22 May 2013 ADDENDUM /BID BULLETIN NO. 13-005 This Addendum/Bid Bulletin No.13-005 is issued in response to the queries made during the pre-bid conference and site inspection conducted on 16 May 2013 for the Renovation of UPOU Multimedia Center Theater, namely to wit: Original Provision A. Opening of Bids
Amendment
10:00 A.M.
2:00 P.M.
B. Form of Bid Security Cash, Certified Check, Cashiers Check or Managers check 2% Bid Securing Declaration
C. Form of Performance Bond Cash, Certified Check, Cashiers Check or Managers check 10%
D. Carpentry Works
E. Movable partition F. Internet configuration/cabling works 2 pairs G. Electrical Works H. Bill of Quantities (BOQ)
Other acceptable form of Bid Security Bank draft/guarantee or irrevocable letter of credit 2% Surety bond - 5% Any combination of the foregoing Proportionate to share of form with respect to total amount of security Other acceptable forms of Performance Bond Bank draft/guarantee or irrevocable letter of credit - 10% Surety bond 30% Any combination of the foregoing Proportionate to share of form with respect to total amount of security Replace all vinyl tiles offstage; design is subject to approval by the end-user Retain vinyl tiles on stage The material for the stairs will be checker plate steel grating without railings Cabinet design will depend on moveable partitions. The height is 2.2m.
4 pairs Electrical Layout attached Remove chairs Revised Detailed Breakdown of Direct Cost Estimate and Bill of Materials attached
This ADDENDUM/BID BULLETIN shall form an integral part of the bid documents for the project. For the guidance and information of all concerned eligible bidders.