A building permit, specifically its application form which can be acquired from the Office of the Building Official (OBO),
contains at least the following information:
Sample Building Permit Application Form from the Quezon City Local Government Website
https://tip.instructure.com/courses/22938/pages/1-dot-4-building-permit?module_item_id=1690965 1/4
9/7/2021 1.4. Building Permit: CE 013-CE31S7 - Building Systems Design
Aside from filling up the building permit application form, sufficient documents substantiating your building or project
construction work should be presented as attachments to your application form. These documents include, but are not limited
to, the following:
https://tip.instructure.com/courses/22938/pages/1-dot-4-building-permit?module_item_id=1690965 2/4
9/7/2021 1.4. Building Permit: CE 013-CE31S7 - Building Systems Design
Architectural/Building Plans
Structural Plans
Plumbing/Sanitary Plans
Electrical Plans
Mechanical Plans
Structural Design Computations (structural analysis)
Bill of Materials
Project Specifications
When satisfied that the work described in an application for building permit and the plans and specifications submitted conform
to the requirements of this Code and other pertinent rules and regulations, the Building Official shall, within fifteen days from
payment of the required fees by the applicant, issue the building permit applied for. Approved plans and specifications shall not
be changed, modified or altered without the approval of the Building Official.
The issuance of a building permit shall not be construed as an approval or authorization to the permittee to disregard or violate
any of the provisions of this Code. Whenever the issuance of a permit is based on approved plans and specifications which are
subsequently found defective, the Building Official is not precluded nor prevented from requiring permittee to effect the
necessary corrections in said plans and specifications or from
preventing or ordering the stoppage of any or all building operations being done in the building or project construction
which are in violation of this Code.
A building permit issued under the provisions of this Code shall expire and become null and void if the building or work
authorized is not commenced within a period of one year from the date of the permit, or if the building or work so
authorized is suspended or abandoned at any time after it has been commenced, for a period of 120 days.
Notice of non-issuance, suspension or revocation of building permits shall always be made in writing, stating the reason or
grounds for such action.
https://tip.instructure.com/courses/22938/pages/1-dot-4-building-permit?module_item_id=1690965 3/4
9/7/2021 1.4. Building Permit: CE 013-CE31S7 - Building Systems Design
It is understood however that in either case, the designing architect or civil engineer is not precluded not prevented from
conducting inspection of the construction work to check and determine compliance with the plans and specifications of the
building as submitted.
There shall be kept at the jobsite at all times a logbook wherein the actual progress of construction including tests conducted,
weather conditions and other pertinent data are to be recorded. Upon completion of the construction, the said licensed architect
or civil engineer shall submit the logbook, duly signed and sealed, to the Building Official. He shall also prepare and submit a
Certificate of Completion of the project stating that the construction of building conforms to the provisions of this Code as well
as with the approved plans and specifications.