala Tukang L.03 OH 0.2620 100,000.00 26,200.00
Mandor L.04 OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 812,137.50
B BAHAN
Kayu kelas III (papan) m3 0.2000 1,650,000.00 330,000.00
Paku 5 – 10 cm Kg 1.5000 17,000.00 25,500.00
Minyak bekisting Liter 0.4000 5,000.00 2,000.00
Besi beton polos kg 157.5000 10,000.00 1,575,000.00
Kawat beton kg 2.2500 18,000.00 40,500.00
Semen Portland kg 336.0000 1,080.00 362,880.00
Pasir Beton m3 0.5400 250,000.00 135,000.00
Koral Beton m3 0.8100 330,000.00 267,300.00
JUMLAH HARGA BAHAN 2,738,180.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,550,317.50
E Overhead 1% x D 35,503.18
F Harga Satuan Pekerjaan (D+E) 3,585,820.68

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 95,000.00 17,100.00
Tukang Batu L.02 OH 0.0200 97,500.00 1,950.00
Tukang Kayu L.02 OH 0.0200 97,500.00 1,950.00
Tukang Besi L.02 OH 0.0200 97,500.00 1,950.00
Kepala Tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 24,450.00
B BAHAN
Kayu kelas III (papan) m3 0.0020 1,650,000.00 3,300.00
Paku 5 – 10 cm Kg 0.0100 17,000.00 170.00
Minyak bekisting Liter 5,000.00 -
Besi beton polos kg 3.0000 10,000.00 30,000.00
Kawat beton kg 0.4500 18,000.00 8,100.00
Semen Portland kg 4.0000 1,080.00 4,320.00
Pasir Beton m3 0.0060 250,000.00 1,500.00
Koral Beton m3 0.0090 330,000.00 2,970.00
JUMLAH HARGA BAHAN 50,360.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 74,810.00
E Overhead 1% x D 748.10
F Harga Satuan Pekerjaan (D+E) 75,558.10

HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi A.4.2.1.7
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 1.2000 95,000.00 114,000.00
Tukang Las Biasa L.O3 OH 1.2000 97,500.00 117,000.00
Kepala Tukang L.O3 OH 0.1200 100,000.00 12,000.00
Mandor L.O4 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 243,600.00
B BAHAN
Rolling Door Besi m2 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 593,600.00
E Overhead 1% x D 5,936.00
F Harga Satuan Pekerjaan (D+E) 599,536.00

A.4.2.1.11b. Pemasangan 1 m kusen pintu alluminium 4" silver A.4.2.1.11b.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0430 95,000.00 4,085.00
Tukang khusus alumunium L.O3 OH 0.0430 100,000.00 4,300.00
Kepala Tukang L.O3 OH 0.0043 100,000.00 430.00
Mandor L.O4 OH 0.0021 100,000.00 210.00
JUMLAH TENAGA KERJA 9,025.00
B BAHAN
Kusen Allumunium 4" (Silver) m' 1.1000 70,000.00 77,000.00
Skrup fixer buah 2.0000 500.00 1,000.00
Sealant tube 0.0600 20,000.00 1,200.00
JUMLAH HARGA BAHAN 79,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 88,225.00
E Overhead 1% x D 882.25
F Harga Satuan Pekerjaan (D+E) 89,107.25

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0850 95,000.00 8,075.00
Tukang Khusus Allumunium L.O3 OH 0.0850 100,000.00 8,500.00
Kepala Tukang L.O3 OH 0.0090 100,000.00 900.00
Mandor L.O4 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,975.00
B BAHAN
Profil Pintu Allumunium m 4.4000 80,000.00 352,000.00
Profil kaca m 4.5000 2,000.00 9,000.00
Sealant tube 0.2700 20,000.00 5,400.00
JUMLAH HARGA BAHAN 366,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 384,375.00
E Overhead 1% x D 3,843.75
F Harga Satuan Pekerjaan (D+E) 388,218.75

A.4.2.1.22. Pemasangan 1 m2 Atap Pelana rangka atap baja canai dingin profil C75 A.4.2.1.22
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.7340 95,000.00 69,730.00
Tukang Besi L.O2 OH 0.0734 97,500.00 7,156.50
Kepala Tukang L.O3 OH 0.0730 100,000.00 7,300.00
Mandor L.O4 OH 0.0370 100,000.00 3,700.00
JUMLAH TENAGA KERJA 87,886.50
B BAHAN
Profil Baja Canal Dingin C75 (kg) kg 3.0650 20,243.90 62,047.56
JUMLAH HARGA BAHAN 62,047.56
C PERALATAN
Peralatan % 10.0000 62,047.56 6,204.76
JUMLAH HARGA ALAT 6,204.76
D Jumlah (A+B+C) 156,138.82
E Overhead 1% x D 1,561.39
F Harga Satuan Pekerjaan (D+E) 157,700.21

A.4.2.1.25. Pemasangan 1 m' Lisplank GRC 20 cm A.4.2.1.25


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.2500 95,000.00 23,750.00
Tukang Besi L.O2 OH 0.1000 97,500.00 9,750.00
Kepala Tukang L.O3 OH 0.0800 100,000.00 8,000.00
Mandor L.O4 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 44,000.00
B BAHAN
Lisplank GRC 20 cm m' 1.1000 12,666.67 13,933.33
Paku Skrup (50bh/Kg) Kg 0.0500 16,000.00 800.00
JUMLAH HARGA BAHAN 14,733.33
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 58,733.33
E Overhead 1% x D 587.33
F Harga Satuan Pekerjaan (D+E) 59,320.67

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP (Lantai 1) A.4.4.1.9
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 95,000.00 28,500.00
Tukang Batu L.O2 OH 0.1000 97,500.00 9,750.00
Kepala Tukang L.O3 OH 0.0100 100,000.00 1,000.00
Mandor L.O4 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,750.00
B BAHAN
Bata merah m3 70.0000 570.00 39,900.00
Semen Portlan kg 11.5000 1,080.00 12,420.00
Pasir Pasang m3 0.0430 139,999.00 6,019.96
JUMLAH HARGA BAHAN 58,339.96
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 99,089.96
E Overhead 1% x D 990.90
F Harga Satuan Pekerjaan (D+E) 100,080.86

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm A.4.4.2.4
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.3000 95,000.00 28,500.00
Tukang Batu L.O2 OH 0.1500 97,500.00 14,625.00
Kepala Tukang L.O3 OH 0.0150 100,000.00 1,500.00
Mandor L.O4 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 46,125.00
B BAHAN
1. PC Kg 6.2400 1,080.00 6,739.20
2. PP m3 0.0240 139,999.00 3,359.98
JUMLAH HARGA BAHAN 10,099.18
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 56,224.18
E Overhead 1% x D 562.24
F Harga Satuan Pekerjaan (D+E) 56,786.42

A.4.4.2.27. Pemasangan 1 m2 acian. A.4.4.2.27


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.2000 95,000.00 19,000.00
Tukang Batu L.O2 OH 0.1000 97,500.00 9,750.00
Kepala Tukang L.O3 OH 0.0100 100,000.00 1,000.00
Mandor L.O4 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 30,750.00
B BAHAN
Semen PC Kg 3.2500 1,080.00 3,510.00
JUMLAH HARGA BAHAN 3,510.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 34,260.00
E Overhead 1% x D 342.60
F Harga Satuan Pekerjaan (D+E) 34,602.60

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.35b.Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm A.4.4.3.35b
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.7000 95,000.00 66,500.00
Tukang Batu L.O2 OH 0.3500 97,500.00 34,125.00
Kepala Tukang L.O3 OH 0.0350 100,000.00 3,500.00
Mandor L.O4 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 107,625.00
B BAHAN
Keramik 40/40 Warna Bh 6.5630 14,500.00 95,163.50
Semen Portlan Kg 10.0000 1,080.00 10,800.00
Pasir pasang m3 0.0450 139,999.00 6,299.96
Semen warna Kg 0.5000 7,500.00 3,750.00
JUMLAH HARGA BAHAN 116,013.46
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 223,638.46
E Overhead 1% x D 2,236.38
F Harga Satuan Pekerjaan (D+E) 225,874.84

A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.7000 95,000.00 66,500.00
Tukang Batu L.O2 OH 0.3500 97,500.00 34,125.00
Kepala Tukang L.O3 OH 0.0350 100,000.00 3,500.00
Mandor L.O4 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 107,625.00
B BAHAN
Keramik 20/20 polos Bh 26.2500 2,190.00 57,487.50
Semen Portlan Kg 10.4000 1,080.00 11,232.00
Pasir pasang m3 0.0450 139,999.00 6,299.96
Semen warna Kg 0.5000 7,500.00 3,750.00
JUMLAH HARGA BAHAN 78,769.46
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 186,394.46
E Overhead 1% x D 1,863.94
F Harga Satuan Pekerjaan (D+E) 188,258.40

A.4.4.3.39.a.Pemasangan 1 m’ plint keramik ukuran 10cm x 40cm A.4.4.3.39.a


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0900 95,000.00 8,550.00
Tukang Batu L.O2 OH 0.0900 97,500.00 8,775.00
Kepala Tukang L.O3 OH 0.0350 100,000.00 3,500.00
Mandor L.O4 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 24,325.00
B BAHAN
Plint keramik 10 x 40 cm Bh 2.5000 7,500.00 18,750.00
Semen Portlan Kg 1.1400 1,080.00 1,231.20
Pasir pasang m3 0.0030 139,999.00 420.00
Semen warna Kg 0.0250 7,500.00 187.50
JUMLAH HARGA BAHAN 20,588.70
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 44,913.70
E Overhead 10% x D 6,737.05
F Harga Satuan Pekerjaan (D+E) 51,650.75

A.4.4.3.54.a.Pemasangan 1 m2 dinding keramik 20cmx25cm A.4.4.3.54.a


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.9000 95,000.00 85,500.00
Tukang Batu L.O2 OH 0.4500 97,500.00 43,875.00
Kepala Tukang L.O3 OH 0.0450 100,000.00 4,500.00
Mandor L.O4 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 138,375.00
B BAHAN
Keramik 20/25 warna Bh 21.0000 3,380.00 70,980.00
Semen Portlan Kg 9.3000 1,080.00 10,044.00
Pasir Pasang m3 0.0180 139,999.00 2,519.98
Semen warna Kg 1.9400 7,500.00 14,550.00
JUMLAH HARGA BAHAN 98,093.98
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 236,468.98
E Overhead 1% x D 2,364.69
F Harga Satuan Pekerjaan (D+E) 238,833.67

A.4.4.3.65. Pemasangan 1 m2 Paving Block tebal 8 cm A.4.4.3.65


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.5000 95,000.00 47,500.00
Tukang Batu L.O2 OH 0.0500 97,500.00 4,875.00
Kepala Tukang L.O3 OH 0.0500 100,000.00 5,000.00
Mandor L.O4 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 57,505.00
B BAHAN
Pasir Beton M3 0.0700 250,000.00 17,500.00
Paving Block T = 8 cm m2 1.0100 75,000.00 75,750.00
JUMLAH HARGA BAHAN 93,250.00
C PERALATAN
% 10.0000 75,750.00 7,575.00
JUMLAH HARGA ALAT 7,575.00
D Jumlah (A+B+C) 158,330.00
E Overhead 1% x D 1,583.30
F Harga Satuan Pekerjaan (D+E) 159,913.30

A.4.4.3.66. Pemasangan 1 m' Kanstin Beton Tumbuk A.4.4.3.66


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Beton Tumbuk M3 0.0200 765,224.10 15,304.48
Bekisting Pondasi m2 0.1200 153,065.50 18,367.86
JUMLAH HARGA BAHAN 33,672.34
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 33,672.34
E Overhead 1% x D 336.72
F Harga Satuan Pekerjaan (D+E) 34,009.07

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.7.a Pemasangan 1 m2 langit-langit gypsum board 9 mm + Rangka Hollow Galvanis A.4.5.1.7.a
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.4500 95,000.00 42,750.00
Tukang Kayu L.O2 OH 0.4000 97,500.00 39,000.00
Kepala Tukang L.O3 OH 0.0400 100,000.00 4,000.00
Mandor L.O4 OH 0.0230 100,000.00 2,300.00
JUMLAH TENAGA KERJA 88,050.00
B BAHAN
Rangka Hollow 4/4 Btg 0.3330 20,000.00 6,660.00
Rangka Hollow 2/4 Btg 0.3330 13,500.00 4,495.50
Gypsum Lbr 0.3640 53,000.00 19,292.00
Paku Skrup (50 Bh/Kg) Kg 0.1100 16,000.00 1,760.00
Assesories (perkuatan) 100%rangka 11,155.50 11,155.50
JUMLAH HARGA BAHAN 43,363.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 131,413.00
E Overhead 1% x D 1,314.13
F Harga Satuan Pekerjaan (D+E) 132,727.13

A.4.5.1.8. Pemasangan 1 m’ list langit-langit Gypsum A.4.5.1.8


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0500 95,000.00 4,750.00
Tukang Kayu L.O2 OH 0.0500 97,500.00 4,875.00
Kepala Tukang L.O3 OH 0.0050 100,000.00 500.00
Mandor L.O4 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,425.00
B BAHAN
List gypsum m 1.0500 17,500.00 18,375.00
Compound Kg 0.1500 3,250.00 487.50
JUMLAH HARGA BAHAN 18,862.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 29,287.50
E Overhead 1% x D 292.88
F Harga Satuan Pekerjaan (D+E) 29,580.38
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.45.a Pemasangan 1 m2 Atap Spandek Warna A.4.5.2.45.a
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.1500 95,000.00 14,250.00
Tukang Kayu L.O3 OH 0.0750 97,500.00 7,312.50
Kepala Tukang L.11 OH 0.0800 100,000.00 8,000.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 30,162.50
B BAHAN
Atap Spandek Warna M' 1.0500 64,000.00 67,200.00
Paku 1 - 5 cm Kg 0.0200 25,000.00 500.00
JUMLAH HARGA BAHAN 67,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 97,862.50
E Overhead 1% x D 978.63
F Harga Satuan Pekerjaan (D+E) 98,841.13

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II A.4.6.1.2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 6.0000 95,000.00 570,000.00
Tukang Kayu L.O3 OH 18.0000 97,500.00 1,755,000.00
Kepala Tukang L.O3 OH 1.8000 100,000.00 180,000.00
Mandor L.O4 OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,535,000.00
B BAHAN
Balok Kayu Kelas II m3 1.2000 2,500,000.00 3,000,000.00
Paku 5 - 10 cm kg 1.2500 17,000.00 21,250.00
Lem Kayu Kg 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 3,041,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 5,576,250.00
E Overhead 1% x D 55,762.50
F Harga Satuan Pekerjaan (D+E) 5,632,012.50

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II A.4.6.1.5
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 1.0000 95,000.00 95,000.00
Tukang Kayu L.O3 OH 3.0000 97,500.00 292,500.00
Kepala Tukang L.O3 OH 0.3000 100,000.00 30,000.00
Mandor L.O4 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 422,500.00
B BAHAN
Papan kayu Kelas II m3 0.0400 2,860,000.00 114,400.00
Lem Kayu kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 115,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 537,900.00
E Overhead 1% x D 5,379.00
F Harga Satuan Pekerjaan (D+E) 543,279.00

A.4.6.1.24.a. Pemasangan 1 m2 dinding pemisah gypsum rangkap, rangka C 75 galvanis A.4.6.1.24.a.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.4500 95,000.00 42,750.00
Tukang Kayu L.O3 OH 0.3500 97,500.00 34,125.00
Kepala Tukang L.O3 OH 0.0350 100,000.00 3,500.00
Mandor L.O4 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 82,175.00
B BAHAN
Profil Baja Canai Dingin C75 Btg 0.5833 83,000.00 48,413.90
Gypsum Lembar 0.7280 53,000.00 38,584.00
Paku Skrup Bh 6.0000 320.00 1,920.00
Cotton Plaster Kg 0.1400 15,000.00 2,100.00
Compound Kg 0.2600 3,250.00 845.00
JUMLAH HARGA BAHAN 91,862.90
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 174,037.90
E Overhead 1% x D 1,740.38
F Harga Satuan Pekerjaan (D+E) 175,778.28

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa A.4.6.2.2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 95,000.00 950.00
Tukang Kayu L.O3 OH 0.5000 97,500.00 48,750.00
Kepala Tukang L.O3 OH 0.0500 100,000.00 5,000.00
Mandor L.O4 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 55,200.00
B BAHAN
Kunci tanam biasa Lbr 1.0000 150,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 205,200.00
E Overhead 1% x D 2,052.00
F Harga Satuan Pekerjaan (D+E) 207,252.00

A.4.6.2.4. Pemasangan 1 buah kunci silinder A.4.6.2.4


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0050 95,000.00 475.00
Tukang Kayu L.O3 OH 0.5000 97,500.00 48,750.00
Kepala Tukang L.O3 OH 0.0500 100,000.00 5,000.00
Mandor L.O4 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 54,525.00
B BAHAN
Kunci silinder bh 1.0000 125,000.00 125,000.00
JUMLAH HARGA BAHAN 125,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 179,525.00
E Overhead 1% x D 1,795.25
F Harga Satuan Pekerjaan (D+E) 181,320.25

A.4.6.2.5. Pemasangan 1 buah engsel pintu A.4.6.2.5


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0150 95,000.00 1,425.00
Tukang Kayu L.O3 OH 0.1500 97,500.00 14,625.00
Kepala Tukang L.O3 OH 0.0150 100,000.00 1,500.00
Mandor L.O4 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 17,630.00
B BAHAN
Engsel pintu bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 37,630.00
E Overhead 1% x D 376.30
F Harga Satuan Pekerjaan (D+E) 38,006.30

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0170 95,000.00 1,615.00
Tukang Kayu L.O3 OH 0.1700 97,500.00 16,575.00
Kepala Tukang L.O3 OH 0.0170 100,000.00 1,700.00
Mandor L.O4 OH 0.0009 100,000.00 90.00
JUMLAH TENAGA KERJA 19,980.00
B BAHAN
Kaca tebal 8 mm M2 1.1000 200,000.00 220,000.00
Sealant tube 0.0700 20,000.00 1,400.00
JUMLAH HARGA BAHAN 221,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 241,380.00
E Overhead 1% x D 2,413.80
F Harga Satuan Pekerjaan (D+E) 243,793.80

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.4
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0700 95,000.00 6,650.00
Tukang Cat L.O3 OH 0.0090 97,500.00 877.50
Kepala Tukang L.O3 OH 0.0060 100,000.00 600.00
Mandor L.O4 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,427.50
B BAHAN
Cat meni kayu/besi kg 0.2000 35,000.00 7,000.00
Plamir Kayu/besi kg 0.1500 50,000.00 7,500.00
Cat dasar kg 0.1700 61,428.00 10,442.76
Cat penutup kg 0.2600 123,000.00 31,980.00
Kuas cat bh 0.1000 5,000.00 500.00
Pengencer (Thinner) kg 0.0300 23,000.00 690.00
Ampelas M' 0.2000 5,000.00 1,000.00
JUMLAH HARGA BAHAN 59,112.76
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 67,540.26
E Overhead 1% x D 675.40
F Harga Satuan Pekerjaan (D+E) 68,215.66

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0200 95,000.00 1,900.00
Tukang Cat L.O3 OH 0.0630 97,500.00 6,142.50
Kepala Tukang L.O3 OH 0.0063 100,000.00 630.00
Mandor L.O4 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,972.50
B BAHAN
Plamir Tembok kg 0.1000 7,000.00 700.00
Cat dasar kg 0.1000 49,500.00 4,950.00
Cat penutup kg 0.2600 92,000.00 23,920.00
JUMLAH HARGA BAHAN 29,570.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,542.50
E Overhead 1% x D 385.43
F Harga Satuan Pekerjaan (D+E) 38,927.93

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen A.5.1.1 2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 1.0000 95,000.00 95,000.00
Tukang batu L.O3 OH 1.5000 97,500.00 146,250.00
Kepala Tukang L.O3 OH 0.1500 100,000.00 15,000.00
Mandor L.O4 OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 272,250.00
B BAHAN
Kloset jongkok porselin unit 1.0000 250,000.00 250,000.00
Semen Portland kg 6.0000 1,080.00 6,480.00
Pasir Pasang m3 0.0100 139,999.00 1,399.99
JUMLAH HARGA BAHAN 257,879.99
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 530,129.99
E Overhead 1% x D 5,301.30
F Harga Satuan Pekerjaan (D+E) 535,431.29

A.5.1.1 5. Pemasangan 1 buah wastafel A.5.1.1 5


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 1.2000 95,000.00 114,000.00
Tukang batu L.O3 OH 1.4500 97,500.00 141,375.00
Kepala Tukang L.O3 OH 0.1500 100,000.00 15,000.00
Mandor L.O4 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 276,375.00
B BAHAN
Wastafel unit 1.0000 1,330,000.00 1,330,000.00
Semen Portland kg 6.0000 1,080.00 6,480.00
Pasir Pasang m3 0.0100 139,999.00 1,399.99
Perlengkapan % 12.0000 159,600.00 159,600.00
JUMLAH HARGA BAHAN 1,497,479.99
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,773,854.99
E Overhead 1% x D 17,738.55
F Harga Satuan Pekerjaan (D+E) 1,791,593.54

