EQUIPMENT SCHEDULE FOR MAIN LV ISOLATION TRANSFORMER CONTRACT DRAWING

OUTPUT INPUT RATING EFFICIENCY


DESIGNATION LEVEL LOCATION QUANTITY %Z IMPEDENCE REMARKS
KVA VOLTAGE VOLTAGE %
ISOLTX LEVEL 1 IN PDU, DATA HALL 12 250 400 400 6 99 Dzno, K13 (PHASE 1)

ISOLTX LEVEL 1 IN PDU, DATA HALL 12 250 400 400 6 99 Dzno, K13 (PHASE 2)

ISOLTX LEVEL 1 IN PDU, DATA HALL 24 250 400 400 6 99 Dzno, K13 (PHASE 3)

ISOLTX LEVEL 1 SWITCHROOM 2 200 400 400 6 99 Dzno, K13 (PHASE 2)


IN PDU DATA HALL Dzno, K13 (PHASE 2)
ISOLTX LEVEL 1 6 250 400 400 6 99
1&2
ISOLTX LEVEL 1 IN SUITE A & B 2 100 400 400 6 99 Dzno, K13 (PHASE 2)

CONTRACT DRAWING
EQUIPMENT / SPECIFICATION FOR LV GENERATOR (BY OTHERS)
RATING OUTPUT CONNECTED LOAD
DESIGNATION LEVEL LOCATION REMARKS
KVA KW VOLTAGE FREQUENCY KW PF THDi %

G-A-1 LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 1)
CONTRACT DRAWING 06/2021 WC

G-B-1 LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 1) T1 ISSUED FOR TENDER 08/2020 LBK

Rev Description Date By


OWNER :
G-C-1 LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 1)
PT.INDOKEPPEL DATACENTER JKT

JUNE 2021
G-AC-A1 LEVEL 2 ROOF 2500 2000 400 50 1960 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 1) Indofood Tower, Sudirman Plaza LT.12
Jl. Jend. Sudirman Kav 76-78
Jakarta Selatan, Indonesia 12910
G-AC-B1 LEVEL 2 ROOF 2500 2000 400 50 1960 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 1)
LEAD & DATA CENTRE CONSULTANT :

J1-01-GEN-IT-01D LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 3)

J1-01-GEN-IT-01E LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 3)

J1-01-GEN-IT-01F LEVEL 2 ROOF 2000 1600 400 50 1529 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 3) PT. DSCO Indonesia
Kencana Tower, Level 2,
Business Park Kebon Jeruk,
J1-01-GEN-02A LEVEL 2 ROOF 1500 1200 400 50 969 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 2) Jl Raya Meruya llir
No.88 Jakarta Barat 11620, Indonesia.
TEL : +62 21 2949 0611 FAX: +62 21 2949 0612
J1-01-GEN-02B LEVEL 2 ROOF 1500 1200 400 50 969 1 7 CONTINUOUS RATING, 75dBA @1M (PHASE 2)
ARCHITECTURAL CONSULTANT :

EQUIPMENT SCHEDULE FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEM [BASE] (BY OTHERS)
architects
OUTPUT RATING INPUT RATING BATTERY AUTONOMY EFFICIENCY planning consultants
development consultants
DESIGNATION LOCATION QUANTITY INPUT POWER FACTOR REMARKS AWP PTE LTD
143 Cecil Street #12-00 GB Building
KVA KW V V THDi (FL) %LOAD MINUTES % (MIN) Singapore 069542 Tel:+65-63376777 FAX:+65-63396956
WEBSITE: w w w .a w p a r c h i t e c t s. com
E-MAIL: a w p 1 8 0 6 3 1 @ a w p a r c h i t e c t s. com
COMPANY REGISTRATION No : 1 9 9 4 0 0 8 9 8 R
UPS-A-1 LEVEL 1 (GL FG 34) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 1
CIVIL & STRUCTURAL CONSULTANT :

UPS-B-1 LEVEL 1 (GL FG 45) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 1
PT. BIMATEKNO KARYATAMA KONSULTAN
UPS-C-1 LEVEL 1 (GL FG 78) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 1
Level 2, Graha Mustika Ratu Centre Jl Jend Gatot
Subroto Kav 74-75, Jakarta Selatan 12870 Telepon :
UPS-LL-A LEVEL 1 (EF FG 12) 1 200 180 400 400 5 100 10 95 0.99 LAG PHASE 1 +62 21 830 7403, Fax : +62 21 830 6565

