BOREHOLE 6 PROJECT ELECTRICAL INSTALLATION

pump switchgear

Generator seat

SWITCH ROOM

ORIGINAL GROUND LEVEL

FLOOR PLAN

REVISION No DATE DESCRIPTION

CLIENT
MDB BREAKERS LAYOUT LEGEND FOR SYMBOLS ANRS WATER ,IRRIGATION AND ENERGY BUREAU

CIRCUT BREAKER WIRE SYMBOL DESCRIPTION


LOAD PHASE
TYPE P(Kw) SIZE SIZE 2XTLD58W FITTING TCS058/1.58
NO
MDB (AMP) (MM2)
R S T
1XTLD58W FITTING TCS058/1.58

SUBMERS. PUMP SINGLE POLE SWITCH


1 55 80 3X25
TWO WAY SWITCH
2 Lighting-1 0.08 10 3X2.5 PROJECT
SOCKET OUT LET-NORMAL 2P+E WATER SUPPLY PROJECT
3 Lighting-2 0.14 10 3X2.5
MTS SOCKET OUT LET-3 PHASE 3P+E TITLE FOR BH#5 and 3 ELECTRICAL INSTALLETION DRAWING
EEPCO LINE 4 Normalsocket 1.6 16 3X2.5 MDB/SDB
3x25+16 125A 5 Guard DESIGNED: Bekele T. CHECKED:
EM House 0.3 10 INCANDESCENT FITTING ,60W
50 KVA External DRAWN: APPROVED:
3x25+16 6 Lighting 0.5 16 EEPCO METER
TRANSFORMER SCALE: as shown DATE: MAR.2020

7 SPARE 16 DRAWING No. SHEET NO

3x25+16 DTU 1 01/01

60 KVA
GENERATOR 125A
PTOT= 58 KW (72.5 KVA)

REQUIRED TRANSFORMER CAPACITY=100KVA