A.5.1.1 36. Pemasangan 1 buah floor drain A.5.1.1 36


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 95,000.00 950.00
Tukang batu L.O3 OH 0.1000 97,500.00 9,750.00
Kepala Tukang L.O3 OH 0.0100 100,000.00 1,000.00
Mandor L.O4 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 12,200.00
B BAHAN
Floor drain unit 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 47,200.00
E Overhead 1% x D 472.00
F Harga Satuan Pekerjaan (D+E) 47,672.00
A.5.1.1 35. Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 35
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0100 95,000.00 950.00
Tukang batu L.O3 OH 0.4000 97,500.00 39,000.00
Kepala Tukang L.O3 OH 0.0400 100,000.00 4,000.00
Mandor L.O4 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 44,450.00
B BAHAN
Kran air besi dia. 1/2" M 1.0000 25,000.00 25,000.00
Sealtape bh 0.0250 4,000.00 100.00
JUMLAH HARGA BAHAN 25,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 69,550.00
E Overhead 1% x D 695.50
F Harga Satuan Pekerjaan (D+E) 70,245.50

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0360 95,000.00 3,420.00
Tukang Pipa L.O3 OH 0.0600 97,500.00 5,850.00
Kepala Tukang L.O3 OH 0.0060 100,000.00 600.00
Mandor L.O4 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 10,070.00
B BAHAN
Pipa PVC 3/4” AW M 1.2000 7,625.00 9,150.00
Perlengkapan % 35.0000 3,202.50 3,202.50
JUMLAH HARGA BAHAN 12,352.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 22,422.50
E Overhead 1% x D 224.23
F Harga Satuan Pekerjaan (D+E) 22,646.73

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” A.5.1.1 28


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0540 95,000.00 5,130.00
Tukang Pipa L.O3 OH 0.0900 97,500.00 8,775.00
Kepala Tukang L.O3 OH 0.0090 100,000.00 900.00
Mandor L.O4 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 15,105.00
B BAHAN
Pipa PVC 11/2” M 1.2000 17,125.00 20,550.00
Perlengkapan % 35.0000 7,192.50 7,192.50
JUMLAH HARGA BAHAN 27,742.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,847.50
E Overhead 1% x D 428.48
F Harga Satuan Pekerjaan (D+E) 43,275.98

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” A.5.1.1 31


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0810 95,000.00 7,695.00
Tukang batu L.O3 OH 0.1350 97,500.00 13,162.50
Kepala Tukang L.O3 OH 0.0135 100,000.00 1,350.00
Mandor L.O4 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 22,607.50
B BAHAN
Pipa PVC 3” M 1.2000 41,750.00 50,100.00
Perlengkapan % 35.0000 17,535.00 17,535.00
JUMLAH HARGA BAHAN 67,635.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 90,242.50
E Overhead 1% x D 902.43
F Harga Satuan Pekerjaan (D+E) 91,144.93

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.O1 OH 0.0810 95,000.00 7,695.00
Tukang batu L.O3 OH 0.1350 97,500.00 13,162.50
Kepala Tukang L.O3 OH 0.0135 100,000.00 1,350.00
Mandor L.O4 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 22,607.50
B BAHAN
Pipa PVC 4” M 1.2000 69,250.00 83,100.00
Perlengkapan % 35.0000 29,085.00 29,085.00
JUMLAH HARGA BAHAN 112,185.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 134,792.50
E Overhead 1% x D 1,347.93
F Harga Satuan Pekerjaan (D+E) 136,140.43

A.6.1 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.6.1.1 Pemasangan 1 titik instalasi listrik A.6.1.1
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Kabel Listrik NYM 3 x 2,5 mm M 15.0000 15,000.00 225,000.00
Accessories (30% dari bahan) 0.3000 225,000.00 67,500.00
JUMLAH HARGA BAHAN 292,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 339,700.00
E Overhead 1% x D 3,397.00
F Harga Satuan Pekerjaan (D+E) 343,097.00

A.6.1.4 Pemasangan 1 buah saklar single A.6.1.4


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Saklar Single Kualitas Baik Bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 67,200.00
E Overhead 1% x D 672.00
F Harga Satuan Pekerjaan (D+E) 67,872.00
A.6.1.3 Pemasangan 1 buah saklar Double A.6.1.3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Saklar Double Kualitas Baik Bh 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 77,200.00
E Overhead 1% x D 772.00
F Harga Satuan Pekerjaan (D+E) 77,972.00

A.6.1.2 Pemasangan 1 buah saklar Triple A.6.1.2


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Saklar Triple Kualitas Baik Bh 1.0000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 87,200.00
E Overhead 1% x D 872.00
F Harga Satuan Pekerjaan (D+E) 88,072.00

A.6.1.5 Pemasangan 1 buah Stop Kontak A.6.1.5


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Stop Kontak Bh 1.0000 60,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 107,200.00
E Overhead 1% x D 1,072.00
F Harga Satuan Pekerjaan (D+E) 108,272.00

A.6.1.6 Pas. 1 buah Lampu Downlight A.6.1.6


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Lampu Downlight + SL Bh 1.0000 60,000.00 60,000.00
Accessories (10% dari bahan) Bh 0.1000 60,000.00 6,000.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 113,200.00
E Overhead 1% x D 1,132.00
F Harga Satuan Pekerjaan (D+E) 114,332.00
A.6.1.7 Pas 1 buah Lampu TL 2x18 watt Inbow divider A.6.1.7
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Instalatur Listrik L.O1 OH 0.3200 100,000.00 32,000.00
Asisten Instalatur Listrik L.O3 OH 0.1600 95,000.00 15,200.00
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Lampu RM TL: 2 x 18 W divider Bh 1.0000 270,000.00 270,000.00
Accessories (10% dari bahan) Bh 0.1000 270,000.00 27,000.00
JUMLAH HARGA BAHAN 297,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 344,200.00
E Overhead 1% x D 3,442.00
F Harga Satuan Pekerjaan (D+E) 347,642.00
ANALISA HARGA SATUAN PEKERJAAN SUMUR BOR

SB.7 1 M' PENGADAAN DAN PEMASANGAN PIPA SCREEN (4")

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Hari 1.4550 95,000.00 138,225.00
Mandor L.04 Hari 1.1820 100,000.00 118,200.00
Tukang Pipa L.02.k Hari 0.0730 97,500.00 7,117.50
Kepala Tukang L.03 Hari 0.1190 100,000.00 11,900.00
JUMLAH TENAGA KERJA 275,442.50
B BAHAN
Pipa Screen Diameter 4" btg 0.1667 2,310,000.00 385,077.00
JUMLAH HARGA BAHAN 385,077.00
C PERALATAN
Alat Bantu untuk Pek. Pengeboran Ls 1.0000 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
D Jumlah (A+B+C) 710,519.50
E Overhead 1% x D 7,105.20
F Harga Satuan Pekerjaan (D+E) 717,624.70

SB.11 1 M' PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 4"

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Hari 1.4550 95,000.00 138,225.00
Mandor L.04 Hari 1.1820 100,000.00 118,200.00
Tukang Pipa L.02.k Hari 0.0730 97,500.00 7,117.50
Kepala Tukang L.03 Hari 0.1190 100,000.00 11,900.00
JUMLAH TENAGA KERJA 275,442.50
B BAHAN
Pipa PVC Diameter 4" btg 0.2500 277,000.00 69,250.00
JUMLAH HARGA BAHAN 69,250.00
C PERALATAN
Alat Bantu untuk Pek. Pengeboran Ls 1.0000 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
D Jumlah (A+B+C) 394,692.50
E Overhead 1% x D 3,946.93
F Harga Satuan Pekerjaan (D+E) 398,639.43

SB.13 1 M' PENGEBORAN DARI 0 S/D 30 M

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Ahli Bor L.010 Hari 0.0030 100,000.00 300.00
Operator Bor L.10.a Hari 0.0230 100,000.00 2,300.00
Pembantu Operator Bor L.10.b Hari 0.0570 95,000.00 5,415.00
Mandor L.04 Hari 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,315.00
B BAHAN
Mata Bor Diameter 6" bh 0.0090 1,500,000.00 13,500.00
Bentonit Kg 0.5000 7,500.00 3,750.00
JUMLAH HARGA BAHAN 17,250.00
C PERALATAN
Sewa Mesin Bor Tanah Jam 0.9090 75,000.00 68,175.00
Sewa Pompa Jam 0.9090 50,000.00 45,450.00
Sewa Generator Jam 0.2270 50,000.00 11,350.00
JUMLAH HARGA ALAT 124,975.00
D Jumlah (A+B+C) 150,540.00
E Overhead 1% x D 1,505.40
F Harga Satuan Pekerjaan (D+E) 152,045.40
SB.14 1 M' PENGEBORAN DARI 30 S/D 60 M

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Ahli Bor L.010 Hari 0.0030 100,000.00 300.00
Operator Bor L.10.a Hari 0.0230 100,000.00 2,300.00
Pembantu Operator Bor L.10.b Hari 0.0570 95,000.00 5,415.00
Mandor L.04 Hari 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,315.00
B BAHAN
Mata Bor Diameter 6" bh 0.0090 1,500,000.00 13,500.00
Bentonit Kg 0.7500 7,500.00 5,625.00
JUMLAH HARGA BAHAN 19,125.00
C PERALATAN
Sewa Mesin Bor Tanah Jam 0.9090 75,000.00 68,175.00
Sewa Pompa Jam 0.9090 50,000.00 45,450.00
Sewa Generator Jam 0.2270 50,000.00 11,350.00
JUMLAH HARGA ALAT 124,975.00
D Jumlah (A+B+C) 152,415.00
E Overhead 1% x D 1,524.15
F Harga Satuan Pekerjaan (D+E) 153,939.15
ANALISA HARGA SATUAN PEKERJAAN SUMUR BOR

Supl 1. Pasang 1 Unit Dinding pArtisi Double Gypsum 9 mm Rangka Aluminium (PTS) Kaca 8 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A BAHAN
Pemasangan 1 m kusen pintu allumunium 4" silver A.4.2.1.11b. m' 67.8100 89,107.25 6,042,362.62
Pasang Siku aluminium 2 x 2 cm (15% Bahan) Ls % 0.1500 6,042,362.62 906,354.39
Pemasangan 1 m2 pintu kaca rangka allumunium A.4.2.1.13 m2 2.2400 388,218.75 869,610.00
Pasang Kaca 8 mm A.4.6.2.18 m2 25.0000 243,793.80 6,094,845.00
Pasang dinding double gypsum 9 mm A.4.6.1.24.a. m2 13.2200 175,778.28 2,323,788.85
Pasang kunci tanam alumunium A.4.6.2.2 Set 2.0000 207,252.00 414,504.00
Pasang engsel pintu dorong dan tarik stainless steel Ls Bh 6.0000 100,000.00 600,000.00
Pasang handle pintu stainless steel 50 cm Ls Bh 4.0000 100,000.00 400,000.00
JUMLAH HARGA BAHAN 17,651,464.86
B PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B) 17,651,464.86
E Overhead 1% x D 176,514.65
F Harga Satuan Pekerjaan (D+E) 17,827,979.51

Supl 2. Pasangan titik daya api 16.500 Va

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A BAHAN
Pasangan titik daya api 16.500 Va (termasuk Kwh meter) Unit 1.0000 16,014,500.00 16,014,500.00
Biaya SLO Unit 1.0000 3,300,000.00 3,300,000.00
Kwh Meter Bh 1.0000 - -
MCB 3x25 Ampere Bh 3.0000 300,000.00 900,000.00
JUMLAH HARGA BAHAN 20,214,500.00
B PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B) 20,214,500.00
E Overhead 1% x D 202,145.00
F Harga Satuan Pekerjaan (D+E) 20,416,645.00
PERINCIAN MATA PEMBAYARAN PENERAPAN KESEHATAN DAN KESELAMATAN KERJA

PEKERJAAN : Peningkatan Jalan Kampung Rawa Ragil Kec. Rawa Pitu


LOKASI : Kabupaten Tulang Bawang
ITEM PEMBAYARAN NO : 1.19

SATUAN HARGA SATUAN


NO URAIAN PEKERJAAN KUANTITA TOTAL HARGA (Rp.) KETERANGAN
UKURAN (Rp.)
S
I II III IV V VI(IV*V) VII
1 Penyiapan RK3K:
Memperhatikan jumlah
Pembuatan dokumen Rencana
a dan jenis pekerjaan yang
Keselamatan Konstruksi Set 1.00 300,000.00 300,000.00 dikerjakan
c Penyiapan formulir
A Sub Total Penyiapan RK3K 300,000.00

2 Sosialisasi, promosi dan pelatihan:

Memperhatikan perkiraan
Pengarahan Keselamatan Konstruksi
b Org 1.00 1,000,000.00 1,000,000.00 jumlah pekerja dan risiko
(Safety Briefing)
k3 pekerjaan

Memperhatikan lokasi
g Banner himbauan pencegahan COVID-19 Lb 1.00 100,000.00 100,000.00 pekerjaan dan waktu
pekerjaan
Memperhatikan lokasi
h Papan Informasi K3 Lb 1.00 100,000.00 100,000.00 pekerjaan dan waktu
pekerjaan
B Sub Total Sosialisasi, promosi dan pelatihan 1,200,000.00

3 Alat Pelindung Kerja dan Alat Pelindung Diri :


b APD:

Memperhatikan Perkiraan
1) Helm Pelindung (Safety Helmet) Bh 7.00 60,000.00 420,000.00 Jumlah Pekerja Tamu dan
Staf

2) Pelindung Pernafaasan (Masker) Bh 7.00 30,000.00 210,000.00 Sesuai Kebutuhan


6) Tameng Muka (Face Shield) Box 7.00 35,000.00 245,000.00 Sesuai Kebutuhan
7) Pelindung Tangan (Safety Gloves) Psg 7.00 25,000.00 175,000.00 Sesuai Kebutuhan
Memperhatikan Perkiraan
Sepatu Keselamatan (Safety Shoes and
8) Psg 7.00 250,000.00 1,750,000.00 Jumlah Pekerja Tamu dan
Toe Cap)
Staf
11) Rompi keselamatan (Safety Vest) Bh 7.00 60,000.00 420,000.00 Sesuai Kebutuhan
C Sub Total Alat Pelindung Kerja dan Alat Pelindung Diri 3,220,000.00

4 Asuransi dan Perizinan

Memperhatikan Perkiraan
a Asuransi dan Kesehatan Ls 1.00 1,000,000.00 1,000,000.00 Jumlah Pekerja Serta Nilai
Pekerja

D Sub Total Asuransi dan Perizinan 1,000,000.00

5 Personel K3 Konstruksi
Memperhatikan
perkiraanjumlah pekerja
a Petugas Keselamatan Konstruksi Org 1.00 1,000,000.00 1,000,000.00 dan risiko
KeselamatanKonstruksi
pekerjaan
E Sub Total Personel K3 Konstruksi 1,750,000.00

6 Fasilitas Sarana,Prasarana, dan Alat Kesehatan


a P3K Ls 1.00 500,000.00 500,000.00 Sesuai Kebutuhan
Pengukur suhu badan nir-sentuh
b Ls 1.00 500,000.00 500,000.00 Sesuai Kebutuhan
(Thermoscan )
F Sub Total Fasilitas Sarana,Prasarana, dan Alat Kesehatan 500,000.00

7 Rambu-Rambu yang Diperlukan


a Rambu Petunjuk Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
b Rambu Larangan Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
c Rambu Peringatan Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
d Rambu Kewajiban Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
e Rambu Informasi Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
f Rambu Pekerjaan Sementara Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
g Jalur Evakuasi Bh 1.00 100,000.00 100,000.00 Sesuai Kebutuhan
G Sub Total Rambu-Rambu yang Diperlukan 600,000.00

8 Kegiatan dan Peralatan Terkait Pengendalian Resiko Keselamatan Kontruksi


Sesuai Kebutuhan
Memperhatikan Jenis
a Alat Pemadam Api Ringan (APAR) Bh 1.00 500,000.00 500,000.00
Pekerjaan dan Resiko
Keselamatan Konstruksi
Pencuci Tangan (tisu, air, sabun cuci
j Ls 1.00 600,000.00 600,000.00 Sesuai Kebutuhan
tangan dan hand sanitizer , dll)
I Sub Total Kegiatan dan Peralatan Terkait Pengendalian Resiko Keselamatan Kontruksi 1,100,000.00

Total Mata Pembayaran Penerapan Kesehatan dan keselamatan Kerja 9,670,000.00


PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
RINCIAN MATA PEMBAYARAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)

SATUAN HARGA SATUAN


NO URAIAN PEKERJAAN KUANTITAS TOTAL HARGA (Rp.) KET
UKURAN (Rp)

I II III IV V VI=(IVxV) VII


1. Penyiapan RKK
1. Pembuatan dokumen Rencana Keselamatan Set 1 150,000.00 150,000.00 Memperhatikan Jumlah
Konstruksi dan Jenis Pekerjaan
yang dikerjakan

A. Sub Total Penyiapan RKK 150,000.00


2. Sosialisasi, promosi dan pelatihan termasuk Sosialisasi Pencegahan Covid-19
1. Petugas K3 Org 1 100,000.00 100,000.00 Melakukan sosialisasi
dan promosi terkait K3
dan berkoordinasi
dengan satgas Covid-
19
B. Sub Total Sosialisasi, promosi dan Pelatihan 100,000.00
3. Alat Pelindung Kerja dan Alat Pelindung Diri
a APK :
1. Pembatas Area Ls 1 100,000.00 100,000.00 Memperhatikan Jumlah
Pekerja dan Resiko K3
b. APD :
1. Topi Pelindung (Safety Helmet) Ls 1 2,000,000.00 2,000,000.00 Memperhatikan Jumlah
Pekerja dan tamu
2. Rompi Keselamatan (Safety Vest) Ls 1 1,500,000.00 1,500,000.00 Memperhatikan Jumlah
Pekerja dan Tamu
C. Sub Total Alat Pelindung Kerja dan Alat Pelindung Diri 3,600,000.00
4. Personel K3 Konstruksi
1. Petugas K3 Org 1 100,000.00 100,000.00 Memperhatikan
perkiraan jumlah
pekerja dan resiko
keselamatan konstruksi

D. Sub Total Personel K3 Konstruksi 100,000.00


5. Fasilitas Sarana, prasarana, dan alat kesehatan :
1. Peralatan P3K (Kotak P3K, Tandu, obat luka Ls 1 200,000.00 200,000.00 Memperhatikan
dan Perban) perkiraan jumlah
pekerja dan resiko
keselamatan konstruksi

2. Vitamin Ls 1 100,000.00 100,000.00 Sesuai Kebutuhan


3. Tempat Pencuci Tangan Ls 1 200,000.00 200,000.00 Sesuai Kebutuhan
dalam upaya
pencegahan Covid-19

4. Sabun Ls 1 100,000.00 100,000.00 Sesuai Kebutuhan


dalam upaya
pencegahan Covid-19
5. Tisu Ls 1 100,000.00 100,000.00 Sesuai Kebutuhan
dalam upaya
pencegahan Covid-19
6. Masker Pekerja dan tamu Ls 1 1,000,000.00 1,000,000.00 Sesuai Kebutuhan
dalam upaya
pencegahan Covid-19
7. Hand Sanitizer Ls 1 250,000.00 250,000.00 Sesuai Kebutuhan
dalam upaya
pencegahan Covid-19
8. Alat Test Suhu Digital BH 1 500,000.00 500,000.00 Sesuai Kebutuhan
dalam upaya
pencegahan Covid-19
E. Sub Total Fasilitas Sarana, prasarana, dan alat kesehatan 2,450,000.00
6. Rambu-rambu yang diperlukan
1. Rambu Petunjuk Ls 1 150,000.00 150,000.00 Sesuai Kebutuhan
2. Rambu Peringatan Ls 1 150,000.00 150,000.00 Sesuai Kebutuhan
F. Sub Total Rambu-rambu yang diperlukan 300,000.00
TOTAL PENERAPAN MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) A+B+C+D+E+F
6,700,000.00
DAFTAR HARGA UPAH
TAHUN 2020

No Uraian Satuan Satuan Harga Upah (Rp) Keterangan

A UPAH TENAGA KERJA


1 Pekerja L.01 Hari 95,000.00
2 Pekerja Penganyam L.01.a Hari 75,000.00
3 Pekerja Pengisi Batu L.01.b Hari 75,000.00
4 Pekerja tak Terlatih L.01.c Hari 75,000.00
5 Tukang L.02 Hari 97,500.00
6 Tukang Batu L.02.a Hari 97,500.00
7 Tukang Kayu L.02.b Hari 97,500.00
8 Tukang Besi L.02.c Hari 97,500.00
9 Tukang Anyam, Las L.02.d Hari 97,500.00
10 Tukang Las Konstruksi L.02.F Hari 100,000.00
11 Tukang Khusus Allumunium L.02.e Hari 100,000.00
12 Tukang Pipa L.02.k Hari 97,500.00
13 Tukang Cat L.02.l Hari 97,500.00
14 Kepala Tukang L.03 Hari 100,000.00
15 Mandor L.04 Hari 100,000.00
16 Instalatur Listrik L.09 Hari 100,000.00
17 Asisten Instalatur Listrik L.9.a Hari 95,000.00
18 Ahli Bor L.10 Hari 100,000.00
19 Operator Bor L.10.a Hari 100,000.00
20 Pembantu Operator L.10.b Hari 95,000.00

