Quotation for life shapt As per Your Requirement for life shaft electrification.

The labour rate are as follows:ItemsRate Cable laying on wall surface 20/- Rm Fix with saddle Thimble & gland fixing on each 150/-per end End of cable Fixing of earthing strip 25x3 with strip 20/-Rm Saddle fix on wall Plate earthing depth 20ft & filled with 4000/-per earthing Charcoac & sact Bulk head light on each floor complete 180/- per point Wiring & consuiting with two way Controlled switch 6Amp switch & socket on Alternate 180/- per point Floor complete wiring & condulting With controlled switch Distribution board 12way SPN 300/-per pic Fixing & dressing with all components Exaust fan fixing in machene room 300/- per pic Cable laying in machene room 6sqmm 12/-Rm Flexible in conduit