RCC status

Unit

BOQ Scope
Qty

DRG
Released

Cumulative
Executed As On
31/03/2013

Balance Against
Released Drawings

Limestone Crusher

Cu.M

2800.00

950

153.1

796.9

LS crusher MCC

Cu.M

Coal Crusher

Cu.M

250.00

75

Coal crusher MCC

Cu.M

Truck Tippler & Box feeder

Cu.M

700.00

LS Stockpile inc.shed

Cu.M

3080.00

3020

638

2382

Additive & Corrective stockpile inc.shed

Cu.M

3590.00

2044

1543

501

Coal stockpile inc.shed

Cu.M

3719.00

2882

1020

1862

656

656

Sl No
Structure
A) CLINKERIZATION
1

75

Raw Material Hopper

Cu.M

600.00

Raw Mill building

Cu.M

2700.00

2550

1181

1369

Raw mill ducting complex

Cu.M
1348

652

Raw Mill Bag House

Cu.M

2500.00

2000

10

Hot Dust transport system

Cu.M

2000.0

385

11

Pre Heater Building

Cu.M

5600.00

4000

3261

739

12

Kiln Pier I,II,III /T.A.Duct

Cu.M

2300.00

2165

2133

32

13

Cooler Bld

Cu.M

1375.00

600

15

485

14

ESP Fan foundation

Cu.M

1000.00

212

91

121

15

Coal mill inc.bag house/Hopper

Cu.M

2725.00

1350

463

887

16

Cement Mill Hopper

Cu.M

770.00

300

17

Cement Mill Bld

Cu.M

3880.00

18

Cement Mill Bag house

Cu.M

1800.00

20

CCR

Cu.M

2500.00

21

110 KVA switch yard & main SS

Cu.M

350.00

22

Belt conveyors & TT

Cu.M

2400.00

2300

385

300

758

1542

150
0

B ) GRINDING AREA
23

Blending silo

Cu.M

3500.00

2600

24

Fly Ash silo

Cu.M

2850.00

435

25

Cement Silo I & II

Cu.M

4000.00

3060

1625

1435

26

Clinker Silo

Cu.M

5500.00

4800

3032

1768

19

Packing Plant

Cu.M

4800.00

2000

474

1526

C) OTHER STRUCTURES

2357

243
435

RCC status
Sl No
Structure

Unit

BOQ Scope
Qty

DRG
Released

Cumulative
Executed As On
31/03/2013

Balance Against
Released Drawings

27

Water Treatment Plant

Cu.M

1000.00

450

447

28

Project Officer bld

Cu.M

148.00

158

186

29

Gate Complex

Cu.M

121.2

138

138

30

General store Bld

Cu.M

229.00

450

321

129

31

Work Shop Bld

Cu.M

301.00

301

208

93

32

Weigh bridge

Cu.M

150.00

150

150

33

Compound Wall

Cu.M

3455.00

3455

1506

1949

34

Roads & Drains(upto 2.8 km)

Cu.M

4122.00

4122

45

4077

35

Canteen Bld

Cu.M

200.00

200

19

181

36

INFRASTRUCTURE AND SITE


DEVELOPMENT

Cu.M

13350.00

65.00

53.00

12

90365

47873

23384

24574

TOTAL RCC TARGET PER MONTH