Bandar Lampung, 08 September 2020

Kontraktor Pelaksana
CV. KARYA PAKARANNU

EKA RETNO SARI


Direktur
DAFTAR HARGA BAHAN
TAHUN 2020

No Uraian Satuan Harga Bahan (Rp) Keterangan

B HARGA BAHAN :
1 Air Liter 100.00
2 Amplas Kayu M' 5,000.00
3 Bata Merah Buah 570.00
4 Batu Belah Untuk Pondasi M3 233,333.00
5 Bentonit Kg 7,500.00
6 Besi Beton Kg 10,000.00
7 Cat Kayu/Besi Kg 123,000.00 Merk Jotun
8 Cat Meni kayu Kg 35,000.00
9 Cat Dasar/Alkali Kayu Kg 61,428.00 Merk Jotun
10 Cat Dasar/Alkali Tembok Kg 49,500.00 Merk Jotun
11 Cat Tembok (Exterior/Cat Taman) Kg 92,000.00 Merk Jotun
12 Compound Kg 3,250.00
13 Cotton Plaster Kg 15,000.00
14 Dolken kayu Kelas III φ(8-10) 4m Batang 18,000.00
15 Engsel Pintu Buah 20,000.00 Solid
16 Exhaust Fan Buah 500,000.00
17 Floor Drain Buah 35,000.00 Toto
18 Gypsum Lembar 53,000.00
19 Kabel Listrik NYM 3 x 2,5 mm M 15,000.00
20 Kaca Bening 8 mm M2 200,000.00
21 Profil Kaca M 2,000.00
22 Kawat Beton Kg 18,000.00
23 Kayu kelas II balok M3 2,500,000.00
24 Kayu Balok kelas III M3 1,650,000.00
25 Kayu Papan kelas II M3 2,860,000.00
26 Kayu Papan kelas III M3 1,650,000.00
27 Kayu Papan kelas IV M3 1,250,000.00
28 Keramik 20/20 Polos Buah 2,190.00 Masterina
29 Keramik 20/25 Warna Buah 3,380.00 Masterina
30 Keramik 40/40 Warna Buah 14,500.00
31 Keramik Plin 10 x 40 cm Buah 7,500.00 Masterina
32 Kloset Jongkok Porselin Buah 250,000.00 Toto
33 Koral Beton M3 330,000.00
34 Kran air Ø 1/2 " Buah 25,000.00 Toto
35 Kunci pintu 2 slag Kualitas baik Buah 150,000.00
36 Kunci Silinder Buah 125,000.00
37 Kuas cat 2" Buah 5,000.00
38 Kusen Allumunium 4" M 70,000.00 Silver
39 Lampu Downlight + SL Buah 60,000.00
40 Lampu RM TL: 2 x 18 W divider Buah 270,000.00
41 Lem Kayu Kg 20,000.00
42 Lisplank GRC 20 cm M' 12,666.67
43 List Gypsum M' 17,500.00
44 Mata Bor 6" Buah 1,500,000.00
45 Minyak Begisting Liter 5,000.00
46 Minyak Cat / Thinner Liter 23,000.00
47 Paku 1 cm - 2,5 cm Kg 25,000.00
48 Paku 5 – 10 cm Kg 17,000.00
49 Paku Sekrup Kg 16,000.00
50 Pasir beton M3 250,000.00
51 Pasir Pasang M3 139,999.00
52 Pasir Urug M3 114,285.00
53 Paving Block T = 8 Cm m2 75,000.00
No Uraian Satuan Harga Bahan (Rp) Keterangan

54 Pintu alumunium KM/WC Buah 1,235,000.00


55 Pipa PVC Ø 1,5" 4m Batang 68,500.00 Wavin
56 Pipa PVC Ø 3" 4m Batang 167,000.00 Wavin
57 Pipa PVC Ø 3/4" 4m Batang 30,500.00 Wavin
58 Pipa PVC Ø 4" 4m Batang 277,000.00 Wavin
59 Pipa Screen Diameter 4" M 770,000.00
60 Plamir kayu / besi Kg 50,000.00
61 Plamir Tembok Kg 7,000.00
62 Plywood 9 mm Lembar 95,000.00
63 Profil Baja Canai Dingin C75 Btg 83,000.00 1 btg= 4,1 Kg
64 Profil Baja Canai Dingin C75 Kg 20,243.90
65 Rangka Pintu Almunium M' 80,000.00
66 Rangka plafond Hollow Galvanis 4/4 Btg 20,000.00
67 Rangka plafond Hollow Galvanis 2/4 Btg 13,500.00
68 Rolling Door / Folding Gate M2 350,000.00
69 Roster kaca / glass block Buah 25,000.00
70 Saklar Triple Kualitas Baik Buah 40,000.00 Panasonic
71 Saklar Double Kualitas Baik Buah 30,000.00 Panasonic
72 Saklar Single Kualitas Baik Buah 20,000.00 Panasonic
73 Sealant Tube 20,000.00
74 Seal tape Buah 4,000.00
75 Semen PC (50 Kg) Zak 54,000.00 Tiga Roda
76 Semen Warna Kg 7,500.00
77 Skrup Fixer Buah 500.00
78 Spandek Warna M' 64,000.00 Metal
79 Stop Kontak + Instalasi Buah 60,000.00
80 Tanah Timbunan Pilihan M3 65,000.00
81 Tower Air Fiber 1,00 M3 Buah 1,200,000.00
82 Wastafel Buah 1,330,000.00 Toto

Bandar Lampung, 08 September 2020

Kontraktor Pelaksana
CV. KARYA PAKARANNU

EKA RETNO SARI


Direktur
DAFTAR HARGA UPAH DAN BAHAN BANGUNAN
LOKASI KABUPATEN TULANG BAWANG
TRIWULAN II (APRIL - JUNI 2018)
Wilayah I Wilayah II Wilayah III Wilayah IV Wilayah V Wilayah VI

NAMA BAHAN DAN Gedung


NO. SAT Menggala, Banjar Agung, Gedung Aji, Gedung aji Meneng, Dente Rawa Jitu
UPAH TENAGA KERJA Banjar Baru, Meraksa Aji, Baru, Penawar selatan, Rawa
Menggala Timur Banjar Margo Penawar Aji Tama Teladas, Rawa Jitu Timur
Pitu
A. * UPAH TUKANG
1 Mandor / Pengawas Hari Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000
2 Kepala Tukang Hari Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000
3 Kepala Tukang Interior Hari Rp. 250,000 Rp. 250,000 Rp. 250,000 Rp. 250,000 Rp. 250,000 Rp. 250,000
4 Tukang Hari Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000
5 Tukang Konstruksi Hari Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000
6 Tukang Las Hari Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000
7 Tukang Finishing Hari Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
8 Tukang Listrik Hari Rp. 200,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
9 Tukang Kaca Hari Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
10 Tukang Variasi Hari Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
11 Tukang Wallpaper Hari Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
12 Pembantu Tukang Hari Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000
13 Pekerja Hari Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000
14 Pekerja Terampil Hari Rp. 110,000 Rp. 110,000 Rp. 110,000 Rp. 110,000 Rp. 110,000 Rp. 110,000
15 Mekanik Hari Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
16 Pembantu Mekanik Hari Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000
17 Juru Ukur Hari Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000 Rp. 180,000
18 Juru Gambar Hari Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
19 Operator Terlatih Hari Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 160,000
20 Pembantu Operator Hari Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000
21 Labour Hari Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000
22 Sopir Terlatih Hari Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000
23 Pembantu Sopir Hari Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 100,000
24 Penjaga Malam Hari Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 120,000

