TODAY'S

PRESENTATION
OUTLINE OF TOPICS
What is building permit
Why do you need building permit
Requirements for application of building permit
Procedures on applying for building permit

Group 9
WHAT IS BUILDING
PERMIT
A building permit is a document issued by
Department of Building Official that
serves as an official consent before
starting any contruction, demolition,
addition, or renovation of a property.
SECTION 301: BUILDING PERMIT
No person, firm or corporation, including
any agency or instrumentality of the
government shall erect, construct, alter,
repair, move, convert or demolish any
building or structure or cause the same to
be done without first obtaining a building
permit therefor from the Building Official
assigned in the place where the subject
building is located or the building work is to
be done.
REMEMBER

A building permit has to be


secured before doing any
actions to change the
property

SECTION 302: APPLICATION


FOR PERMITS
In order to obtain a building permit , the applicant shall
file an application therefor in writing and on the
prescribed form from the office of the Building Official.
Every application shall provide at least the following
information:
REQUIREMENTS FOR APPLICATION
OF BUILDING PERMIT
1.Ownership of the lot property
If the applicant is the owner of the lot:
Certified true copy of Transfer
Certificate of Title
Tax Declaration
Latest Real Property Tax Receipt

Group 9
True Copy of Transfer
Tax Declaration Tax Receipt
Certificate of Title
REQUIREMENTS FOR APPLICATION
OF BUILDING PERMIT
2. Application Forms
In processing an application for a building permit, the Building Official shall
see to it that the applicant satisfies and conforms with approved standard
requirements on zonings and land use, lines and grades, structural design,
sanitary and sewerage, environmental health, electrical and mechanical safety
as well as with other rules and regulations promulgated in accordance with
the provisions of Permits and Inspection Code.
Application for Building Permit (5 copies)
Electrical Permit Forms (3 copies)
Sanitary Permit Forms (3 copies)

Group 9
Barangay Permit Application Electrical Permit Form Sanitary Permit Form
Form
REQUIREMENTS FOR APPLICATION
OF BUILDING PERMIT
3. Complete Detailed Plan
a. For construction of two-storey building:
Structural Design Analysis
b. For construction of more than two-
storey building:
Boring and Plate Load Test
Seismic Analysis

Group 9
Structural Analysis Plate Load Test Seismic Analysis
REQUIREMENTS FOR
APPLICATION OF
BUILDING PERMIT
4. Copy of License of Engineers and
Architects
Photocopy of PTR # and PRC license
of all involved engineers and
architects

Group 9
PTR Number PRC License
REQUIREMENTS FOR
APPLICATION OF
BUILDING PERMIT
5. If property is not registered under the
name of the applicant:
Contract of Lease
Contract of Sale
Affidavit of Consent of the Lot Owner
for the construction of building or
house
Deed of Absolute Sale
Contract of Lease Contract of Sales Affidavit of Consent
Deed of Absolute Sale
Section 304: Issuance of Building Permit
The Building Official may issue a permit for the construction of only a part or
portion of a building or structure whenever the plans and specifications submitted
together with the application do not cover the entire building or structure.
Approved plans and specifications shall not be changed, modified or altered
without the approval of the Building Official and the work shall be done strictly in
accordance thereto.
Section 305: Validity of Building Permits
The issuance of a building permit shall not be construed as an approval or authorization to the
permittee to disregard or violate any of the provisions. A building permit issued under the
provisions of this Code shall expire and become null and void if the building or authorized therein
is not commenced within a period of one year from the date of such permit, or the building or work
so authorized is suspend or abandoned at any time after it has been commenced, for a period of
120 days.
Section 306: Revocation of Building Permit
The Building Official may order or cause the non-issuance, suspension or revocation of building
permits on any or all of the following reasons or grounds:
(a)Errors found in the plans and specifications;
(b)In correct or inaccurate data or information supplied;
(c)Non-compliance with the provisions of this Code or of any rule or regulation.
Notice of non-issuance, suspension or revocation of building permits shall always be made in
writing, stating the reason or grounds therefore.
Section 307: Appeal
Within fifteen (15) days from the date of receipt of advice of the non-issuance,
suspension or revocation of permits, the applicant permittee may file an appeal with the
Secretary who shall render his decision within fifteen days from the date of receipt of
appeal. The decision of the Secretary shall be final subject only to review by the Office of
the President.