LEVEL 1 (GL EF 1213) MECHANICAL & ELECTRICAL CONSULTANT :


UPS-LL-B 1 200 180 400 400 5 100 10 95 0.99 LAG PHASE 1

J1-01-UPS-IT-02A LEVEL 1 (GL EF 34) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3
Office : Kompleks Ruko Central Green Ville No. 2V-2W
J1-01-UPS-IT-02B LEVEL 1 (GL EF 45) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3 Jl. Tanjung Duren Barat No.2, Jakarta 11510-Indonesia
Telp. : (021) 5689345 (Hunting) Fax. : (021) 5657527, Email :engineering@pt-asdi.com

J1-01-UPS-IT-02C LEVEL 1 (GL EF 78) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3 QUANTITY SURVEYOR :

J1-01-UPS-IT-01D LEVEL 1 (GL FG 1314) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3
TURNER & TOWNSEND PTE LTD
WORLD TRADE CENTRE 5, 6TH FLOOR
J1-01-UPS-IT-01E LEVEL 1 (GL FG 1617) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3 JL. JEND SUDIRMAN KAV 29 - 31, JAKARTA
TEL: +62 (21) 251 1331

J1-01-UPS-IT-01F LEVEL 1 (GL FG 1718) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 3 ARCHITECT:

UPS-D-2 LEVEL 1 (GL EF 1314) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 2

UPS-E-2 LEVEL 1 (GL EF 1617) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 2
PTI ARCHITECTS
JALAN THAMRIN BOULEVARD 3C - 3D
UPS-F-2 LEVEL 1 (GL 1718) 1 800 720 400 400 5 100 10 95 0.99 LAG PHASE 2 JAKARTA 10240 (EX JL. KEBON KACANG RAYA)
TEL: (62 - 21) 21232325, FAX: (62 - 21) 21232325
E-MAIL: p t i @ p t i - a r c h i t e c t s . c o m

EQUIPMENT SCHEDULE FOR 20KV TRANSFORMER


Project:

OUTPUT INPUT RATING MIN EFF. PHASE 3 FOR INDOKEPPEL DATACENTER


DESIGNATION LEVEL LOCATION QUANTITY %Z IMPENDENCE REMARKS JKT - PROPOSED SINGLE STOREY DATA
CENTRE AND SECOND STOREY OFFICE WITH
KVA VOLTAGE VOLTAGE % UNDERGROUND FUEL STORAGE TANKS AT
TX-A1 1 TRANSFORMER ROOM (BASE) 1 3000 400 22000 7.00% 99 OIL TYPE (PHASE 1) SUKAHATI, CITEUREUP, BOGOR INDONESIA

TX-B1 1 TRANSFORMER ROOM (BASE) 1 3000 400 22000 7.00% 99 OIL TYPE (PHASE 1) Title:

1 1 2000 400 22000 7.00% 99


TX-A-1 TRANSFORMER ROOM (IT LOAD - A SIDE) OIL TYPE (PHASE 1)

1 1 2000 400 22000 7.00% 99 EQUIPMENT SCHEDULE


TX-B-1 TRANSFORMER ROOM (IT LOAD - A SIDE) OIL TYPE (PHASE 1)

1 1 2000 400 22000 7.00% 99


TX-C-1 TRANSFORMER ROOM (IT LOAD - A SIDE) OIL TYPE (PHASE 1) Project no: Cad Drawing no.
1223 1223E-102
Designed Drawn 3021/1223/ E/102
1 1 2000 400 22000 7.00% 99
J1/01/TX/01D TRANSFORMER ROOM (IT LOAD - B SIDE) OIL TYPE (PHASE 3) LBK SNBN
T1
rev.

Checked Approved Scale Date


1 1 2000 400 22000 7.00% 99 LBK LBK N.T.S JULY 2020
J1/01/TX/01E TRANSFORMER ROOM (IT LOAD - B SIDE) OIL TYPE (PHASE 3)

1 1 2000 400 22000 7.00% 99


J1/01/TX/01F TRANSFORMER ROOM (IT LOAD - B SIDE) OIL TYPE (PHASE 3)