B. * BAHAN
1 Abu batu m3 Rp. 525,000 Rp. 556,000 Rp. 589,000 Rp. 616,000 Rp. 636,000 Rp. 666,000
2 Ac Wc Ton Rp. 1,865,000 Rp. 1,865,000 Rp. 1,875,000 Rp. 1,885,000 Rp. 1,905,000 Rp. 1,925,000
3 Ac Bc Ton Rp. 1,825,000 Rp. 1,825,000 Rp. 1,835,000 Rp. 1,845,000 Rp. 1,865,000 Rp. 1,885,000
4 Ac Base Ton Rp. 1,765,000 Rp. 1,765,000 Rp. 1,775,000 Rp. 1,785,000 Rp. 1,805,000 Rp. 1,825,000
5 Alumunium Foil 1,2 x 50 Double side m2 Rp. 490,000 Rp. 490,000 Rp. 495,000 Rp. 495,000 Rp. 500,000 Rp. 500,000
6 Alumunium Foil 1,2 x 50 Singgle side m2 Rp. 380,000 Rp. 380,000 Rp. 385,000 Rp. 385,000 Rp. 390,000 Rp. 390,000
7 Alumunium Strip 1" P=6 m btg Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000 Rp. 45,000 Rp. 45,000
8 Alumunium Gelombang t=0,3 L.1020 m' Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000
9 Amplas Besi Lembar Rp. 8,000 Rp. 9,000 Rp. 9,500 Rp. 9,500 Rp. 10,000 Rp. 10,000
10 Amplas Kayu m Rp. 10,000 Rp. 12,000 Rp. 12,500 Rp. 12,500 Rp. 15,000 Rp. 15,000
11 Amplas Roll 40/100 m Rp. 10,000 Rp. 10,000 Rp. 11,000 Rp. 11,000 Rp. 11,500 Rp. 11,500
12 Amplas Roll 60/100 m Rp. 11,000 Rp. 11,000 Rp. 11,500 Rp. 11,500 Rp. 12,000 Rp. 12,000
13 Amplas Roll 80/100 m Rp. 12,000 Rp. 12,000 Rp. 12,500 Rp. 12,500 Rp. 13,000 Rp. 13,000
14 Amplas Roll 100/100 m Rp. 13,000 Rp. 13,000 Rp. 13,500 Rp. 13,500 Rp. 14,000 Rp. 14,000
15 Amplas Roll 120/100 m Rp. 14,000 Rp. 14,000 Rp. 14,500 Rp. 14,500 Rp. 15,000 Rp. 15,000
16 Amplas Roll 150/100 m Rp. 15,000 Rp. 15,000 Rp. 15,500 Rp. 15,500 Rp. 16,000 Rp. 16,000
17 Amplas Roll 180/100 m Rp. 16,000 Rp. 16,000 Rp. 16,500 Rp. 16,500 Rp. 17,000 Rp. 17,000
18 Ampelas gerinda Tempel datar 40/100 Lbr Rp. 4,000 Rp. 4,000 Rp. 4,500 Rp. 4,500 Rp. 5,000 Rp. 5,000
19 Ampelas gerinda Tempel datar 60/100 Lbr Rp. 5,000 Rp. 5,000 Rp. 5,250 Rp. 5,250 Rp. 5,500 Rp. 5,500
20 Ampelas gerinda Tempel datar 80/100 Lbr Rp. 6,000 Rp. 6,000 Rp. 6,400 Rp. 6,400 Rp. 6,750 Rp. 6,750
21 Ampelas gerinda Tempel datar 100/100 Lbr Rp. 7,000 Rp. 7,000 Rp. 7,300 Rp. 7,300 Rp. 7,500 Rp. 7,500
22 Aquaprof Kg Rp. 50,000 Rp. 50,000 Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000
23 Aspal Kg Rp. 11,290 Rp. 11,310 Rp. 11,330 Rp. 11,350 Rp. 11,350 Rp. 11,350
24 Asbes Ukuran 80 x 180 x 4 mm Lembar Rp. 35,000 Rp. 30,000 Rp. 30,000 Rp. 31,000 Rp. 35,000 Rp. 35,000
25 Asbes Ukuran 80 x 240 x 4 mm Lembar Rp. 45,000 Rp. 40,000 Rp. 40,000 Rp. 39,500 Rp. 45,000 Rp. 45,000
26 ATB Ton Rp. 1,950,000 Rp. 1,960,000 Rp. 1,970,000 Rp. 1,970,000 Rp. 2,000,000 Rp. 2,000,000
27 Bak Mandi Fiber 0,3 M3 Buah Rp. 300,000Rp. 300,000 Rp. 300,000 Rp. 335,000 Rp. 350,000 Rp. 350,000
28 Base a m3 Rp. 452,000 Rp. 466,000 Rp. 507,000 Rp. 515,000 Rp. 530,000 Rp. 547,000
29 Base b m3 Rp. 404,000 Rp. 418,000 Rp. 459,000 Rp. 467,000 Rp. 472,000 Rp. 498,000
30 Base c m3 Rp. 392,000 Rp. 406,000 Rp. 427,000 Rp. 435,000 Rp. 440,000 Rp. 481,000
31 Bata Buah Rp. 500 Rp. 500 Rp. 500 Rp. 500 Rp. 550 Rp. 600
32 Batako uk. 10x20x40 cm Buah Rp. 6,800 Rp. 6,900 Rp. 7,100 Rp. 7,100 Rp. 7,400 Rp. 7,400
33 Batako uk. 10x20x20 cm Buah Rp. 6,800 Rp. 6,900 Rp. 7,100 Rp. 7,100 Rp. 7,400 Rp. 7,400
34 Bata Merah Bolong Buah Rp. 750 Rp. 750 Rp. 825 Rp. 825 Rp. 850 Rp. 850
35 Bata Beton Ringan Buah Rp. 12,000 Rp. 12,000 Rp. 12,500 Rp. 12,500 Rp. 13,000 Rp. 13,000
36 Batu Andesit 10x20 M2 Rp. 135,000 Rp. 135,000 Rp. 140,000 Rp. 140,000 Rp. 140,000 Rp. 140,000
37 Batu Andesit 15x30 M2 Rp. 145,000 Rp. 145,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
38 Batu Andesit 20x40 M2 Rp. 155,000 Rp. 155,000 Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 160,000
39 Batu Andesit Susun Sirih 3x30 M2 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 125,000 Rp. 125,000 Rp. 125,000
40 Batu Andesit Susun Sirih 3x40 M2 Rp. 130,000 Rp. 130,000 Rp. 135,000 Rp. 135,000 Rp. 135,000 Rp. 135,000
41 Batu Andesit Susun Sirih 3x50 M2 Rp. 145,000 Rp. 145,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
42 Batu Andesit Susun Sirih 5x30 M2 Rp. 125,000 Rp. 125,000 Rp. 130,000 Rp. 130,000 Rp. 130,000 Rp. 130,000
43 Batu Candi M2 Rp. 115,000 Rp. 115,000 Rp. 117,000 Rp. 117,000 Rp. 120,000 Rp. 120,000
44 Batu Sikat Kecil M2 Rp. 70,000 Rp. 70,000 Rp. 72,000 Rp. 72,000 Rp. 75,000 Rp. 75,000
45 Batu Sikat Besar M2 Rp. 60,000 Rp. 60,000 Rp. 62,000 Rp. 62,000 Rp. 65,000 Rp. 65,000
46 Batu Belah untuk Pondasi m3 Rp. 447,000 Rp. 466,000 Rp. 494,000 Rp. 500,000 Rp. 501,000 Rp. 534,000
47 Batu Belah 10/15 m3 Rp. 455,000 Rp. 476,000 Rp. 506,000 Rp. 513,000 Rp. 512,000 Rp. 551,000
48 Batu Belah 5/7 m3 Rp. 460,000 Rp. 506,000 Rp. 526,000 Rp. 533,000 Rp. 539,000 Rp. 563,000
49 Batu Belah 3/5 m3 Rp. 489,000 Rp. 519,000 Rp. 540,000 Rp. 565,000 Rp. 545,000 Rp. 617,000
50 Batu 2/3 m3 Rp. 515,000 Rp. 543,000 Rp. 548,000 Rp. 565,000 Rp. 574,000 Rp. 650,000
51 Batu 1/2 m3 Rp. 522,000 Rp. 552,000 Rp. 571,000 Rp. 579,000 Rp. 578,000 Rp. 653,000
52 Batu Screening m3 Rp. 452,000 Rp. 478,000 Rp. 503,000 Rp. 510,000 Rp. 509,000 Rp. 535,000
53 Baut kg Rp. 15,000 Rp. 15,000 Rp. 17,500 Rp. 17,500 Rp. 20,000 Rp. 20,000
54 Baut Channal Pcs Rp. 300 Rp. 300 Rp. 300 Rp. 300 Rp. 350 Rp. 350
55 Baut Reng Pcs Rp. 250 Rp. 250 Rp. 250 Rp. 250 Rp. 250 Rp. 250
56 Baut Spandek Pcs Rp. 750 Rp. 850 Rp. 900 Rp. 900 Rp. 950 Rp. 750
57 Belting Sofa M2 Rp. 5,000 Rp. 5,000 Rp. 5,500 Rp. 5,500 Rp. 6,000 Rp. 6,000
58 Besi Beton Kg Rp. 12,200 Rp. 12,200 Rp. 12,400 Rp. 12,400 Rp. 12,800 Rp. 12,800
59 Besi Polos untuk Beton Kg Rp. 12,200 Rp. 12,200 Rp. 12,400 Rp. 12,400 Rp. 12,800 Rp. 12,800
60 Besi Ulir untuk Beton Kg Rp. 12,800 Rp. 11,500 Rp. 11,600 Rp. 11,600 Rp. 12,000 Rp. 12,000
61 Besi WF Kg Rp. 12,800 Rp. 12,800 Rp. 12,900 Rp. 12,900 Rp. 13,000 Rp. 13,000
62 Blokboard 18mm LBR Rp. 400,000 Rp. 400,000 Rp. 420,000 Rp. 420,000 Rp. 425,000 Rp. 430,000
63 Busa Dunlop 10cm M2 Rp. 460,000 Rp. 460,000 Rp. 465,000 Rp. 465,000 Rp. 470,000 Rp. 470,000
64 Busa Dunlop 5cm M2 Rp. 270,000 Rp. 270,000 Rp. 275,000 Rp. 275,000 Rp. 280,000 Rp. 280,000
65 Bubungan Asbes 1 Psg Rp. 27,000 Rp. 27,000 Rp. 28,000 Rp. 29,000 Rp. 30,000 Rp. 30,000
66 Bubungan Genteng Solulosa Bitumen uk. 80 x 100 cm Buah Rp. 80,000 Rp. 80,000 Rp. 82,500 Rp. 82,500 Rp. 85,000 Rp. 85,000
67 Bubungan Genteng Glazur Buah Rp. 35,000 Rp. 35,000 Rp. 36,500 Rp. 35,500 Rp. 36,500 Rp. 36,500
68 Bubungan Genteng Keramik Buah Rp. 13,000 Rp. 13,000 Rp. 14,500 Rp. 14,500 Rp. 16,500 Rp. 16,500
69 Bubungan Genteng Plentong Buah Rp. 3,000 Rp. 3,300 Rp. 4,000 Rp. 4,000 Rp. 5,000 Rp. 5,000
70 Bubungan Genteng Pasir Buah Rp. 25,000 Rp. 25,000 Rp. 26,000 Rp. 26,000 Rp. 27,000 Rp. 27,000
71 Bubungan Genteng Polos Buah Rp. 17,000 Rp. 17,000 Rp. 18,000 Rp. 18,000 Rp. 18,500 Rp. 18,500
72 Bubungan Genteng Beton type Bulat Buah Rp. 12,600 Rp. 12,600 Rp. 12,700 Rp. 12,700 Rp. 12,800 Rp. 12,800
73 Bubungan Genteng Beton type Milenia Buah Rp. 15,600 Rp. 15,600 Rp. 15,700 Rp. 15,700 Rp. 15,800 Rp. 15,800
74 Cat Besi 1 Kg Kg Rp. 53,000 Rp. 53,000 Rp. 58,000 Rp. 60,000 Rp. 65,000 Rp. 65,000
75 Cat dasar (alkali) setara jotun kg Rp. 70,000 Rp. 70,000 Rp. 72,000 Rp. 74,000 Rp. 75,000 Rp. 78,000
76 Cat Kayu (Setara Avian) 1 Kg Kg Rp. 53,000 Rp. 60,000 Rp. 60,000 Rp. 60,000 Rp. 65,000 Rp. 65,000
77 Cat Wood Stain Ltr Rp. 70,000 Rp. 70,000 Rp. 75,000 Rp. 75,000 Rp. 80,000 Rp. 80,000
78 Cat Melamine Sanding Sealer Ltr Rp. 60,000 Rp. 60,000 Rp. 65,000 Rp. 67,500 Rp. 70,000 Rp. 70,000
79 Cat melamik kg Rp. 70,000 Rp. 70,000 Rp. 75,000 Rp. 75,000 Rp. 76,000 Rp. 76,000
80 Cat Minyak 1 Kg kg Rp. 50,000 Rp. 55,000 Rp. 55,000 Rp. 56,000 Rp. 56,000 Rp. 65,000
81 Cat Tembok Dalam Biasa kg Rp. 35,000 Rp. 35,000 Rp. 45,000 Rp. 45,000 Rp. 47,500 Rp. 50,000
82 Cat Tembok Dalam Setara Jotun kg Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000 Rp. 100,000 Rp. 111,000
83 Cat Tembok Luar Biasa kg Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000 Rp. 50,000 Rp. 50,000
84 Cat Tembok Luar Setara Jotun kg Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000 Rp. 100,000 Rp. 111,000
85 Chananal 1 cm Batang Rp. 97,000 Rp. 97,000 Rp. 98,000 Rp. 99,000 Rp. 100,000 Rp. 101,000
86 Chananal 0,75 mm Batang Rp. 90,000 Rp. 90,000 Rp. 91,000 Rp. 92,000 Rp. 93,000 Rp. 94,000
87 Chananal 0,70 mm Batang Rp. 86,000 Rp. 86,000 Rp. 87,000 Rp. 88,000 Rp. 89,000 Rp. 90,000
88 Chananal 0,65 mm Batang Rp. 82,000 Rp. 82,000 Rp. 83,000 Rp. 84,000 Rp. 85,000 Rp. 86,000
89 Closed Duduk Keramik (Natural) + Aksesoris Setara Ot Buah Rp. 2,500,000 Rp. 2,500,000 Rp. 2,500,000 Rp. 2,500,000 Rp. 2,750,000 Rp. 2,750,000
90 Closed Jongkok Porselen Buah Rp. 250,000 Rp. 250,000 Rp. 270,000 Rp. 350,000 Rp. 375,000 Rp. 375,000
91 Dempul Kayu Kg Rp. 35,000 Rp. 35,000 Rp. 36,000 Rp. 38,000 Rp. 45,000 Rp. 45,000
92 Dempul Plitur Kg Rp. 35,000 Rp. 35,000 Rp. 36,000 Rp. 37,000 Rp. 55,000 Rp. 55,000
93 Dinabol Pcs Rp. 1,500 Rp. 1,500 Rp. 1,500 Rp. 1,500 Rp. 1,500 Rp. 1,500
94 Door Closer Buah Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 355,000
95 Door Holder Buah Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 350,000 Rp. 355,000
96 Door Stoper Buah Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 80,000
97 Downlight LED COB 3 Watt Buah Rp. 72,000 Rp. 72,000 Rp. 73,000 Rp. 73,000 Rp. 75,000 Rp. 75,000
98 Downlight LED COB 5 Watt Buah Rp. 92,000 Rp. 92,000 Rp. 93,000 Rp. 93,000 Rp. 95,000 Rp. 95,000
99 Downlight LED COB 9 Watt Buah Rp. 142,000 Rp. 142,000 Rp. 143,000 Rp. 143,000 Rp. 145,000 Rp. 145,000
100 Downlight LED COB 12 Watt Buah Rp. 167,000 Rp. 167,000 Rp. 168,000 Rp. 168,000 Rp. 169,000 Rp. 169,000
101 Downlight LED COB 15 Watt Buah Rp. 197,000 Rp. 197,000 Rp. 198,000 Rp. 198,000 Rp. 200,000 Rp. 200,000
102 Downlight LED Standar 3 Watt Buah Rp. 47,000 Rp. 47,000 Rp. 48,000 Rp. 48,000 Rp. 50,000 Rp. 50,000
103 Downlight LED Standar 5 Watt Buah Rp. 65,000 Rp. 65,000 Rp. 66,000 Rp. 66,000 Rp. 67,500 Rp. 67,500
104 Downlight LED Standar 7 Watt Buah Rp. 79,000 Rp. 79,000 Rp. 80,000 Rp. 80,000 Rp. 82,000 Rp. 82,000
105 Downlight LED Standar 9 Watt Buah Rp. 100,000 Rp. 100,000 Rp. 101,000 Rp. 101,000 Rp. 102,000 Rp. 102,000
106 Dudukan Lampu Buah Rp. 15,000 Rp. 15,000 Rp. 17,000 Rp. 18,000 Rp. 25,000 Rp. 25,000
107 Engsel Jendela Buah Rp. 24,500 Rp. 24,500 Rp. 24,500 Rp. 25,000 Rp. 25,000 Rp. 30,000
108 Engsel Pintu Buah Rp. 35,000 Rp. 40,000 Rp. 40,000 Rp. 40,000 Rp. 45,000 Rp. 45,000
109 Engsel Sendok Softclose FGV Lurus SET Rp. 30,000 Rp. 30,000 Rp. 35,000 Rp. 37,000 Rp. 40,000 Rp. 40,000
110 Engsel Sendok Softclose FGV Bengkok SET Rp. 30,000 Rp. 30,000 Rp. 35,000 Rp. 37,000 Rp. 40,000 Rp. 40,000
111 Floorhadener ( Semen Putih ) Zak Rp. 105,000 Rp. 105,000 Rp. 105,000 Rp. 110,000 Rp. 120,000 Rp. 120,000
112 Finishing High Preasure Laminate PVC LBR Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000 Rp. 200,000
113 Folding gate tebal 0,4 mm m2 Rp. 550,000 Rp. 550,000 Rp. 600,000 Rp. 600,000 Rp. 650,000 Rp. 650,000
114 Folding gate tebal 0,5 mm m2 Rp. 650,000 Rp. 650,000 Rp. 700,000 Rp. 700,000 Rp. 750,000 Rp. 750,000
115 Folding gate tebal 0,8 mm m2 Rp. 850,000 Rp. 850,000 Rp. 900,000 Rp. 900,000 Rp. 950,000 Rp. 950,000
116 Genteng Selulosa Bitumen uk. 40 x 106 cm tebal 0,3 c LBR Rp. 46,000 Rp. 46,000 Rp. 48,000 Rp. 48,000 Rp. 50,000 Rp. 50,000
117 Genteng Selulosa Bitumen uk. 95 x 200 cm tebal 0,3 c LBR Rp. 151,000 Rp. 151,000 Rp. 153,000 Rp. 153,000 Rp. 155,000 Rp. 155,000
118 Genteng Glazur Buah Rp. 11,000 Rp. 11,000 Rp. 12,000 Rp. 12,000 Rp. 12,500 Rp. 12,500
119 Genteng Keramik Buah Rp. 7,000 Rp. 8,500 Rp. 8,500 Rp. 8,500 Rp. 8,500 Rp. 8,500
120 Genteng Metal Pasir Lembar Rp. 40,000 Rp. 46,000 Rp. 50,000 Rp. 50,000 Rp. 55,000 Rp. 55,000
121 Genteng Metal Polos Lembar Rp. 30,000 Rp. 33,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
122 Genteng Plentong Buah Rp. 2,000 Rp. 2,100 Rp. 2,150 Rp. 2,150 Rp. 2,200 Rp. 2,200
123 Genteng Plentong Super Buah Rp. 2,300 Rp. 2,300 Rp. 2,450 Rp. 2,450 Rp. 2,500 Rp. 2,500
124 Genteng Beton Type Milena Buah Rp. 12,800 Rp. 12,900 Rp. 12,900 Rp. 12,900 Rp. 13,100 Rp. 13,100
125 Genteng Beton Type Royal Buah Rp. 9,000 Rp. 9,000 Rp. 9,100 Rp. 9,100 Rp. 9,200 Rp. 9,200
126 Genteng Beton Type Primadona Buah Rp. 9,200 Rp. 9,300 Rp. 9,300 Rp. 9,300 Rp. 9,400 Rp. 9,400
127 Genteng Beton Type Mahkota Buah Rp. 10,700 Rp. 10,800 Rp. 10,800 Rp. 10,800 Rp. 10,900 Rp. 10,900
128 Genteng Beton Type Mutiara Buah Rp. 10,700 Rp. 10,800 Rp. 10,800 Rp. 10,800 Rp. 10,900 Rp. 10,900
129 Genteng Beton Type Fuji Buah Rp. 10,200 Rp. 10,300 Rp. 10,300 Rp. 10,300 Rp. 10,400 Rp. 10,400
130 Grendel Jendela Set Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000
131 Grendel Pintu Biasa Buah Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 20,000 Rp. 20,000
132 Grendel Pintu Tanam Buah Rp. 70,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 75,000
133 Gypsumboard 8 mm Lembar Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 77,000 Rp. 77,000
134 Gypsumboard 9 mm Lembar Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 87,000 Rp. 87,000
135 GRC Board 4 mm Lembar Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 70,000 Rp. 70,000
136 Hak Angin Buah Rp. 15,000 Rp. 16,000 Rp. 16,000 Rp. 20,000 Rp. 20,000 Rp. 20,000
137 Hollow 20 x 40 biasa Btg Rp. 15,000 Rp. 15,000 Rp. 16,000 Rp. 20,000 Rp. 20,000 Rp. 20,000
138 Hollow 40 x 40 biasa Btg Rp. 20,000 Rp. 20,000 Rp. 21,000 Rp. 22,000 Rp. 22,000 Rp. 22,000
139 Hollow 20 x 20 x 0,6 mm x 6 Meter (Alumunium) Btg Rp. 49,000 Rp. 49,000 Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000
140 Hollow 40 x 40 x 2 mm x 6 Meter Stainless Steel Btg Rp. 550,000 Rp. 550,000 Rp. 560,000 Rp. 560,000 Rp. 565,000 Rp. 565,000
141 Hrs Base Ton Rp. 1,980,000 Rp. 1,980,000 Rp. 1,990,000 Rp. 2,000,000 Rp. 2,100,000 Rp. 2,150,000
142 Isolasi Buah Rp. 9,000Rp. 10,000 Rp. 10,000Rp. 10,000Rp. 10,000Rp. 10,000
143 Isi Staples Gun Tacker Lurus 20mm Kotak Rp. 25,000Rp. 25,000 Rp. 30,000Rp. 30,000Rp. 35,000Rp. 35,000
144 Isi Staples Gun Tacker Lurus 25mm Kotak Rp. 25,000Rp. 25,000 Rp. 30,000Rp. 30,000Rp. 35,000Rp. 35,000
145 Isi Staples Gun Tacker Lurus 50mm Kotak Rp. 60,000Rp. 60,000 Rp. 65,000Rp. 65,000Rp. 70,000Rp. 70,000
146 Kabel N2XSY 1 x 50 MM NYY Roll Rp. 410,000Rp. 410,000 Rp. 410,000Rp. 415,000Rp. 425,000Rp. 425,000
147 Kabel NYM 3 ( 2 x 2,5 mm2 ) Roll Rp. 435,000Rp. 435,000 Rp. 435,000Rp. 435,000Rp. 440,000Rp. 450,000
148 Kabel NYM 2 ( 3 x 2,5 mm2 ) m' Rp. 11,000Rp. 11,000 Rp. 11,000Rp. 11,400Rp. 11,500Rp. 12,000
149 Kabel NYM 2 x 1,5 mm2 Roll Rp. 305,000Rp. 305,000 Rp. 310,500Rp. 310,500Rp. 313,500Rp. 340,000
150 Kabel Ukuran Besar m' Rp. 7,000Rp. 7,000 Rp. 7,000Rp. 7,000Rp. 10,000Rp. 10,000
151 Kabel Ukuran Kecil m' Rp. 3,000Rp. 4,000 Rp. 5,000Rp. 5,000Rp. 6,000Rp. 6,500
152 Kabel Ukuran Sedang m' Rp. 5,500Rp. 6,000 Rp. 6,000Rp. 6,000Rp. 6,500Rp. 7,000
153 Kaca Biru Laut Tebal 5 mm m2 Rp. 132,000 Rp. 132,000 Rp. 137,500 Rp. 137,500 Rp. 138,000 Rp. 138,000
154 Kaca Cermin 5 mm m2 Rp. 175,000 Rp. 175,000 Rp. 176,000 Rp. 177,500 Rp. 178,000 Rp. 178,000
155 Kaca Cermin 8 mm 8 mm m2 Rp. 208,000 Rp. 208,000 Rp. 210,000 Rp. 210,000 Rp. 215,000 Rp. 215,000
156 Kaca Es Tebal 3 mm m2 Rp. 233,000 Rp. 233,000 Rp. 233,000 Rp. 235,000 Rp. 240,000 Rp.
240,000
157 Kaca Patri m2 Rp. 1,650,000 Rp. 1,650,000 Rp. 1,650,000 Rp. 1,652,000 Rp. 1,655,000 Rp. 1,655,000
158 Kaca Polos Tebal 3 mm m2 Rp. 120,000 Rp. 120,000 Rp. 135,000 Rp. 135,000 Rp. 135,000 Rp. 135,000
159 Kaca Polos Tebal 5 mm m2 Rp. 160,000 Rp. 160,000 Rp. 170,000 Rp. 170,000 Rp. 175,000 Rp. 175,000
160 Kaca Polos Tebal 8 mm m2 Rp. 185,000 Rp. 185,000 Rp. 195,000 Rp. 195,000 Rp. 210,000 Rp. 215,000
161 Kanstin (15 x 30 x 50 cm) buah Rp. 64,000 Rp. 64,800 Rp. 65,500 Rp. 65,500 Rp. 67,000 Rp. 67,000
162 Kanstin (17,5 x 20 x 40 cm) buah Rp. 40,600 Rp. 41,100 Rp. 41,500 Rp. 41,500 Rp. 42,500 Rp. 42,500
163 Kanstin (21 x 30 x 30 cm) buah Rp. 42,600 Rp. 43,200 Rp. 43,900 Rp. 43,900 Rp. 45,100 Rp. 45,100
164 Kanstin (10 x 20 x 40 cm) buah Rp. 33,200 Rp. 33,500 Rp. 33,700 Rp. 33,700 Rp. 34,300 Rp. 34,300
165 Kapur Kg Rp. 7,000 Rp. 7,000 Rp. 7,000 Rp. 7,000 Rp. 7,500 Rp. 10,000
166 Kawat Bronjong Kg Rp. 20,000 Rp. 20,000 Rp. 22,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
167 Kawat duri untuk pagar 50 m Roll Rp. 135,000 Rp. 135,000 Rp. 150,000 Rp. 150,000 Rp. 175,000 Rp. 175,000
168 Kawat ikat untuk beton Kg Rp. 15,000 Rp. 15,000 Rp. 17,500 Rp. 17,500 Rp. 20,000 Rp. 20,000
169 Kawat las listrik Kotak Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
170 Kawat Nyamuk m' Rp. 22,000 Rp. 22,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
171 Kawat Saringan Pasir m' Rp. 18,000 Rp. 20,000 Rp. 20,000 Rp. 20,000 Rp. 25,000 Rp. 25,000
172 Kayu Racuk m3 Rp. 360,000 Rp. 360,000 Rp. 360,000 Rp. 360,000 Rp. 360,000 Rp. 360,000
173 Kayu Balok Kelas I m3 Rp. 8,500,000 Rp. 8,500,000 Rp. 8,500,000 Rp. 8,500,000 Rp. 8,500,000 Rp. 9,000,000
174 Kayu Balok Kelas II m3 Rp. 2,600,000 Rp. 2,600,000 Rp. 2,600,000 Rp. 2,700,000 Rp. 2,850,000 Rp. 2,850,000
175 Kayu Balok Kelas III m3 Rp. 2,000,000 Rp. 2,000,000 Rp. 2,000,000 Rp. 2,000,000 Rp. 2,300,000 Rp. 2,300,000
176 Kayu Balok Kelas IV m3 Rp. 1,900,000 Rp. 1,500,000 Rp. 1,500,000 Rp. 1,500,000 Rp. 1,850,000 Rp. 1,500,000
177 Kayu Dolken/ Perancah Batang Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000
178 Kayu Gelam Batang Rp. 11,000 Rp. 11,000 Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000
179 Kayu Papan Kelas I m3 Rp. 8,925,000 Rp. 8,925,000 Rp. 8,925,000 Rp. 8,925,000 Rp. 8,925,000 Rp. 9,450,000
180 Kayu Papan Kelas II m3 Rp. 3,200,000 Rp. 3,200,000 Rp. 3,300,000 Rp. 3,300,000 Rp. 3,350,000 Rp. 3,600,000
181 Kayu Papan Kelas III m3 Rp. 2,400,000 Rp. 2,400,000 Rp. 2,400,000 Rp. 2,000,000 Rp. 2,400,000 Rp. 2,400,000
182 Kayu Papan Kelas IV untuk ( Begisting ) m3 Rp. 1,900,000Rp. 1,600,000 Rp. 1,600,000 Rp. 1,800,000 Rp. 1,700,000 Rp. 1,600,000
183 Karpet M2 Rp. 900,000Rp. 900,000 Rp. 900,000 Rp. 900,000 Rp. 900,000 Rp. 900,000
184 Kaca Partisi Tempered 10 mm M2 Rp. 600,000Rp. 600,000 Rp. 650,000 Rp. 650,000 Rp. 670,000 Rp. 670,000
185 Kaca Partisi Blasted 10 mm M2 Rp. 650,000Rp. 650,000 Rp. 670,000 Rp. 670,000 Rp. 680,000 Rp. 680,000
186 Keramik bermotif warna 20 x 20 cm m2 Rp. 65,000 Rp. 70,000 Rp. 70,000 Rp. 70,000 Rp. 80,000 Rp. 80,000
187 Keramik bermotif warna 20 x 25 cm m2 Rp. 68,000 Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 80,000 Rp. 80,000
188 Keramik bermotif warna 30 x 30 cm m2 Rp. 72,000 Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 85,000
189 Keramik bermotif warna 40 x 40 cm m2 Rp. 85,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000 Rp. 90,000
190 Keramik bermotif warna 20 x 50 cm m2 Rp. 95,000 Rp. 95,000 Rp. 100,000 Rp. 100,000 Rp. 105,000 Rp. 105,000
191 Keramik bermotif warna 25 x 40 cm m2 Rp. 108,000 Rp. 108,000 Rp. 110,000 Rp. 110,000 Rp. 115,000 Rp. 115,000
192 Keramik bermotif warna 30 x 60 cm m2 Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 125,000
193 Keramik bermotif warna 60 x 60 cm m2 Rp. 128,000 Rp. 128,000 Rp. 130,000 Rp. 130,000 Rp. 135,000 Rp. 135,000
194 Keramik Mozaik buah Rp. 70,000 Rp. 70,000 Rp. 72,000 Rp. 75,000 Rp. 75,000 Rp. 75,000
195 Keramik polos 20 x 20 cm m2 Rp. 55,000 Rp. 65,000 Rp. 65,000 Rp. 70,000 Rp. 70,000 Rp. 70,000
196 Keramik polos 20 x 25 cm m2 Rp. 57,000 Rp. 70,000 Rp. 70,000 Rp. 75,000 Rp. 80,000 Rp. 80,000
197 Keramik polos 30 x 30 cm m2 Rp. 60,000 Rp. 75,000 Rp. 75,000 Rp. 80,000 Rp. 80,000 Rp. 80,000
198 Keramik polos 40 x 40 cm m2 Rp. 80,000 Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 85,000
199 Knok Metal m' Rp. 36,000 Rp. 36,000 Rp. 40,000 Rp. 40,000 Rp. 45,000 Rp. 45,000
200 Kran air dari kuningan Uk. 1/2 in Buah Rp. 55,000 Rp. 55,000 Rp. 57,000 Rp. 65,000 Rp. 60,000 Rp. 65,000
201 Kran air dari paralon biasa Uk. 1/2 in Buah Rp. 15,000 Rp. 15,000 Rp. 18,000 Rp. 20,000 Rp. 25,000 Rp. 25,000
202 Kuku Macan m1 Rp. 5,000 Rp. 5,000 Rp. 6,000 Rp. 6,000 Rp. 10,000 Rp. 10,000
203 Kunci Pintu 1 x Putar Buah Rp. 170,000 Rp. 170,000 Rp. 170,000 Rp. 175,000 Rp. 175,000 Rp. 200,000
204 Kunci Pintu 1 x Putar Biasa Buah Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 165,000
205 Kunci Pintu 2 x Putar Buah Rp. 250,000 Rp. 250,000 Rp. 250,000 Rp. 250,000 Rp. 260,000 Rp. 280,000
206 Kunci Pintu 2 x Putar Biasa Buah Rp. 170,000 Rp. 170,000 Rp. 185,000 Rp. 185,000 Rp. 190,000 Rp. 190,000
207 Kunci Body Felor Buah Rp. 210,000 Rp. 210,000 Rp. 230,000 Rp. 230,000 Rp. 250,000 Rp. 250,000
208 Kusen Alumunium 3" (Silver) m' Rp. 70,000 Rp. 70,000 Rp. 75,000 Rp. 75,000 Rp. 80,000 Rp. 80,000
209 Kusen Alumunium 3" (Coklat/Hitam) m' Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000 Rp. 95,000 Rp. 95,000
210 Kusen Alumunium 4" (Silver) m' Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000
211 Kusen Alumunium 4" (Coklat/Hitam) m' Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 125,000
212 Kwas 1,5" Buah Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000
213 Kwas 2" Buah Rp. 7,000 Rp. 7,000 Rp. 7,000 Rp. 7,000 Rp. 7,000 Rp. 7,000
214 Kwas 4" Buah Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000
215 Lampu LED 3 Watt Buah Rp. 25,000 Rp. 25,000 Rp. 26,000 Rp. 26,000 Rp. 27,000 Rp. 27,000
216 Lampu LED 5 Watt Buah Rp. 30,000 Rp. 30,000 Rp. 31,000 Rp. 31,000 Rp. 33,000 Rp. 33,000
217 Lampu LED 7 Watt Buah Rp. 60,000 Rp. 60,000 Rp. 61,000 Rp. 61,000 Rp. 63,000 Rp. 63,000
218 Lampu LED 9 Watt Buah Rp. 62,000 Rp. 62,000 Rp. 63,000 Rp. 63,000 Rp. 65,000 Rp. 65,000
219 Lampu LED 12 Watt Buah Rp. 93,000 Rp. 93,000 Rp. 94,000 Rp. 94,000 Rp. 95,000 Rp. 95,000
220 Lampu LED 14 Watt Buah Rp. 105,000 Rp. 105,000 Rp. 106,000 Rp. 106,000 Rp. 108,000 Rp. 108,000
221 Lampu Lilin SL 10/18 Watt Buah Rp. 30,000 Rp. 30,000 Rp. 32,000 Rp. 35,000 Rp. 37,000 Rp. 37,000
222 Lampu Lilin SL 20/23 Watt Buah Rp. 35,000 Rp. 35,000 Rp. 38,000 Rp. 40,000 Rp. 45,000 Rp. 45,000
223 Lampu Neon type Lilin 11 Watt Buah Rp. 30,000 Rp. 30,000 Rp. 32,000 Rp. 33,000 Rp. 35,000 Rp. 35,000
224 Lampu Neon type Lilin 18 Watt Buah Rp. 35,000 Rp. 35,000 Rp. 37,000 Rp. 38,000 Rp. 40,000 Rp. 40,000
225 Lampu TL 1 x 20 watt Lengkap Buah Rp. 50,000 Rp. 50,000 Rp. 51,000 Rp. 51,000 Rp. 52,000 Rp. 52,000
226 Lampu TL 2 x 20 watt Lengkap Buah Rp. 85,000 Rp. 85,000 Rp. 86,000 Rp. 86,000 Rp. 87,000 Rp. 87,000
227 Lem Paralon Buah Rp. 8,000 Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000 Rp. 10,000
228 Lem Kayu Putih Fox Kg Rp. 30,000 Rp. 30,000 Rp. 32,500 Rp. 32,500 Rp. 35,000 Rp. 35,000
229 Lem HPL Kuning Fox Kg Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
230 Lem Silicone Putih Bening Tabung Rp. 40,000 Rp. 40,000 Rp. 45,000 Rp. 45,000 Rp. 50,000 Rp. 50,000
231 Listplank GRC 30cm Lbr Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 70,000 Rp. 70,000 Rp. 80,000
232 Listplank PVC m' Rp. 14,000 Rp. 14,000 Rp. 14,500 Rp. 14,500 Rp. 15,000 Rp. 15,000
233 Listplank Polos Lbr Rp. 41,000 Rp. 41,000 Rp. 41,500 Rp. 41,500 Rp. 42,000 Rp. 42,000
234 Listplank Jati Lbr Rp. 46,000 Rp. 46,000 Rp. 46,500 Rp. 46,500 Rp. 47,000 Rp. 47,000
235 Listplank Zincalume 20 cm t = 0,3 m' Rp. 32,000 Rp. 32,000 Rp. 33,000 Rp. 33,000 Rp. 35,000 Rp. 35,000
236 List Gypsum 5 cm m' Rp. 17,000 Rp. 17,000 Rp. 17,000 Rp. 17,000 Rp. 20,000 Rp. 20,000
237 List Gypsum 10 cm m' Rp. 22,300 Rp. 23,000 Rp. 23,000 Rp. 23,100 Rp. 23,800 Rp. 23,800
238 List Gypsum 15 cm m' Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,300 Rp. 25,600 Rp. 25,600
239 List Gypsum 20 cm m' Rp. 35,000 Rp. 35,000 Rp. 37,000 Rp. 37,000 Rp. 40,000 Rp. 40,000
240 List Profil Kayu 3cm m' Rp. 3,750 Rp. 3,750 Rp. 3,750 Rp. 3,750 Rp. 5,000 Rp. 5,500
241 List Profil Kayu 4cm m' Rp. 4,250 Rp. 4,250 Rp. 4,250 Rp. 5,000 Rp. 6,250 Rp. 6,750
242 List Profil Kayu 5cm m' Rp. 4,500 Rp. 4,500 Rp. 5,000 Rp. 7,000 Rp. 7,500 Rp. 7,500
243 Long Elbow 45⁰ (Bend 45⁰) dia 2" Buah Rp. 127,000 Rp. 128,000 Rp. 130,000 Rp. 130,000 Rp. 135,000 Rp. 135,000
244 Long Elbow 45⁰ (Bend 45⁰) dia 3" Buah Rp. 215,000 Rp. 215,000 Rp. 220,000 Rp. 220,000 Rp. 225,000 Rp. 225,000
245 Long Elbow 45⁰ (Bend 45⁰) dia 4" Buah Rp. 215,000 Rp. 215,000 Rp. 220,000 Rp. 220,000 Rp. 225,000 Rp. 225,000
246 Long Elbow 45⁰ (Bend 45⁰) dia 6" Buah Rp. 308,000 Rp. 310,000 Rp. 312,000 Rp. 315,000 Rp. 320,000 Rp. 320,000
247 Long Elbow 45⁰ (Bend 45⁰) dia 8" Buah Rp. 725,000 Rp. 725,000 Rp. 732,000 Rp. 732,000 Rp. 736,000 Rp. 736,000
248 Long Elbow 45⁰ (Bend 45⁰) dia 10" Buah Rp. 1,022,000 Rp. 1,022,000 Rp. 1,032,000 Rp. 1,032,000 Rp. 1,037,000 Rp. 1,037,000
249 Long Elbow 90⁰ (Bend 90⁰) dia 6" Buah Rp. 764,000 Rp. 764,000 Rp. 772,000 Rp. 772,000 Rp. 775,000 Rp. 775,000
250 Long Elbow 90⁰ (Bend 90⁰) dia 8" Buah Rp. 932,000 Rp. 932,000 Rp. 941,000 Rp. 941,000 Rp. 946,000 Rp. 946,000
251 Long Elbow 90⁰ (Bend 90⁰) dia 10" Buah Rp. 1,483,000 Rp. 1,483,000 Rp. 1,498,000 Rp. 1,498,000 Rp. 1,505,000 Rp. 1,505,000
252 Mata Polishing Disk Rotary BUAH Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
253 Mica Tripleks Dove LBR Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 125,000
254 Mica Tripleks Glossy LBR Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 125,000 Rp. 125,000
255 MCB 4 A Legran Buah Rp. 27,000 Rp. 50,000 Rp. 55,000 Rp. 57,000 Rp. 60,000 Rp. 60,000
256 MCB 6 A Legran Buah Rp. 27,000 Rp. 50,000 Rp. 55,000 Rp. 57,000 Rp. 60,000 Rp. 60,000
257 Meni Besi kg Rp. 33,000 Rp. 35,000 Rp. 35,000 Rp. 35,000 Rp. 35,000 Rp. 35,000
258 Meni Kayu kg Rp. 27,000 Rp. 35,000 Rp. 35,000 Rp. 35,000 Rp. 35,000 Rp. 35,000
259 Minyak Aspal Liter Rp. 8,100 Rp. 8,100 Rp. 8,100 Rp. 8,100 Rp. 8,600 Rp. 8,600
260 Minyak Cat / Tinner Liter Rp. 22,000 Rp. 23,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
261 Minyak Flux Oil untuk Emulsi Liter Rp. 4,000 Rp. 4,000 Rp. 4,500 Rp. 4,500 Rp. 4,500 Rp. 4,500
262 Minyak Oli Bekas untuk Ter Liter Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000
263 Minyak Oli Gardan Liter Rp. 27,000 Rp. 27,000 Rp. 29,000 Rp. 29,000 Rp. 29,500 Rp. 29,500
264 Minyak Oli Gemuk Liter Rp. 29,000 Rp. 29,000 Rp. 29,000 Rp. 29,000 Rp. 29,000 Rp. 29,000
265 Minyak Pelumas Standar Pertamina Liter Rp. 36,500 Rp. 36,500 Rp. 36,500 Rp. 36,500 Rp. 36,500 Rp. 36,500
266 Minyak Premium Liter Rp. 8,000 Rp. 8,000 Rp. 8,000 Rp. 8,000 Rp. 8,000 Rp. 8,000
267 Minyak Solar u/ industri Liter Rp. 12,728 Rp. 12,728 Rp. 12,728 Rp. 12,728 Rp. 12,728 Rp. 12,728
268 Minyak Tanah Liter Rp. 14,000Rp. 14,000 Rp. 14,500 Rp. 14,500 Rp. 14,500 Rp. 14,550
269 Oker Putih/kuning Kg Rp. 8,000Rp. 8,000 Rp. 8,000 Rp. 10,000 Rp. 10,000 Rp. 10,000
270 Oker Warna Kg Rp. 10,000Rp. 10,000 Rp. 12,000 Rp. 12,000 Rp. 13,000 Rp. 13,000
271 Paku Biasa Kg Rp. 12,000Rp. 13,000 Rp. 15,000 Rp. 15,000 Rp. 15,000 Rp. 15,000
272 Paku Tembok 1,5 in Kotak Rp. 25,000Rp. 25,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
273 Paku Tembok 2 in Kotak Rp. 25,000Rp. 25,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
274 Paku Tembok 3 in Kotak Rp. 25,000Rp. 25,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
275 Paku Tembok 4 in Kotak Rp. 25,000Rp. 25,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
276 Paku Triplek Kg Rp. 22,000Rp. 22,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
277 Paku Seng / Asbes Kg Rp. 22,000Rp. 22,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
278 Paku Skrup 1 cm - 2.5 cm kotak Rp. 20,000Rp. 20,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
279 Paku Skrup 3.5 " Kotak Rp. 20,000Rp. 20,000 Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 25,000
280 Paku Skrup Gypsumboard buah Rp. 150Rp. 150 Rp. 200 Rp. 250 Rp. 250 Rp. 250
281 Panel GRC Lembar Rp. 65,000Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 70,000 Rp. 70,000
282 Panel List Stainless m Rp. 50,000Rp. 50,000 Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000
283 Papan PVC m' Rp. 16,000Rp. 16,000 Rp. 16,500 Rp. 16,500 Rp. 17,000 Rp. 17,000
284 Papan Kayu Pinus 100 x 7 x 2cm LBR Rp. 9,000Rp. 9,000 Rp. 10,000 Rp. 10,000 Rp. 12,000 Rp. 12,000
285 Pasir Batu (Sirtu) m3 Rp. 253,000 Rp. 321,000 Rp. 345,000 Rp. 366,000 Rp. 361,000 Rp. 399,000
286 Pasir Cor / Beton m3 Rp. 274,000 Rp. 346,000 Rp. 372,000 Rp. 387,000 Rp. 390,000 Rp. 430,000
287 Pasir Pasang m3 Rp. 269,000 Rp. 340,000 Rp. 363,000 Rp. 389,000 Rp. 381,000 Rp. 412,000
288 Pasir Urug m3 Rp. 175,000 Rp. 175,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
289 Panel Beton uk 240 x 50 x 5 cm Buah Rp. 179,000 Rp. 182,000 Rp. 185,000 Rp. 185,000 Rp. 192,000 Rp. 192,000
290 Paving Block tebal 6 cm Type Dosex six Buah Rp. 3,000 Rp. 3,000 Rp. 3,100 Rp. 3,100 Rp. 3,200 Rp. 3,200
291 Paving Block tebal 6 cm Type Kromer Buah Rp. 4,000 Rp. 4,100 Rp. 4,100 Rp. 4,100 Rp. 4,300 Rp. 4,300
292 Paving Block tebal 8 cm Type Kromer Buah Rp. 4,800 Rp. 4,900 Rp. 5,000 Rp. 5,000 Rp. 5,100 Rp. 5,100
293 Paving Block tebal 6 cm Type Uni Buah Rp. 3,000 Rp. 3,000 Rp. 3,100 Rp. 3,100 Rp. 3,200 Rp. 3,200
294 Paving Block tebal 8 cm Type Uni Buah Rp. 3,500 Rp. 3,600 Rp. 3,600 Rp. 3,600 Rp. 3,700 Rp. 3,700
295 Paving Block tebal 6 cm Type Omega Buah Rp. 3,000 Rp. 3,000 Rp. 3,100 Rp. 3,100 Rp. 3,200 Rp. 3,200
296 Paving Block tebal 8 cm Type Omega Buah Rp. 3,800 Rp. 3,900 Rp. 3,900 Rp. 3,900 Rp. 4,100 Rp. 4,100
297 Paving Block tebal 6 cm Type Florendo Buah Rp. 3,100 Rp. 3,200 Rp. 3,200 Rp. 3,200 Rp. 3,300 Rp. 3,300
298 Paving Block tebal 6 cm Type Behaton Buah Rp. 3,300 Rp. 3,400 Rp. 3,400 Rp. 3,400 Rp. 3,500 Rp. 3,500
299 Paving Block tebal 6 cm Type Uni Décor Buah Rp. 3,000 Rp. 3,000 Rp. 3,100 Rp. 3,100 Rp. 3,200 Rp. 3,200
300 Paving Block tebal 6 cm Type Hollandish Buah Rp. 2,600 Rp. 2,600 Rp. 2,700 Rp. 2,700 Rp. 2,700 Rp. 2,700
301 Paving Block tebal 8 cm Type Hollandish Buah Rp. 3,200 Rp. 3,300 Rp. 3,300 Rp. 3,300 Rp. 3,400 Rp. 3,400
302 Pegangan Laci SET Rp. 20,000 Rp. 20,000 Rp. 22,500 Rp. 22,500 Rp. 25,000 Rp. 25,000
303 Pegangan Kabinet SET Rp. 20,000 Rp. 20,000 Rp. 22,500 Rp. 22,500 Rp. 25,000 Rp. 25,000
304 Pintu Fibber Kamar Mandi Buah Rp. 250,000 Rp. 275,000 Rp. 285,000 Rp. 285,000 Rp. 300,000 Rp. 300,000
305 Pipa Galvanis 1/2 in. Tebal 1,1 cm Batang Rp. 55,000 Rp. 55,000 Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000
306 Pipa Galvanis 1/2 in. Tebal 1,4 cm Batang Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 65,000 Rp. 71,000 Rp. 71,000
307 Pipa Galvanis 1/2 in. Tebal 1,6 cm Batang Rp. 70,000 Rp. 70,000 Rp. 70,000 Rp. 71,000 Rp. 76,500 Rp. 76,500
308 Pipa Galvanis 3/4 in. Tebal 1,6 cm Batang Rp. 75,000 Rp. 75,000 Rp. 75,000 Rp. 77,000 Rp. 80,000 Rp. 80,000
309 Pipa Galvanis 1 in. Tebal 1 cm Batang Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000
310 Pipa Galvanis 1 in. Tebal 1,6 cm Batang Rp. 105,000 Rp. 105,000 Rp. 105,000 Rp. 106,000 Rp. 112,000 Rp. 112,000
311 Pipa Galvanis 1 in. Tebal 1,7 cm Batang Rp. 120,000 Rp. 120,000 Rp. 120,000 Rp. 123,000 Rp. 129,000 Rp. 129,000
312 Pipa Galvanis 1 1/2 in. Tebal 1,3 cm Batang Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 155,000 Rp. 155,000
313 Pipa Galvanis 1 1/2 in. Tebal 1,5 cm Batang Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 160,000 Rp. 165,000 Rp. 165,000
314 Pipa Galvanis 1 1/2 in. Tebal 1,6 cm Batang Rp. 170,000 Rp. 175,000 Rp. 179,000 Rp. 179,000 Rp. 185,000 Rp. 185,000
315 Pipa Stainlist 2 inc m' Rp. 485,000 Rp. 485,000 Rp. 490,000 Rp. 490,000 Rp. 495,000 Rp. 495,000
316 Pipa PVC 1/2 in x 4 m Batang Rp. 21,000 Rp. 20,000 Rp. 23,500 Rp. 25,000 Rp. 30,000 Rp. 32,000
317 Pipa PVC 3/4 in x 4 m Batang Rp. 25,000 Rp. 25,000 Rp. 30,000 Rp. 30,000 Rp. 35,000 Rp. 35,000
318 Pipa PVC 1 in x 4 m Batang Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000 Rp. 45,000 Rp. 45,000
319 Pipa PVC 1 1/4 in x 4 m Batang Rp. 55,000 Rp. 60,000 Rp. 60,000 Rp. 60,000 Rp. 65,000 Rp. 65,000
320 Pipa PVC 1,5 in x 4 m Batang Rp. 65,000 Rp. 70,000 Rp. 75,000 Rp. 75,000 Rp. 80,000 Rp. 80,000
321 Pipa PVC 2 in x 4 m Batang Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 90,000 Rp. 95,000 Rp. 90,000
322 Pipa PVC 2,5 in x 4 m Batang Rp. 115,000 Rp. 115,000 Rp. 135,000 Rp. 135,000 Rp. 140,000 Rp. 140,000
323 Pipa PVC 3 in x 4 m Batang Rp. 155,000 Rp. 155,000 Rp. 155,000 Rp. 165,000 Rp. 165,000 Rp. 165,000
324 Pipa PVC 4 in x 4 m Batang Rp. 260,000 Rp. 260,000 Rp. 260,000 Rp. 260,000 Rp. 275,000 Rp. 275,000
325 Pipa PVC RRJ SNI 06-0084-2002 (1/2 in x 6 m) Batang Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000 Rp. 65,000 Rp. 65,000
326 Pipa PVC RRJ SNI 06-0084-2002 (1 in x 6 m) Batang Rp. 83,000 Rp. 83,000 Rp. 85,000 Rp. 85,000 Rp. 87,000 Rp. 90,000
327 Pipa PVC RRJ SNI 06-0084-2002 (2 in x 6 m) Batang Rp. 336,000 Rp. 336,000 Rp. 339,000 Rp. 339,000 Rp. 342,000 Rp. 342,000
328 Pipa PVC RRJ SNI 06-0084-2002 (3 in x 6 m) Batang Rp. 627,000 Rp. 627,000 Rp. 631,000 Rp. 631,000 Rp. 634,000 Rp. 634,000
329 Pipa PVC RRJ SNI 06-0084-2002 (4 in x 6 m) Batang Rp. 918,000 Rp. 918,000 Rp. 922,000 Rp. 922,000 Rp. 926,000 Rp. 926,000
330 Pipa PVC RRJ SNI 06-0084-2002 (6 in x 6 m) Batang Rp. 1,864,000 Rp. 1,864,000 Rp. 1,868,000 Rp. 1,868,000 Rp. 1,872,000 Rp. 1,872,000
331 Pipa PVC RRJ SNI 06-0084-2002 (8 in x 6 m) Batang Rp. 2,889,000 Rp. 2,889,000 Rp. 2,894,000 Rp. 2,894,000 Rp. 2,899,000 Rp. 2,899,000
332 Pipa PVC RRJ SNI 06-0084-2002 (10 in x 6 m) Batang Rp. 4,479,000 Rp. 4,479,000 Rp. 4,485,000 Rp. 4,485,000 Rp. 4,491,000 Rp. 4,491,000
333 Plin Kramik 10 x 10 buah Rp. 2,000 Rp. 2,000 Rp. 2,000 Rp. 2,000 Rp. 2,500 Rp. 2,500
334 Plin Kramik 10 x 20 buah Rp. 4,400 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000 Rp. 5,000
335 Plin Kramik 10 x 30 buah Rp. 7,700 Rp. 7,700 Rp. 7,900 Rp. 10,000 Rp. 10,000 Rp. 10,000
336 Plin Kramik 10 x 40 buah Rp. 8,500 Rp. 8,500 Rp. 8,750 Rp. 12,000 Rp. 12,000 Rp. 12,000
337 Plin Kramik 5 x 20 buah Rp. 1,900 Rp. 1,900 Rp. 2,000 Rp. 2,000 Rp. 2,500 Rp. 2,500
338 Plint Ubin Granito 10 x 40 cm Pcs Rp. 19,800 Rp. 19,800 Rp. 19,800 Rp. 19,800 Rp. 19,800 Rp. 19,800
339 Plint Ubin Granito 10 x 60 cm Pcs Rp. 22,650 Rp. 22,650 Rp. 22,650 Rp. 22,650 Rp. 22,650 Rp. 22,650
340 Plat Strip Kg Rp. 12,800 Rp. 12,800 Rp. 12,900 Rp. 12,900 Rp. 13,000 Rp. 13,000
341 Reng Lipat 6m 1 Ikat, 10 Bt, 0,3 Batang Rp. 39,500 Rp. 39,500 Rp. 40,000 Rp. 40,000 Rp. 41,000 Rp. 41,000
342 Rel laci Tandem Softclose FGV 50cm SET Rp. 50,000 Rp. 50,000 Rp. 55,000 Rp. 55,000 Rp. 60,000 Rp. 60,000
343 Rel laci Tandem Softclose FGV 30cm SET Rp. 30,000 Rp. 30,000 Rp. 35,000 Rp. 35,000 Rp. 35,000 Rp. 37,000
344 Rel sliding hettich M Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000
345 Rubber List Panel M Rp. 5,000 Rp. 5,000 Rp. 6,000 Rp. 6,000 Rp. 6,500 Rp. 6,500
346 Rolling Door Rail M Rp. 30,000 Rp. 30,000 Rp. 35,000 Rp. 35,000 Rp. 40,000 Rp. 40,000
347 Rol Cat Buah Rp. 25,000 Rp. 25,000 Rp. 25,000 Rp. 30,000 Rp. 30,000 Rp. 30,000
348 Roster Beton uk 20x20 cm Buah Rp. 29,000 Rp. 29,500 Rp. 29,750 Rp. 29,750 Rp. 30,000 Rp. 30,000
349 Roster Kaca GS uk 20x20 cm Buah Rp. 29,000 Rp. 29,500 Rp. 30,000 Rp. 30,000 Rp. 40,000 Rp. 40,000
350 Roster Keramik Besar uk 20x20 cm Buah Rp. 60,000 Rp. 60,000 Rp. 60,000 Rp. 60,000 Rp. 65,000 Rp. 65,000
351 Roster Keramik Kecil uk. 20x10 cm Buah Rp. 35,000 Rp. 35,000 Rp. 35,500 Rp. 35,000 Rp. 45,000 Rp. 45,000
352 Saklar Tunggal Biasa Buah Rp. 7,500 Rp. 7,500 Rp. 10,000 Rp. 10,000 Rp. 12,500 Rp. 12,500
353 Saklar Tunggal Setara Panasonic Buah Rp. 25,000 Rp. 25,000 Rp. 30,000 Rp. 35,000 Rp. 35,000 Rp. 35,500
354 Saklar Double Biasa Buah Rp. 10,000 Rp. 10,000 Rp. 12,500 Rp. 12,500 Rp. 15,000 Rp. 15,000
355 Saklar Double Setara Panasonic Buah Rp. 35,000 Rp. 36,000 Rp. 38,000 Rp. 40,000 Rp. 40,000 Rp. 45,000
356 Saklar Triple Setara Panasonic Buah Rp. 48,000 Rp. 48,000 Rp. 50,000 Rp. 57,000 Rp. 60,000 Rp. 60,000
357 Semen Standar SNI (50 kg) Zak Rp. 58,000 Rp. 58,000 Rp. 60,000 Rp. 60,000 Rp. 60,000 Rp. 60,000
358 Semen Warna kg Rp. 7,500 Rp. 7,500 Rp. 8,000 Rp. 8,000 Rp. 8,500 Rp. 8,500
359 Skrup Kembang Full Thread 5 cm Kotak Rp. 100,000 Rp. 100,000 Rp. 110,000 Rp. 110,000 Rp. 120,000 Rp. 120,000
360 Skrup Kembang Full Thread 3 cm Kotak Rp. 90,000 Rp. 90,000 Rp. 95,000 Rp. 95,000 Rp. 100,000 Rp. 100,000
361 Skrup Kembang Full Thread 1,5 cm Kotak Rp. 80,000 Rp. 80,000 Rp. 85,000 Rp. 87,000 Rp. 90,000 Rp. 90,000
362 Spandek 4 m Lembar Rp. 228,000 Rp. 320,000 Rp. 322,000 Rp. 322,000 Rp. 324,000 Rp. 324,000
363 Spandek 6 m Lembar Rp. 342,000 Rp. 480,000 Rp. 482,000 Rp. 482,000 Rp. 484,000 Rp. 484,000
364 Stop Kontak + Instalasi Buah Rp. 60,000 Rp. 60,000 Rp. 0 Rp. 62,000 Rp. 65,000 Rp. 65,000
365 Stub Plange 6" Buah Rp. 476,000 Rp. 476,000 Rp. 481,000 Rp. 481,000 Rp. 483,000 Rp. 483,000
366 Stub Plange 8" Buah Rp. 745,000 Rp. 745,000 Rp. 752,000 Rp. 752,000 Rp. 756,000 Rp. 756,000
367 Stub Plange 10" Buah Rp. 1,089,000 Rp. 1,089,000 Rp. 1,100,000 Rp. 1,100,000 Rp. 1,105,000 Rp. 1,105,000
368 Tanah Urug Biasa m3 Rp. 80,000 Rp. 99,000 Rp. 100,000 Rp. 100,000 Rp. 110,000 Rp. 115,000
369 Tanah Urug Pilihan m3 Rp. 100,000 Rp. 100,000 Rp. 100,000 Rp. 105,000 Rp. 115,000 Rp. 125,000
370 Teakwood (240 x 120 x 0,4) cm Lembar Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000 Rp. 95,000 Rp. 95,000
371 Tempat Cuci Piring Stainless biasa 1 lubang Buah Rp. 160,000 Rp. 180,000 Rp. 250,000 Rp. 250,000 Rp. 270,000 Rp. 270,000
372 Tee 6" Buah Rp. 654,000 Rp. 654,000 Rp. 661,000 Rp. 661,000 Rp. 664,000 Rp. 664,000
373 Tee 8" Buah Rp. 834,000 Rp. 834,000 Rp. 842,000 Rp. 842,000 Rp. 847,000 Rp. 847,000
374 Tee 10" Buah Rp. 1,199,500 Rp. 1,199,500 Rp. 1,211,000 Rp. 1,211,000 Rp. 1,217,000 Rp. 1,217,000
375 Textile Sofa Variasi m2 Rp. 65,000 Rp. 65,000 Rp. 70,000 Rp. 70,000 Rp. 75,000 Rp. 75,000
376 Textile PVC Leather Variasi m2 Rp. 150,000 Rp. 150,000 Rp. 160,000 Rp. 160,000 Rp. 165,000 Rp. 165,000
377 Tiang Panel Beton uk. 250 x 20 x 20 cm Buah Rp. 260,000 Rp. 263,000 Rp. 267,000 Rp. 267,000 Rp. 273,000 Rp. 273,000
378 Triplek Lapis melaminto Tebal 9 mm Lembar Rp. 115,000 Rp. 115,000 Rp. 115,000 Rp. 120,000 Rp. 120,000 Rp. 120,000
379 Triplek Tebal 9 mm Lembar Rp. 120,000 Rp. 135,000 Rp. 0 Rp. 135,000 Rp. 140,000 Rp. 140,000
380 Triplek Tebal 6 mm Lembar Rp. 90,000 Rp. 90,000 Rp. 95,000 Rp. 95,000 Rp. 130,000 Rp. 130,000
381 Triplek Tebal 5 mm Lembar Rp. 70,000 Rp. 75,000 Rp. 85,000 Rp. 85,000 Rp. 90,000 Rp. 90,000
382 Triplek Tebal 4 mm Lembar Rp. 60,000 Rp. 65,000 Rp. 65,000 Rp. 75,000 Rp. 85,000 Rp. 85,000
383 Triplek Tebal 3mm Lembar Rp. 55,000 Rp. 55,000 Rp. 55,000 Rp. 55,000 Rp. 65,000 Rp. 65,000
384 Triplek uk. 244 x 122 Tebal 18 mm Lembar Rp. 280,000 Rp. 280,000 Rp. 300,000 Rp. 300,000 Rp. 320,000 Rp. 320,000
385 Ubin Granito 40 x 40 cm m2 Rp. 285,000 Rp. 285,000 Rp. 287,000 Rp. 287,000 Rp. 290,000 Rp. 290,000
386 Ubin Granito 60 x 60 cm m2 Rp. 300,000 Rp. 300,000 Rp. 310,000 Rp. 310,000 Rp. 315,000 Rp. 315,000
387 UDITCH 60x60x120 Buah Rp. 1,842,500 Rp. 1,842,500 Rp. 1,897,500 Rp. 1,969,000 Rp. 2,007,500 Rp. 2,145,000
388 UDITCH 100x100x120 Buah Rp. 3,492,500 Rp. 3,492,500 Rp. 3,628,900 Rp. 3,712,500 Rp. 3,795,000 Rp. 4,020,500
389 Urinoir Buah Rp. 815,000 Rp. 815,000 Rp. 820,000 Rp. 825,000 Rp. 825,000 Rp. 825,000
390 Viber Penampung Air 1000 L Buah Rp. 1,600,000 Rp. 1,650,000 Rp. 1,700,000 Rp. 1,700,000 Rp. 1,800,000 Rp. 1,800,000
391 Viber Penampung Air 2000 L Buah Rp. 3,500,000 Rp. 3,600,000 Rp. 3,700,000 Rp. 3,800,000 Rp. 4,000,000 Rp. 4,000,000
392 Viber Penampung Air 3000 L Buah Rp. 5,600,000 Rp. 5,600,000 Rp. 5,800,000 Rp. 5,800,000 Rp. 6,000,000 Rp. 6,000,000
393 Walpaper M2 Rp. 900,000 Rp. 900,000 Rp. 900,000 Rp. 900,000 Rp. 900,000 Rp. 900,000
394 Washtafel Cuci Tangan Sedang + Aksesoris Buah Rp. 450,000 Rp. 450,000 Rp. 455,000 Rp. 460,000 Rp. 460,000 Rp. 460,000
395 Water toren Penampung Stainless 1000 L Buah Rp. 2,500,000 Rp. 2,500,000 Rp. 2,600,000 Rp. 2,600,000 Rp. 2,615,000 Rp. 2,615,000