Section 308: Inspection and Supervision of Work


Upon completion of the construction, the said licensed architect or civil engineer shall
submit the logbook, duly signed and sealed, to the Building Official. He shall also prepare
and submit a Certificate of Completion of the project stating that the construction of the
building conforms to the provisions of this Code as well as with the approved plans and
specifications.
Site Development Plan showing
technical description, boundaries,
orientation and position of proposed
non-architectural horizontal structure
such as:sewerage treatment plan (STP),
silos, elevated tanks, towers, fences,
etc. building/structure in relation to the
lot, existing or proposed access road
and driveways and existing public
utilities/services. Existing buildings
within and adjoining the lot shall be
hatched and distances between the
proposed and exiting buildings shall be
indicated.
General Layout Plan for each floor,
drawn to a scale of not less than 1:00,
indicating the equipment in heavier
lines than the building outline with
names of machinery and
corresponding brake horsepower shall
be indicated. Detailed drawings of all
duct works installations, indicating
dampers, controls, filters, fireproofing,
acoustical and thermal insulation.
Electronic plans and technical specifications
for wired or wireless telecommunications
systems, broadcasting systems, including
radio and TV broadcast equipment for
commercial and training purposes, cable or
wireless television systems, information
technology (IT) systems, security and alarm
systems, electronic fire alarm systems,
sound-reinforcement systems, navigational
aids and controls, indoor and outdoor
signages, electronically-controlled
conveyance systems,
electronics/computerized process controls
and automation systems, building
automation, management and control
systems
For all plumbing installations,
additions and/or alterations
involving hot and cold water
supply, fixtures, sewage drainage
and vent system, storm drainage
and sewerage system within or
adjacent to the building
Site Development Plan showing
technical description, boundaries,
orientation and position of
proposed building/structure in
relationto the lot, existing or
proposed access road and
driveways and existing public
utilities/services. Existing buildings
within and adjoiningthe lot shall be
hatched and distancesbetween the
proposed and existing buildings
shall be indicated.
PERMIT
BILLBOARD
0.60 x 0.90 Plywood

1.Bill of Materials and Specification - signed and sealed by an engineer or


an architect at every page
2. Locational Clearance
3. Clearance from the DPWH if the construction is located along National
Highway
BUILDING PERMIT
EXCEPTIONS:
Building permit is not required for the following constructions and
repairs; provided that said constructions shall; not violate any provisioin
of the CODE and its implementing Rules and Regulations.

1. Sheds, outhouses, greenhouses, children's playhouses. It should not


exceed 6 square meter. Floor area should be completely detached and
intended only for private use.
2. Addittion of open terraces or patio resting on the ground, not exceeding
20 square meters floor area.
3. Installation of window grills
4. Garden pools for water plants, fish aquarium not exceeding 50 mm in
depth.
5. Erection of garden walls other than party walls not exceeding 1.80 m in
hieght, cementing of foothpaths, garden walks and/or driveways.

1.Woks not affecting or involving structural members if the


structure
2. Repairs on non load bearing walls
3. Any interior portionof a house not involving addition or
alteration
4. Repairs and replacements of windows
5. Repairs of perimeter fence and walls
6. Repairs and replacement of flooring
7. Repairs and replacement of sanitary or plumbing fixtures
8. Repairs and replacement of faulty or deteriorated wiring devices,
fixtures and safety devices, provided no alteratioins on the service
entrance and main breaker
PROCEDURES ON APPLYING
FOR BUILDING PERMIT

Prepare the list of Submit the filled out forms If the submitted
requirements while you and required documents to requirements are complete,
secure a checklist and the Office of the Building you will be granted an
application forms from the Official acknowledgement or
Office of the Building follow-up slip
Official.
PROCEDURES ON APPLYING
FOR BUILDING PERMIT

Within 15 working days, Settle the charge at the After five days, the building
you will receive an order of cashier's office. permit will be released
payment from the after the submission of
Releasing Section of the proof of payment.
building office.