Professional Documents
Culture Documents
S.no
Header
Section
Water
Qty.
Pipe
Size
Length
between
GPM
(in)
Fittings
Fitting
Equivalent
Total
Equivalent
Frictional Loss
Length (ft)
Length (ft)
Friction
Head
(ft of
water)
Riser
1
0-1
457
2+13 = 15
2 -el
2 x 13 = 26
41
3.28
1 to 2
325
14
14
1.12
2 to 3
188
14
14
1.12
3 to 4
97
2 1/2
14
14
1.12
A-B
457
10
1-p +1-gv
8+6 = 14
24
1.92
C-D
132
12+2 = 14
1-tee+1-gv+1-el
15+3.2+7.5 = 25.7
39.7
3.17
E-F
137
12+2 = 14
1-tee+1-gv+1-el
15+3.2+7.5 = 25.8
39.7
3.17
G-H
89
2 1/2
12+2 = 14
1-tee+1-gv+1-el
12+2.8+6 = 20.8
34.8
2.78
I-J
97
2 1/2
12+2 = 14
1-tee+1-gv+1-el
12+2.8+6 = 20.9
34.8
2.98
Header
77 | P a g e