C * SEWA ALAT
1 ASPHALT FINISHER / Jam Rp. 640,000 Rp. 640,000 Rp. 640,000 Rp. 640,000 Rp. 640,000 Rp. 640,000
2 ASPHALT SPRAYER / Jam Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000
3 BULLDOZER 100-150 HP / Jam Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
4 COMPRESSOR 4000-6500 L\M / Jam Rp. 195,500 Rp. 195,500 Rp. 195,500 Rp. 195,500 Rp. 195,500 Rp. 195,500
5 CONCRETE MIXER 0.3-0.6 M3 / Jam Rp. 54,600 Rp. 54,600 Rp. 54,600 Rp. 54,600 Rp. 54,600 Rp. 54,600
6 Chainsaw / Jam Rp. 20,000 Rp. 20,000 Rp. - Rp. 20,000 Rp. 20,000 Rp. 20,000
7 CRANE 10-15 TON / Jam Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000 Rp. 300,000
8 DUMP TRUCK 3.5 TON / Jam Rp. 182,900 Rp. 182,900 Rp. 182,900 Rp. 182,900 Rp. 182,900 Rp. 182,900
9 DUMP TRUCK 10 TON / Jam Rp. 294,000 Rp. 294,000 Rp. 294,000 Rp. 294,000 Rp. 294,000 Rp. 294,000
10 EXCAVATOR 135 HP / Jam Rp. 595,000 Rp. 595,000 Rp. 595,000 Rp. 595,000 Rp. 595,000 Rp. 595,000
11 EXCAVATOR Long Arm / Jam Rp. 745,000 Rp. 745,000 Rp. 745,000 Rp. 745,000 Rp. 745,000 Rp. 745,000
12 FLAT BED TRUCK 3-4 M3 / Jam Rp. 96,000 Rp. 96,000 Rp. 96,000 Rp. 96,000 Rp. 96,000 Rp. 96,000
13 GENERATOR SET / Jam Rp. 359,400 Rp. 359,400 Rp. 359,400 Rp. 359,400 Rp. 359,400 Rp. 359,400
14 MOTOR GRADER Type 85 HP / Jam Rp. 434,100 Rp. 434,100 Rp. 434,100 Rp. 434,100 Rp. 434,100 Rp. 434,100
15 MOTOR GRADER Type 100 HP / Jam Rp. 554,100 Rp. 554,100 Rp. 554,100 Rp. 554,100 Rp. 554,100 Rp. 554,100
15 Molen 0,35 m3 / Hari Rp. 200,000 Rp. 200,000 Rp. - Rp. 200,000 Rp. 200,000 Rp. 200,000
16 Mesin potong besi / Hari Rp. 25,000 Rp. 25,000 Rp. - Rp. 25,000 Rp. 25,000 Rp. 25,000
17 TRACK LOADER 75-100 HP / Jam Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000
18 WHEEL LOADER 1.0-1.6 M3 / Jam Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000 Rp. 315,000
19 THREE WHEEL ROLLER 6-8 T / Jam Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000 Rp. 150,000
20 TANDEM ROLLER 6-8 T. / Jam Rp. 455,300 Rp. 455,300 Rp. 455,300 Rp. 455,300 Rp. 455,300 Rp. 455,300
21 TIRE ROLLER 8-10 T. / Jam Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
22 Truk Mixer Plant Kapsitas 3 m3 / Jam Rp. 571,000 Rp. 571,000 Rp. 643,000 Rp. 643,000 Rp. 714,000 Rp. 714,000
23 Truk Mixer Plant Kapsitas 7 m3 / Jam Rp. 714,000 Rp. 714,000 Rp. 786,000 Rp. 786,000 Rp. 857,000 Rp. 857,000
24 VIBRATORY ROLLER 10 T. / Jam Rp. - Rp. - Rp. - Rp. - Rp. - Rp. -
25 VIBRATORY ROLLER 5-8 T. / Jam Rp. 411,000 Rp. 411,000 Rp. 411,000 Rp. 411,000 Rp. 411,000 Rp. 411,000
26 CONCRETE VIBRATOR / Jam Rp. 28,800 Rp. 28,800 Rp. 28,800 Rp. 28,800 Rp. 28,800 Rp. 28,800
27 WATER PUMP 70-100 mm / Jam Rp. 63,300 Rp. 63,300 Rp. 63,300 Rp. 63,300 Rp. 63,300 Rp. 63,300
28 WATER TANKER 3000-4500 L. / Jam Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000 Rp. 138,000
29 PEDESTRIAN ROLLER / Jam Rp. 120,800 Rp. 120,800 Rp. 120,800 Rp. 120,800 Rp. 120,800 Rp. 120,800
30 Pompa air disel 5 KW / Hari 200,000 Rp. 200,000 Rp. - Rp. 200,000 Rp. 200,000 Rp. 200,000
31 TAMPER / Jam Rp. 48,900 Rp. 48,900 Rp. 48,900 Rp. 48,900 Rp. 48,900 Rp. 48,900
32 Theodolith / Hari Rp. 200,000 Rp. 200,000 Rp. - Rp. 200,000 Rp. 200,000 Rp. 200,000
33 JACK HAMMER / Jam Rp. 23,000 Rp. 23,000 Rp. 23,000 Rp. 23,000 Rp. 23,000 Rp. 23,000
34 Waterpass / Hari Rp. 150,000 Rp. 150,000 Rp. - Rp. 150,000 Rp. 150,000 Rp. 150,000

