1st phase: (first 06 tanks):

Elevation of pipe support inside dyke area. Soln: +200 FGL

Pipe line position of 10'' & 8'': Soln: as per drawing. 10 enter dyke area from right

pump house detail: soln: pending; Discuss with Engr. A. Malik

pit pipe routing: Pending; joint type: Welded; coating type: Bitumenus paint & warping.

floor arrangement inside dyke: CC ratio, thickness, slop, type of joint filler etc. Soln: Pending.

final layout of drainage system: soln: pending

probation of temporary pipeline for 1st phase operation soln: pending, discuss later with Engr. Asif Malik.

confirmation of layout:

dyke area: will confirm after calculation. (3rd phase)

tank to tank: minimum 8300 mm. tank to dyke: minimum 2300mm dyke to pipe line distance: 2500 mm

Pipe support distance: pending.

Pipe line Road crossing: pending.

manhole bolt length should be reduced

Datum plate position- should be confirmed with auto gauge contractor.

Receiving pipeline (10)- Jump over dyke wall

Delivery pipeline (8)- through dyke wall. 10" casing pipe with casting.

Coating of coal tar base epoxy around annular & 6" shell plate adjacent to annular*

Color: Stair - Black, Railing- yellow; *Shell- Silver with a black strip along bottom to deep gauge nozzle. * by: Engr. A. Malik.

Earthing- pit earthing, 2 nos at each tank

T8 bottom plate- 4 corners should be adjusted with short pieces