BUPATI TULANG BAWANG

WINARTI
PERHITUNGAN VOLUME
KEGIATAN : Pembinaan dan Fasilitas Pengembangan UMKM
PEKERJAAN : Bangunan Sarana Pemasaran Produk UMKM Kegiatan Pembinaan dan Fasilitasi pengembangan UMKM
LOKASI : Menggala
KABUPATEN : Tulang Bawang
T. ANGGARAN : 2020

CALCULATION DETAILS
NO. URAIAN PEKERJAAN B KOEF. SAT. JUMLAH
H L Nos FORMULA
B1 B2 0,5 D 1,0

A PEKERJAAN PERSIAPAN

B REHABILITASI KANTOR

I PEKERJAAN BONGKARAN

1 Pek. Bongkaran Tiang/Kolom Teras Depan


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

2 Pek. Bongkaran Kusen Pintu dan Jendela


1.00 1.00 1.00 24.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 24.00
bh 24.00

3 Pek. Bongkaran Dinding Bata


0.15 3.80 0.85 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 0.97
0.15 3.80 3.50 1.00 1.00 m2 2.00
0.15 3.80 22.00 1.00 1.00 m2 12.54
m2 15.50

4 Pek. Bongkaran Keramik Lantai dan Dinding


Lantai 228.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 228.00
Dinding KM/WC 1.00 1.80 6.70 3.00 1.00 m2 36.18
m2 264.18

5 Pek. Bongkaran Kloset dan Bak Air KM/WC


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

6 Pek. Bongkaran Plafond


310.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 310.00
m2 310.00

7 Pek. Bongkaran Atap dan Kuda-kuda


310.00 1.00 1.00 1.00 1.20 (B1 + B2) x H x L x Nos x Koef m2 372.00
m2 372.00

8 Membuang/Memindahkan Bongkaran
1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

II PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian Tanah


Pondasi Foot Plat 0.80 0.90 0.80 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 2.30
Pondasi Batu Belah 0.70 0.90 0.85 59.65 1.00 0.50 m3 40.56
Selokan 0.45 0.30 86.00 1.00 1.00 m3 11.61
m3 54.48

2 Pek. Urugan Pasir di Bawah Pondasi


Pondasi Foot Plat 0.80 0.05 0.80 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.13
Pondasi Batu Belah 0.70 0.05 59.65 1.00 1.00 m3 2.09
m3 2.22

3 Pek. Lantai Kerja Pondasi Foot Plat


Pondasi Foot Plat 0.80 0.05 0.80 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.13
m3 0.13

4 Pek. Pondasi Foot Plat


- Beton, K-175 0.80 0.20 0.80 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.51
- Pembesian 0.80 0.20 0.80 4.00 139.00 kg 71.17
5 Pek. Leher Pondasi Foot Plat K1 (20/20)
- Beton, K-175 0.25 0.80 0.25 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.10
- Pembesian 0.25 1.20 0.25 2.00 127.00 kg 19.05
- Begisting 1.00 0.80 1.00 2.00 1.00 m2 1.60

6 Pas. Pondasi Batu Belah, Adk. 1:4


Pondasi Batu Belah 0.30 0.60 0.60 83.00 1.00 0.50 (B1 + B2) x H x L x Nos x Koef m3 22.41
Pondasi Umpak 0.30 0.60 0.60 0.60 8.00 0.50 m3 1.30
m3 23.71

7 Pek. Urugan Kembali Galian


= 1/3 x Vol Galian m3 18.16
m3 18.16

8 Pek. Urugan Tanah Peninggian Lantai


13.00 0.20 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 2.60
196.00 0.35 1.00 1.00 1.00 m3 68.60
m3 71.20

9 Pemadatan Tanah Urug


71.20 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 71.20
m3 71.20

III PEKERJAAN BETON

1 Pek. Sloof (15/20)


- Beton, K-175 0.15 0.20 116.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 3.50
- Pembesian 0.15 0.20 116.50 1.00 127.00 kg 443.87
- Begisting 0.40 1.00 116.50 1.00 1.00 m2 46.60

2 Pek. Sloof (15/20)


- Beton, K-175 0.15 0.20 83.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 2.49
- Pembesian 0.15 0.20 83.00 1.00 131.00 kg 326.19
- Begisting 0.40 1.00 83.00 1.00 1.00 m2 33.20

3 Pek. Kolom K1 (20/20)


- Beton, K-175 0.20 3.25 0.20 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.26
- Pembesian 0.20 3.25 0.20 2.00 127.00 kg 33.02
- Begisting 0.80 3.25 1.00 2.00 1.00 m2 5.20

4 Pek. Kolom KS (20/20)


- Beton, K-175 0.20 2.75 0.20 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.44
- Pembesian 0.20 2.75 0.20 4.00 122.00 kg 53.68
- Begisting 0.80 2.75 1.00 4.00 1.00 m2 8.80

5 Pek. Kolom Praktis Kp (11/11)


- Beton, K-175 0.11 3.65 0.11 23.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.02
- Pembesian 0.11 3.65 0.11 23.00 240.00 kg 243.79
- Begisting 0.22 3.65 1.00 23.00 1.00 m2 18.47

6 Pek. Balok Kanopi (15/20)


- Beton, K-175 0.15 0.20 16.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.48
- Pembesian 0.15 0.20 16.00 1.00 145.00 kg 69.60
- Begisting 0.50 1.00 16.00 1.00 1.00 m2 8.00

7 Pek. Plat Kanopi (t=10 cm)


- Beton, K-175 0.60 0.10 16.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.96
- Pembesian 0.90 0.10 16.00 1.00 95.00 kg 136.80
- Begisting 0.60 1.00 16.00 1.00 1.00 m2 9.60

8 Pek. Balok Teras Depan (15/20)


- Beton, K-175 0.15 0.08 14.30 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.17
- Pembesian 0.15 0.30 14.30 1.00 163.00 kg 104.89
- Begisting 0.31 1.00 14.30 1.00 1.00 m2 4.43

9 Pek. Balok (10/50)


- Beton, K-175 0.10 0.38 14.30 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.54
- Pembesian 0.10 0.50 14.30 1.00 120.00 kg 85.80
- Begisting 0.86 1.00 14.30 1.00 1.00 m2 12.30

10 Pek. Plat Atap Dak (t=12 cm)


- Beton, K-175 15.31 0.12 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.84
- Pembesian 15.31 0.12 1.00 1.00 79.00 kg 145.16
- Begisting 15.31 1.00 1.00 1.00 1.00 m2 15.31
11 Pek. Ring Balok RB (15/20)
- Beton, K-175 0.15 0.20 65.90 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.98
- Pembesian 0.15 0.20 65.90 1.00 131.00 kg 258.99
- Begisting 0.40 1.00 65.90 1.00 1.00 m2 26.36

12 Pek. Balok Latai (15/20)


- Beton, K-175 0.15 0.20 58.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.76
- Pembesian 0.15 0.20 58.60 1.00 131.00 kg 230.30
- Begisting 0.55 1.00 58.60 1.00 1.00 m2 32.23

13 Pek. Meja Beton (t=10 cm)


- Beton, K-175 0.70 0.10 2.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.18
- Pembesian 0.70 0.10 2.50 1.00 95.00 kg 16.63
- Begisting 0.70 1.00 2.35 1.00 1.00 m2 1.65

- Beton, K-175 0.70 0.10 1.75 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.12
- Pembesian 0.70 0.10 1.75 1.00 95.00 kg 11.64
- Begisting 0.70 1.00 1.60 1.00 1.00 m2 1.12

IV PEKERJAAN PASANGAN

1 Pas. Bata, Adk. 1:4


Dinding Baru 1.00 3.50 83.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 290.50
1.00 0.50 17.00 1.00 1.00 m2 8.50
1.00 0.40 9.10 1.00 1.00 m2 3.64
1.00 0.30 9.70 1.00 1.00 m2 2.91
Selokan 1.00 0.80 65.30 1.00 1.00 m2 52.24
Penebalan Kolom 12.69 1.00 1.00 1.00 1.00 m2 12.69
Meja Dapur 0.60 0.80 - 1.00 1.00 m2 -
Bongkar Kusen J3 4.32 1.00 - 2.00 1.00 m2 -
Bongkar Kusen J4 1.77 1.00 - 4.00 1.00 m2 -
- Dikurangi
PF 3.35 2.22 1.00 1.00 1.00 m2 (7.44)
P1 0.88 2.75 1.00 3.00 1.00 m2 (7.26)
P3 0.68 2.10 1.00 1.00 1.00 m2 (1.43)
J2 1.35 1.75 1.00 8.00 1.00 m2 (18.90)
J3 - 1.75 1.00 1.00 1.00 m2 -
J4 2.70 2.25 1.00 4.00 1.00 m2 (24.30)
BV 0.75 1.20 1.00 1.00 1.00 m2 (0.90)
m2 310.26

2 Pek. Plesteran Dinding, Adk. 1:4


= Pas. Bata 245.33 1.00 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 490.65
Penebalan Kolom 12.69 1.00 1.00 1.00 1.00 m2 12.69
m2 503.34

3 Pek. Acian Dinding


490.65 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 490.65
m2 490.65

4 Pek. Perapihan Opening Kusen Pintu dan Jendela


PF 1.00 1.00 7.99 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 7.99
P1 1.00 1.00 6.38 3.00 1.00 m' 19.14
P2 1.00 1.00 6.98 - 1.00 m' -
J2 1.00 1.00 6.20 8.00 1.00 m' 49.60
J3 1.00 1.00 7.52 - 1.00 m' -
J4 1.00 1.00 9.90 4.00 1.00 m' 39.60
P3 1.00 1.00 4.88 1.00 1.00 m' 4.88
BV 1.00 1.00 3.90 1.00 1.00 m' 3.90
Pb 1.00 1.00 6.75 - 1.00 m' -
m' 125.11

5 Pek. Plesteran Plat Atap dan Kanopi (t=3 cm), Adk. 1:3
Plat Atap 15.31 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 15.31
Kanopi 0.60 1.00 16.00 1.00 1.00 m2 9.60
m2 24.91

6 Pek. Finishing Expose Kolom dan Kanopi Beton


Ks1 1.40 1.00 0.50 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.40
1.40 1.00 3.00 2.00 1.00 m2 8.40
Ks 0.75 1.00 2.75 5.00 1.00 m2 10.31
Kanopi 0.60 1.00 16.00 1.00 1.00 m2 9.60
m2 29.71
7 Pek. Penebalan Kolom Bundar Menjadi Persegi
Tiang Samping 1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

8 Pek. Profil Semen


Ks 1.00 1.00 3.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 6.00
Kanopi 1.00 1.00 16.00 1.00 1.00 m' 16.00
J4 1.00 1.00 3.70 5.00 1.00 m' 18.50
Tiang Samping 1.00 1.00 1.20 2.00 1.00 m' 2.40
m' 42.90

9 Pek. Profil Semen Lisplank (t=50 cm)


1.00 1.00 11.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 11.50
m' 11.50

10 Pek. Plesteran Selokan Air Hujan (t=15 mm), Adk. 1:3


1.20 1.00 65.30 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 78.36
m2 78.36

11 Pek. Acian Selokan Air Hujan


1.20 1.00 65.30 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 78.36
m2 78.36

V PEKERJAAN ATAP

1 Pek. Kuda-kuda Baja Ringan - SNI


25.50 11.50 1.00 8.10 2.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 299.70
14.00 1.00 8.10 1.00 0.50 m2 56.70
10.00 1.00 5.80 1.00 0.50 m2 29.00
5.00 1.00 3.10 2.00 1.00 m2 31.00
3.00 1.00 1.00 2.50 2.00 0.50 m2 10.00
m2 426.40

2 Pas. Genteng Aspal, Ex. Onduvilla


= V kuda-kuda m2 426.40
m2 426.40

3 Pas. Allumunium Foil (Double Side)


= V Atap m2 426.40
m2 426.40

4 Pas. Nok Genteng Aspal


1.00 1.00 57.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 57.60
m' 57.60

5 Pas. Talang Zincalume


1.00 1.00 6.20 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 6.20
m' 6.20

6 Pas. Listplank GRC


1.00 1.00 81.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 81.50
m' 81.50

VI PEKERJAAN PLAFOND

1 Pek. Plafond PVC + Rangka Hollow Galvanis (Flat)


Teras 23.80 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 23.80
Dalam 244.10 1.00 1.00 1.00 1.00 m2 244.10
KM/WC 9.60 1.00 1.00 4.00 1.00 m2 38.40
Tritisan 70.00 1.00 1.00 1.00 1.00 m2 70.00
m2 376.30

2 Pek. List Plafond PVC


Teras 1.00 1.00 33.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 33.50
Dalam 1.00 1.00 253.50 1.00 1.00 m' 253.50
KM/WC 1.00 1.00 25.00 4.00 1.00 m' 100.00
Tritisan 1.00 1.00 73.80 1.00 1.00 m' 73.80
m' 460.80
VII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pek. Urugan Pasir di Bawah Lantai (t=5 cm)


209.00 0.05 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 10.45
m3 10.45

2 Pas. Lantai Keramik 40 x 40


Teras 21.70 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 21.70
Dalam 238.90 1.00 1.00 1.00 1.00 m2 238.90
m2 260.60

3 Pas. Plint Lantai keramik 10 x 40 cm


1.00 1.00 255.20 1.00 0.70 (B1 + B2) x H x L x Nos x Koef m' 178.64
m' 178.64

4 Pas. Lantai Keramik 30 x 30 cm (Warna)


KM/WC 3.20 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 6.40
1.60 1.00 1.00 2.00 1.00 m2 3.20
Janitor 0.75 1.00 1.00 1.00 1.00 m2 0.75
R. Genset 4.40 1.00 1.00 1.00 1.00 m2 4.40
m2 14.75

5 Pas. Dinding Keramik 30 x 60 cm (Warna)


KM/WC 1.00 2.50 7.40 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 37.00
1.00 2.50 5.10 2.00 1.00 m2 25.50
Pantry 1.00 2.50 5.90 1.00 1.00 m2 14.75
1.00 1.00 0.80 1.00 1.00 m2 0.80
- dikurangi
P3 0.80 2.10 1.00 4.00 1.00 m2 6.72
m2 84.77

6 Pas. Batu Alam Andesit (20/40) + Finishing (Tiang)


Tiang Depan 0.60 0.75 2.35 1.00 8.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 12.69
Tiang Samping 1.00 2.58 1.20 2.00 1.00 m2 6.19
m2 18.88

7 Pas. Batu Alam Andesit Stick + Finishing (Dinding)


1.00 0.40 3.70 5.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 7.40
m2 7.40

8 Pek. Rabat Beton (t=10 cm), K-175


46.48 0.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 4.65
m3 4.65

9 Pek. Plesteran Rabat, Adk. 1:4


46.48 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 46.48
m2 46.48

10 Pas. Granit 60 x 60 cm Meja Beton


Pantry 0.70 1.00 1.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.12
Meja Wastafel 0.70 1.00 1.60 1.00 1.00 m2 1.12
m2 2.24

VIII PEKERJAAN KUSEN, PINTU, DAN JENDELA

1 Pek. Daun Pintu Kaca Tempered 12 mm Frameless + Accessories (PF)


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef unit 1.00
unit 1.00

2 Pas. Kaca Tempered 10 mm + Rangka Canal U Allumunium (PF)


0.78 2.22 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 3.46
m2 3.46

3 Pek. Pintu P1 (Kusen Allumunium 4" + Daun Pintu Multiplek)


Finishing Melamine
1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 3.00
bh 3.00
4 Pek. Pintu P2 (Kusen Allumunium 4" + Daun Pintu Multiplek)
Finishing Melamine
1.00 1.00 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef bh -
bh -

5 Pek. Jendela J2 (Kusen Allumunium 4" + Kaca Bening 5 mm)


1.00 1.00 1.00 8.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00

6 Pek. Jendela J3 (Kusen Allumunium 4" + Kaca Bening 5 mm)


1.00 1.00 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef bh -
bh -

7 Pek. Jendela J4 (Kusen Allumunium 4" + Kaca One Way Blue 5 mm)
1.00 1.00 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 4.00
bh 4.00

8 Pas. Pintu PVC, Ex. SE Platinum (P3)


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

9 Pek. Boven BV (Kusen Allumunium 4"


+ Kisi-kisi Allumunium & Kaca Bening 5 mm)
1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

10 Pek. Pintu Rangka Besi Hollow + Besi Beugel + Finishing Cat


Pb 2.35 2.20 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef m2 -
m2 -

11 Pas. Roster Keramik, uk. 20 x 20 cm


Gb1 0.80 1.00 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef m2 -
Rt 1.80 1.20 1.00 - 1.00 m2 -
m2 -

12 Pas. Glass Block, uk. 20 x 20 cm


Gb 0.80 0.80 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef m2 -
Gb1 0.80 0.80 1.00 - 1.00 m2 -
m2 -

IX PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pas. Kunci Pintu Tanam (1set/daun)


P1 1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef set 3.00
set 3.00

2 Pas. Kunci Pintu Body Pelor (1set/daun)


P2 1.00 1.00 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef set -
set -

3 Pas. Grendel Pintu Tanam (1set/daun)


P2 1.00 1.00 1.00 - 1.00 (B1 + B2) x H x L x Nos x Koef set -
set -

4 Pas. Door Holder (2bh/daun)


P2 1.00 1.00 1.00 - 2.00 (B1 + B2) x H x L x Nos x Koef bh -
bh -

5 Pas. Door Stop (1bh/daun)


P1 1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 3.00
P2 1.00 1.00 1.00 - 2.00 bh -
bh 3.00

6 Pas. Engsel Pintu (3 bh/daun)


P1 3.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 9.00
P2 3.00 1.00 1.00 - 2.00 bh -
bh 9.00

7 Pas. Engsel Jendela Casement (2 bh/daun)


J2 2.00 1.00 1.00 8.00 2.00 (B1 + B2) x H x L x Nos x Koef bh 32.00
J3 2.00 1.00 1.00 - 3.00 bh -
J4 2.00 1.00 1.00 4.00 4.00 bh 32.00
bh 64.00
8 Pas. Grendel Jendela Allumunium (1 bh/daun)
J2 1.00 1.00 1.00 8.00 2.00 (B1 + B2) x H x L x Nos x Koef bh 16.00
J3 1.00 1.00 1.00 - 3.00 bh -
J4 1.00 1.00 1.00 4.00 4.00 bh 16.00
bh 32.00

X PEKERJAAN PLUMBING DAN SANITAIR

1 Instalasi Pipa Air Bersih, PVC 3/4" AW


1.00 1.00 80.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 80.00
m' 80.00

2 Instalasi Pipa Air Kotor, PVC 3" AW


1.00 1.00 14.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 14.00
m' 14.00

3 Instalasi Pipa Air Kotoran, PVC 4" AW


1.00 1.00 30.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 30.00
m' 30.00

4 Instalasi Pipa Air Hujan, PVC 3" AW


1.00 1.00 5.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 10.00
m' 10.00

5 Pas. Kloset Duduk Monoblock + Accessories


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

6 Pas. Kloset Jongkok Keramik


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

7 Pas. Floor Drain Stainless


1.00 1.00 1.00 5.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 5.00
bh 5.00

8 Pas. Kran Air KM


1.00 1.00 1.00 5.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 5.00
bh 5.00

9 Pas. Kran Air PVC


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

10 Pas. Wastafel + Accessories


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

11 Pas. Kran Air Wastafel


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

12 Pas. Kitchen Sink


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

13 Pas. Kran Air Angsa


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

14 Pas. Roof Drain Stainless


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

15 Pembuatan Septic Tank + Sumur Resapan


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef unit 1.00
unit 1.00

XI PEKERJAAN ELEKTRIKAL

1 Pek. Titik Intalasi Listrik


1.00 1.00 1.00 63.00 1.00 (B1 + B2) x H x L x Nos x Koef titik 63.00
titik 63.00
2 Pas. Downlight LED Standar 9 Watt
Dalam 1.00 1.00 1.00 23.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 23.00
Luar 1.00 1.00 1.00 7.00 1.00 bh 7.00
bh 30.00

3 Pas. Saklar Single


1.00 1.00 1.00 14.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 14.00
bh 14.00

4 Pas. Saklar Double


1.00 1.00 1.00 7.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 7.00
bh 7.00

5 Pas. Stop Kontak


1.00 1.00 1.00 29.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 29.00
bh 29.00

6 Pas. Exhaust Fan


1.00 1.00 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 4.00
bh 4.00

7 Box Zekering 2 Group + Instalasi


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

XII PEKERJAAN PENGECATAN

1 Pengerokan Cat Dinding Lama


Dalam 835.01 1.00 1.00 1.00 0.60 (B1 + B2) x H x L x Nos x Koef m2 501.00
Luar 228.24 1.00 1.00 1.00 0.60 m2 136.95
m2 637.95

2 Pengecatan Dinding Bagian Dalam (Cat Interior)


1.00 3.50 295.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1,034.60
Opening 0.15 1.00 125.11 1.00 1.00 m2 18.77
- Dikurangi
PF 2.85 2.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 (5.99)
P1 2.85 2.10 1.00 3.00 2.00 m2 (35.91)
P2 2.85 2.10 1.00 - 1.00 m2 -
J2 2.85 2.10 1.00 8.00 1.00 m2 (47.88)
J3 2.85 2.10 1.00 - 1.00 m2 -
J4 2.85 2.10 1.00 4.00 1.00 m2 (23.94)
P3 2.85 2.10 1.00 1.00 2.00 m2 (11.97)
BV 2.85 2.10 1.00 1.00 1.00 m2 (5.99)
Pb 2.85 2.10 1.00 - 1.00 m2 -
Gb 0.80 0.80 1.00 2.00 1.00 m2 (1.28)
Gb1 0.80 0.80 1.00 1.00 1.00 m2 (0.64)
Dinding Keramik KM/WC 84.77 1.00 1.00 1.00 1.00 m2 (84.77)
m2 835.01

3 Pengecatan Dinding Bagian Luar (Cat Exterior)


1.00 3.40 78.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 267.24
Kolom dan Kanopi 29.71 1.00 1.00 1.00 1.00 m2 29.71
Profil Kolom 0.20 1.00 3.00 2.00 1.00 m2 1.20
Profil Listplank 0.60 1.00 11.50 1.00 1.00 m2 6.90
Listplank GRC 0.20 1.00 81.50 1.00 1.00 m2 16.30
- Dikurangi
PF 2.85 2.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 (5.99)
P2 2.85 2.10 1.00 - 1.00 m2 -
J2 2.85 2.10 1.00 8.00 1.00 m2 (47.88)
J3 2.85 2.10 1.00 - 1.00 m2 -
J4 2.85 2.10 1.00 4.00 1.00 m2 (23.94)
BV 2.85 2.10 1.00 1.00 1.00 m2 (5.99)
Pb 2.85 2.10 1.00 - 1.00 m2 -
Gb 0.80 0.80 1.00 2.00 1.00 m2 (1.28)
Gb1 0.80 0.80 1.00 1.00 1.00 m2 (0.64)
Batu Alam 7.40 1.00 1.00 1.00 1.00 m2 (7.40)
m2 228.24
C REHABILITASI AULA

I PEKERJAAN BONGKARAN

1 Pek. Bongkaran Tiang/Kolom


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

2 Pek. Bongkaran Dinding Bata


1.00 1.35 8.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 11.48
m2 11.48

3 Pek. Bongkaran Keramik Lantai dan Dinding


Lantai 7.00 1.00 7.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 49.00
m2 49.00

4 Pek. Bongkaran Atap dan Kuda-kuda


8.75 5.20 1.00 4.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 91.00
m2 91.00

5 Membuang/Memindahkan Bongkaran
1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

II PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian Tanah


Pondasi Batu Belah 0.60 0.90 0.65 21.50 1.00 0.50 (B1 + B2) x H x L x Nos x Koef m3 10.48
Pondasi Umpak 0.60 0.65 0.60 2.00 1.00 m3 0.47
Selokan 0.45 0.30 50.00 1.00 1.00 m3 6.75
m3 17.70

2 Pek. Urugan Pasir di Bawah Pondasi


Pondasi Batu Belah 0.60 0.05 21.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.65
Pondasi Umpak 0.60 0.05 0.60 2.00 1.00 m3 0.04
m3 0.68

3 Pas. Pondasi Batu Belah, Adk. 1:4


Pondasi Batu Belah 0.30 0.60 0.60 21.50 1.00 0.50 (B1 + B2) x H x L x Nos x Koef m3 5.81
Pondasi Umpak 0.30 0.60 0.60 0.60 2.00 0.50 m3 0.32
m3 6.13

4 Pek. Urugan Kembali Galian


= 1/3 x Vol Galian m3 5.90
m3 5.90

5 Pek. Urugan Tanah Peninggian Lantai


31.50 0.30 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 9.45
m3 9.45

6 Pemadatan Tanah Urug


9.45 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 9.45
m3 9.45

III PEKERJAAN BETON

1 Pek. Sloof (15/20)


- Beton, K-175 0.15 0.20 14.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.42
- Pembesian 0.15 0.20 14.00 1.00 131.00 kg 55.02
- Begisting 0.40 1.00 14.00 1.00 1.00 m2 5.60

2 Pek. Kolom KS (25/25)


- Beton, K-175 0.25 4.00 0.25 8.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 2.00
- Pembesian 0.25 4.20 0.25 8.00 122.00 kg 256.20
- Begisting 1.00 4.00 1.00 8.00 1.00 m2 32.00

3 Pek. Ring Balok RB (15/20)


- Beton, K-175 0.15 0.20 27.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.83
- Pembesian 0.15 0.20 27.50 1.00 131.00 kg 108.08
- Begisting 0.55 1.00 27.50 1.00 1.00 m2 15.13
4 Pek. Balok Latai (15/20)
- Beton, K-175 0.15 0.20 12.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.36
- Pembesian 0.15 0.20 12.00 1.00 131.00 kg 47.16
- Begisting 0.30 1.00 12.00 1.00 1.00 m2 3.60

IV PEKERJAAN PASANGAN

1 Pas. Bata, Adk. 1:4


1.00 1.35 12.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 16.20
Selokan 1.00 0.80 50.00 1.00 1.00 m2 40.00
0.10 0.75 1.00 5.00 1.00 m2 0.38
m2 56.58

2 Pek. Plesteran Dinding, Adk. 1:4


= Pas. Bata 16.20 1.00 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 32.40
0.15 1.00 12.00 1.00 1.00 m2 1.80
0.10 0.75 1.00 5.00 2.00 m2 0.75
m2 34.95

3 Pek. Acian Dinding


34.95 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 34.95
m2 34.95

4 Pek. Perapihan Opening Dinding


D1 1.00 1.00 1.80 2.00 5.00 (B1 + B2) x H x L x Nos x Koef m' 18.00
D2 1.00 1.00 1.80 2.00 3.00 m' 10.80
m' 28.80

5 Pek. Finishing Expose Kolom


Ks1 1.00 1.00 4.00 6.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 24.00
1.00 1.00 1.40 2.00 1.00 m2 2.80
m2 26.80

6 Pek. Penebalan Kolom Bundar Menjadi Persegi


Ks2 1.00 1.00 1.00 8.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00

7 Pek. Profil Semen Kolom


Ks1 1.00 1.00 1.50 2.00 2.00 (B1 + B2) x H x L x Nos x Koef m' 6.00
m' 6.00

8 Pek. Profil Semen Ornamen Siger


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

9 Pek. Plesteran Selokan Air Hujan (t=15 mm), Adk. 1:3


1.20 1.00 50.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 60.00
m2 60.00

10 Pek. Acian Selokan Air Hujan


1.20 1.00 50.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 60.00
m2 60.00

V PEKERJAAN ATAP

1 Pek. Kuda-kuda Baja Ringan - SNI


12.25 3.50 1.00 5.10 2.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 80.33
2.00 1.00 4.00 2.00 1.00 m2 16.00
8.75 1.00 5.10 1.00 0.50 m2 22.31
5.00 1.00 2.90 1.00 0.50 m2 7.25
2.50 1.00 2.90 2.00 1.00 m2 14.50
3.00 4.88 1.00 2.20 2.00 0.50 m2 17.33
m2 157.71

2 Pas. Genteng Aspal, Ex. Onduvilla


= V kuda-kuda m2 157.71
m2 157.71

3 Pas. Allumunium Foil (Double Side)


= V Atap m2 157.71
m2 157.71
4 Pas. Nok Genteng Aspal
1.00 1.00 45.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 45.60
m' 45.60

5 Pas. Talang Zincalume


1.00 1.00 13.80 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 13.80
m' 13.80

6 Pas. Listplank GRC


1.00 1.00 45.75 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 45.75
m' 45.75

VI PEKERJAAN PLAFOND

1 Pek. Plafond PVC + Rangka Hollow Galvanis (Motif Lampung) - Flat


Dalam 84.40 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 84.40
Tritisan 33.30 1.00 1.00 1.00 1.00 m2 33.30
Selasar Penghubung 11.25 1.00 1.00 1.00 1.00 m2 11.25
m2 128.95

2 Pek. List Plafond PVC


Dalam 1.00 1.00 42.30 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 42.30
Tritisan 1.00 1.00 42.30 1.00 1.00 m' 42.30
Selasar Penghubung 1.00 1.00 6.00 1.00 1.00 m' 6.00
m' 90.60

VII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pek. Urugan Pasir di Bawah Lantai (t=5 cm)


31.50 0.05 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.58
m3 1.58

2 Pas. Lantai Granit 60 x 60 cm (Polished)


79.40 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 79.40
m2 79.40

3 Pas. Plint Lantai Granit 10 x 60 cm


1.00 1.00 32.30 1.00 0.70 (B1 + B2) x H x L x Nos x Koef m' 22.61
m' 22.61

4 Pas. Batu Alam Andesit (20/40) + Finishing (Tiang)


Ks1 1.20 2.60 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 6.24
m2 6.24

5 Pek. Rabat Beton (t=10 cm), K-175


Rabat Keliling Bangunan 33.30 0.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 3.33
Selasar Penghubung 2.00 0.10 3.00 1.00 1.00 m3 0.60
m3 3.93

6 Pek. Plesteran Rabat, Adk. 1:4


Rabat Keliling Bangunan 33.30 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 33.30
Selasar Penghubung 2.00 1.00 3.00 1.00 1.00 m2 6.00
m2 39.30

VIII PEKERJAAN ELEKTRIKAL

1 Pek. Titik Intalasi Listrik


1.00 1.00 1.00 5.00 1.00 (B1 + B2) x H x L x Nos x Koef titik 5.00
titik 5.00

2 Pas. Downlight LED Standar 9 Watt


Dalam 1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 3.00
bh 3.00

3 Pas. Saklar Double


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

4 Pas. Stop Kontak


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00
IX PEKERJAAN PENGECATAN

1 Pengerokan Cat Dinding Lama


1.00 1.35 15.50 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 41.85
m2 41.85

2 Pengecatan Dinding (Cat Exterior)


1.00 1.35 27.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 37.13
0.15 1.00 27.50 1.00 1.00 m2 4.13
Opening 0.15 1.00 28.80 1.00 1.00 m2 4.32
Kolom 1.00 3.60 12.00 1.00 1.00 m2 43.20
Kolom 1.00 1.00 2.00 1.00 1.00 m2 2.00
Listplank GRC 0.20 1.00 45.75 1.00 1.00 m2 9.15
m2 99.92

D REHABILITASI RUMAH DINAS CAMAT

I PEKERJAAN BONGKARAN

1 Pek. Bongkaran Keramik Lantai dan Dinding


Lantai 81.70 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 81.70
KM/WC 6.10 1.00 1.00 1.00 1.00 m2 6.10
Dinding KM/WC 1.00 2.50 12.70 1.00 1.00 m2 31.75
m2 119.55

2 Pek. Bongkaran Kloset dan Bak Air KM/WC


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

3 Pek. Bongkaran Kusen Pintu dan Jendela


1.00 1.00 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 4.00
bh 4.00

4 Pek. Bongkaran Pintu Garasi


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

5 Pek. Bongkaran Dinding Bata


0.80 2.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.68
1.00 0.70 3.50 1.00 0.50 m2 -
1.00 0.30 1.50 1.00 0.50 m2 -
1.00 3.00 5.50 1.00 1.00 m2 16.50
GR 1.00 0.40 2.00 2.00 1.00 m2 1.60
Sopi-sopi 1.00 1.20 4.00 1.00 0.50 m2 2.40
m2 22.18

6 Pek. Bongkaran Plafond


Dalam 86.80 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 86.80
Tritisan 37.90 1.00 1.00 1.00 1.00 m2 37.90
m2 124.70

7 Pek. Bongkaran Atap dan Kuda-kuda


2.08 4.65 3.00 1.00 2.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 20.19
12.65 4.50 4.71 1.00 2.00 0.50 m2 80.78
3.00 1.75 1.00 2.00 0.50 m2 5.25
3.00 3.90 1.00 2.00 1.00 m2 23.40
2.00 5.40 1.00 2.00 1.00 m2 21.60
4.65 2.70 1.00 2.00 0.50 m2 12.56
2.00 3.50 1.00 2.00 1.00 m2 14.00
m2 177.77

8 Pek. Bongkaran Atap Asbes di Garasi & Teras Belakang


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

9 Membuang/Memindahkan Bongkaran
1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

II PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian Tanah


Pondasi Umpak 0.60 0.65 0.60 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.47
m3 0.47
2 Pek. Urugan Pasir di Bawah Pondasi
Pondasi Umpak 0.60 0.05 0.60 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.04
m3 0.04

3 Pas. Pondasi Batu Belah, Adk. 1:4


Pondasi Umpak 0.30 0.60 0.60 0.60 2.00 0.50 (B1 + B2) x H x L x Nos x Koef m3 0.32
m3 0.32

4 Pek. Urugan Kembali Galian


= 1/3 x Vol Galian m3 0.16
m3 0.16

5 Pek. Urugan Tanah Peninggian Lantai


11.00 0.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.10
m3 1.10

6 Pemadatan Tanah Urug


1.10 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.10
m3 1.10

III PEKERJAAN BETON

1 Pek. Sloof (15/20)


- Beton, K-175 0.15 0.20 10.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.32
- Pembesian 0.15 0.20 10.50 1.00 131.00 kg 41.27
- Begisting 0.40 1.00 10.50 1.00 1.00 m2 4.20

2 Pek. Kolom KS1 (20/20)


- Beton, K-175 0.20 4.00 0.20 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.32
- Pembesian 0.20 4.20 0.20 2.00 136.00 kg 45.70
- Begisting 0.80 4.00 1.00 2.00 1.00 m2 6.40

3 Pek. Kolom KP (11/11)


- Beton, K-175 0.11 4.00 0.11 5.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.24
- Pembesian 0.11 4.20 0.11 5.00 240.00 kg 60.98
- Begisting 0.22 4.00 1.00 5.00 1.00 m2 4.40

4 Pek. Ring Balok RB (15/20)


- Beton, K-175 0.15 0.20 18.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.54
- Pembesian 0.15 0.20 18.00 1.00 131.00 kg 70.74
- Begisting 0.55 1.00 18.00 1.00 1.00 m2 9.90

5 Pek. Balok Latai (15/25)


- Beton, K-175 0.15 0.25 11.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.41
- Pembesian 0.15 0.25 11.00 1.00 145.00 kg 59.81
- Begisting 0.65 1.00 11.00 1.00 1.00 m2 7.15

IV PEKERJAAN PASANGAN

1 Pas. Bata, Adk. 1:4


1.00 4.00 10.50 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 42.00
0.80 2.10 1.00 1.00 1.00 m2 1.68
1.00 0.75 7.50 1.00 1.00 m2 5.63
m2 49.31

2 Pek. Plesteran Dinding, Adk. 1:4


49.31 1.00 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 98.61
m2 98.61

3 Pek. Acian Dinding


98.61 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 98.61
m2 98.61

4 Pek. Perapihan Opening Kusen Pintu


P3 0.68 1.00 2.10 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 2.86
m' 2.86

5 Pek. Finishing Expose Kolom dan Balok


Ks1 0.80 1.00 4.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 6.40
B 15/25 0.65 1.00 7.50 1.00 1.00 m2 4.88
m2 11.28
V PEKERJAAN ATAP

1 Pek. Kuda-kuda Baja Ringan - SNI


10.45 1.00 6.10 2.00 0.50 (B1 + B2) x H x L x Nos x Koef m2 63.75
1.93 1.00 4.15 2.00 1.00 m2 15.98
14.95 4.50 1.00 6.10 2.00 0.50 m2 118.65
1.50 1.00 5.65 2.00 1.00 m2 16.95
m2 215.32

2 Pas. Genteng Aspal, Ex. Onduvilla


215.32 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 215.32
m2 215.32

3 Pas. Allumunium Foil (Double Side)


= V Atap m2 215.32
m2 215.32

4 Pas. Nok Genteng Aspal


1.00 1.00 49.32 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 49.32
m' 49.32

5 Pas. Talang Zincalume


1.00 1.00 9.80 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 9.80
m' 9.80

6 Pas. Listplank GRC


1.00 1.00 57.65 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 57.65
m' 57.65

VI PEKERJAAN PLAFOND

1 Pek. Plafond PVC + Rangka Hollow Galvanis (Flat)


Dalam 87.80 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 87.80
Garasi 18.00 1.00 1.00 1.00 1.00 m2 18.00
Teras Belakang 11.00 1.00 1.00 1.00 1.00 m2 11.00
Tritisan 48.70 1.00 1.00 1.00 1.00 m2 48.70
m2 165.50

2 Pek. List Plafond PVC


Dalam 1.00 1.00 115.80 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 115.80
Garasi 1.00 1.00 17.40 1.00 1.00 m' 17.40
Teras Belakang 1.00 1.00 15.00 1.00 1.00 m' 15.00
Tritisan 1.00 1.00 50.45 1.00 1.00 m' 50.45
m' 198.65

VII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pek. Urugan Pasir di Bawah Lantai (t=5 cm)


29.00 0.05 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.45
m3 1.45

2 Pas. Lantai Granit 60 x 60 cm (Polished)


Lantai 81.70 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 81.70
m2 81.70

3 Pas. Lantai Granit 60 x 60 cm (Tekstur)


Garasi 18.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 18.00
Teras Belakang 11.00 1.00 1.00 1.00 1.00 m2 11.00
m2 29.00

4 Pas. Plint Lantai Granit 10 x 60 cm


1.00 1.00 121.45 1.00 0.80 (B1 + B2) x H x L x Nos x Koef m' 97.16
m' 97.16

5 Pas. Lantai Keramik 30 x 30 cm (Warna)


KM/WC 3.90 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 3.90
2.20 1.00 1.00 2.00 1.00 m2 4.40
m2 8.30
6 Pas. Dinding Keramik 30 x 60 cm (Warna)
KM/WC 1.00 2.50 8.40 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 21.00
1.00 2.50 5.90 1.00 1.00 m2 14.75
Pantry 1.00 2.50 5.20 1.00 1.00 m2 13.00
- dikurangi
P3 0.80 2.10 1.00 2.00 1.00 m2 (3.36)
m2 45.39

7 Pas. Batu Alam Andesit Stick + Finishing (Tiang)


1.20 0.50 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.20
m2 1.20

8 Pek. Rabat Beton (t=10 cm), K-175


48.70 0.10 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 4.87
m3 4.87

9 Pek. Plesteran Rabat, Adk. 1:4


48.70 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 48.70
m2 48.70

10 Pas. Granit 60 x 60 cm Meja Beton


Pantry 0.70 1.00 3.85 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 2.70
m2 2.70

VIII PEKERJAAN KUSEN, PINTU, DAN JENDELA

1 Pek. Kusen Pintu dan Jendela, Kayu Kelas II


P1 0.06 0.12 5.10 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.04
J2 0.06 0.12 8.00 1.00 1.00 m3 0.06
m3 0.10

2 Pek. Daun Pintu Panel, Kayu Kelas II


P1 0.80 2.05 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.64
m2 1.64

3 Pek. Daun Jendela Kaca, Kayu Kelas II


J2 0.73 1.50 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 2.19
m2 2.19

4 Pas. Kaca Jendela, Kaca Bening 5 mm


J2 0.61 1.38 1.00 1.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 1.68
m2 1.68

5 Pas. Pintu Folding Gate, t=0,5 mm (FG)


3.20 2.35 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 7.52
m2 7.52

6 Pas. Roster Keramik, uk. 20 x 20 cm


2.00 0.20 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.60
m2 1.60

7 Pas. Glass Block, uk. 20 x 20 cm


2.00 0.20 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.60
m2 1.60

8 Pas. Pintu PVC, Ex. SE Platinum (P3)


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

IX PEKERJAAN KUNCI DAN PENGGANTUNG

1 Pas. Kunci Pintu Tanam (1set/daun)


P1 1.00 1.00 1.00 8.00 1.00 (B1 + B2) x H x L x Nos x Koef set 8.00
set 8.00

2 Pas. Door Stop (1bh/daun)


P1 1.00 1.00 1.00 8.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00

3 Pas. Engsel Pintu (3 bh/daun)


P1 3.00 1.00 1.00 8.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 24.00
bh 24.00
4 Pas. Grendel Jendela (1 bh/daun)
J1 1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 3.00
J2 1.00 1.00 1.00 6.00 2.00 bh 12.00
bh 15.00

5 Pas. Tarikan Jendela (1 bh/daun)


J1 1.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 3.00
J2 1.00 1.00 1.00 6.00 2.00 bh 12.00
bh 15.00

6 Pas. Hak Angin Jendela (2 bh/daun)


J1 2.00 1.00 1.00 3.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 6.00
J2 2.00 1.00 1.00 6.00 2.00 bh 24.00
bh 30.00

X PEKERJAAN PLUMBING DAN SANITAIR

1 Perbaikan Jaringan Air Kotor Pantry


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

2 Pas. Kloset Duduk Monoblock + Accessories


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

3 Pas. Kloset Jongkok Keramik


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

4 Pas. Floor Drain Stainless


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

5 Pas. Kran Air KM


1.00 1.00 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 2.00
bh 2.00

6 Pas. Kitchen Sink


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

7 Pas. Kran Air Angsa


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 1.00
bh 1.00

XI PEKERJAAN ELEKTRIKAL

1 Pek. Titik Intalasi Listrik


1.00 1.00 1.00 26.00 1.00 (B1 + B2) x H x L x Nos x Koef titik 26.00
titik 26.00

2 Pas. Downlight LED Standar 9 Watt


1.00 1.00 1.00 15.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 15.00
bh 15.00

3 Pas. Saklar Single


1.00 1.00 1.00 6.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 6.00
bh 6.00

4 Pas. Saklar Double


1.00 1.00 1.00 4.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 4.00
bh 4.00

5 Pas. Stop Kontak


1.00 1.00 1.00 11.00 1.00 (B1 + B2) x H x L x Nos x Koef bh 11.00
bh 11.00

XII PEKERJAAN PENGECATAN

1 Pengerokan Cat Dinding Lama


Dalam 324.80 1.00 1.00 1.00 0.60 (B1 + B2) x H x L x Nos x Koef m2 194.88
Luar 186.72 1.00 1.00 1.00 0.60 m2 112.03
m2 306.91
2 Pengecatan Dinding Bagian Dalam (Cat Interior)
1.00 3.40 128.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 437.24
- Dikurangi
P1 0.90 2.10 1.00 6.00 2.00 (B1 + B2) x H x L x Nos x Koef m2 (22.68)
0.90 2.10 1.00 2.00 1.00 m2 (3.78)
J1 0.85 1.60 1.00 1.00 2.00 m2 (2.72)
0.85 1.60 1.00 2.00 1.00 m2 (2.72)
J2 1.60 1.60 1.00 1.00 2.00 m2 (5.12)
1.60 1.60 1.00 5.00 1.00 m2 (12.80)
FG 3.20 2.35 1.00 1.00 1.00 m2 (7.52)
GR 2.00 0.40 1.00 1.00 2.00 m2 (1.60)
2.00 0.40 1.00 3.00 1.00 m2 (2.40)
P3 0.68 2.10 1.00 2.00 2.00 m2 (5.71)
Dinding Keramik KM/WC 45.39 1.00 1.00 1.00 1.00 m2 (45.39)
m2 324.80

3 Pengecatan Dinding Bagian Luar (Cat Exterior)


1.00 3.80 46.60 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 177.08
1.00 0.75 7.50 1.00 2.00 m2 11.25
Expose Kolom dan Balok 11.28 1.00 1.00 1.00 1.00 m2 11.28
Tiang Teras Depan 1.20 1.00 2.00 2.00 1.00 m2 4.80
Listplank GRC 0.20 1.00 57.65 1.00 1.00 m2 11.53
- Dikurangi
P1 0.90 2.10 1.00 2.00 1.00 m2 (3.78)
J1 0.85 1.60 1.00 2.00 1.00 m2 (2.72)
J2 1.60 1.60 1.00 5.00 1.00 m2 (12.80)
FG 3.20 2.35 1.00 1.00 1.00 m2 (7.52)
GR 2.00 0.40 1.00 3.00 1.00 m2 (2.40)
m2 186.72

4 Pengecatan Kusen, Pintu, dan Jendela (Baru)


Kusen P1 0.36 1.00 5.10 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 1.84
J2 0.36 1.00 8.00 1.00 1.00 m2 2.88
DP P1 0.80 2.05 1.00 1.00 2.00 m2 3.28
DJ J2 0.16 1.00 4.46 1.00 2.00 m2 1.43
0.10 1.00 2.57 1.00 2.00 m2 0.51
m2 9.94

5 Pengecatan Kusen, Pintu, dan Jendela (Pemeliharaan)


Kusen P1 0.36 1.00 5.10 7.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 12.85
J1 0.24 1.00 4.90 3.00 1.00 m2 3.53
J2 0.36 1.00 8.00 5.00 1.00 m2 14.40
BV 0.24 1.00 2.40 2.00 1.00 m2 1.15
DP P1 0.80 2.05 1.00 7.00 2.00 m2 22.96
DJ J1 0.16 1.00 4.46 3.00 1.00 m2 2.14
0.10 1.00 2.57 3.00 1.00 m2 0.77
J2 0.16 1.00 4.46 5.00 2.00 m2 7.14
0.10 1.00 2.57 5.00 2.00 m2 2.57
J1 0.16 1.00 4.46 3.00 2.00 m2 4.28
Roster Kayu 0.25 0.30 1.00 29.00 2.00 m2 4.35
m2 76.14

E PEMBUATAN AUNING PARKIR

I PEKERJAAN BONGKARAN

1 Pek. Bongkaran Auning Parkir Existing


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

2 Membuang/Memindahkan Bongkaran
1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

II PEKERJAAN TANAH DAN PONDASI

1 Pek. Galian Tanah


Pondasi Umpak 0.60 0.65 0.60 8.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.87
m3 1.87

2 Pek. Urugan Pasir di Bawah Pondasi


Pondasi Umpak 0.60 0.05 0.60 8.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.14
m3 0.14
3 Pas. Pondasi Batu Belah, Adk. 1:4
Pondasi Umpak 0.30 0.60 0.60 0.60 8.00 0.50 (B1 + B2) x H x L x Nos x Koef m3 1.30
m3 1.30

4 Pek. Urugan Kembali Galian


= 1/3 x Vol Galian m3 0.62
m3 0.62

5 Pek. Urugan Tanah Peninggian Lantai


9.00 0.10 5.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 4.50
m3 4.50

6 Pemadatan Tanah Urug


4.50 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 4.50
m3 4.50

III PEKERJAAN PASANGAN DAN BETON

1 Pek. Sloof (15/20)


- Beton, K-175 0.15 0.20 28.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.84
- Pembesian 0.15 0.20 28.00 1.00 131.00 kg 110.04
- Begisting 0.40 1.00 28.00 1.00 1.00 m2 11.20

2 Pek. Kolom KS1 (20/20)


- Beton, K-175 0.20 2.80 0.20 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.22
- Pembesian 0.20 3.00 0.20 2.00 136.00 kg 32.64
- Begisting 0.80 2.80 1.00 2.00 1.00 m2 4.48

- Beton, K-175 0.20 3.25 0.20 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.26
- Pembesian 0.20 3.45 0.20 2.00 136.00 kg 37.54
- Begisting 0.80 3.25 1.00 2.00 1.00 m2 5.20

3 Pek. Balok (15/25)


- Beton, K-175 0.15 0.25 38.40 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.44
- Pembesian 0.15 0.25 38.40 1.00 145.00 kg 208.80
- Begisting 0.65 1.00 38.40 1.00 1.00 m2 24.96

4 Pek. Finishing Expose Kolom dan Balok


0.80 2.80 1.00 2.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 4.48
0.80 3.25 1.00 2.00 1.00 m2 5.20
0.80 1.00 38.40 1.00 1.00 m2 30.72
m2 40.40

5 Pek. Lantai Beton (t=10 cm), K-175


5.00 0.10 9.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 4.50
Ramp 0.50 0.10 5.00 1.00 0.50 m3 0.13
m3 4.63

V PEKERJAAN ATAP

1 Pek. Kuda-kuda Baja Ringan - SNI


6.00 1.00 10.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 60.00
m2 60.00

2 Pas. Atap Spandek (t=0,30 mm) - SNI


6.00 1.00 10.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 60.00
m2 60.00

3 Pas. Lisplank GRC


1.00 1.00 32.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m' 32.00
m' 32.00

VI PEKERJAAN PENGECATAN

1 Pengecatan Kolom dan Balok (Cat Exterior)


40.40 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 40.40
m2 40.40
F PEKERJAAN LAIN-LAIN

1 Pembersihan Sisa Material, dll.


1.00 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef ls 1.00
ls 1.00

###
###

###
###