CONTENT
1.0 Introduction
1
BNB 31103 FOC WEEK 1 ASSIGNMENT
1.0 INTRODUCTION
Building certification is one of the branches of the building control where it is a document of
certificate issued by the parties to confirm that a building constructed regardless of whether
new, additional buildings or the like have been eligible to be used or occupied. Referring to
the provisions of section 70, the Street, Drainage and Building Act 1974 (Act 133) if a project
is to be implemented, it must obtain prior approval from the DO authority of local authorities.
After the DO is obtained, the developer will submit building plans to the local authorities for
approval before any construction work undertaken construction site. Finally, after all the on-
site construction work was completed in accordance with the conditions of approval and the
provisions of the law, then the developer must apply for a certificate of building certificates
from local authorities to enable the purchaser or owner of the building to occupy the building.
The above process is a process of building control that must be adhered to by the parties that
want to execute a construction project to safeguard the interests of the buyer. This to ensure
that the buyer not to purchase the building that is not perfect and does not comply with the
rules and regulations
Uniform Building By-Laws (UBBL) 1984 states that final certificate issued under by-
law 25 for Certificate of Fitness for Occupation (CFO), CFO shall be given when a qualified
person during the course of work have certified in Form E (Second Schedule) that they have
supervised the erection of building and accept full responsibility for those portions which
they are respectively concerned with and local authority authorized by it in writing for the
purpose that the building has been inspected.
2
BNB 31103 FOC WEEK 1 ASSIGNMENT
3
BNB 31103 FOC WEEK 1 ASSIGNMENT
According to the Wang (1987), the local council whilst processing the building plans awaits
the approval of the various plans by the various relevant departments. When all such the
Acts/By-laws/Regulations, or by way of granting waivers to some specific areas that do not
comply to the Acts/By-laws/Regulations due to acceptable reasons, the building plans can
thus be approved. Normally one or more correction notices are sent by the Building
Department to the applicant for the necessary corrections. The process usually takes a
considerable period of time to complete.
After the other requirements and formalities have been fulfilled, the developer/contractor then
proceeds to build the houses. A registered architect supervises the building process. He also
certifies the various stages of construction to the developer. So, the developer can pay the
interim payment to the contractor.
LAs transfer the responsibility to professionals. The professionals that can issue the CCC are
architects, engineers and building draftsman. It looks for, cut red tape or bureaucracy in local
government, enhance the efficiency of the public delivery system and provide better
4
BNB 31103 FOC WEEK 1 ASSIGNMENT
protection for house buyers. The CCC applies to new projects after the enforcement date
while the project commenced before the enforcement date will still be issued with CFOs.
Under CCC Issuance System, Development Order approval process and building plan
approval process are still required. Development Order must obtain from the LA before the
construction of the building is commenced. Besides, the building plan must approved by the
all relevant technical agencies before the construction is commenced.
Under CCC, Planning Permission and Building Plan are still required for submission and
approval by the LA.
While PSP’s major responsibility is to submit Building Plan, other plans can be submitted
by the SP, that is either the Professional Architect or Professional Engineer.
PSP is responsible for ensuring the compliance to the technical conditions imposed by the
LA as the technical conditions are directly related to the safety and stability of the
building being erected and in fact, within the control of the professionals. While the
owner or the developer is fully responsible for the non-technical conditions.
Technical conditions are classified into 3 categories:-
5
BNB 31103 FOC WEEK 1 ASSIGNMENT
1. The technical conditions within the building that relate to the health and
safety aspects of the building
2. The technical conditions outside the building but within the development
area that relate directly to the building and development i.e. elements of
open spaces with landscaping and recreational facilities
3. The technical conditions outside the project area that are linked directly to
the related development, i.e. the access road and utility infrastructure that
are outside the project area
Besides the technical requirements and building specifications that are enforceable by the
provisions of existing laws and regulations, the LA also impose non-technical conditions
to implement the policies of the State Government in fulfilling certain socio-economic
development needs. Example of conditions usually imposed by the LA would include:-
6
BNB 31103 FOC WEEK 1 ASSIGNMENT
Noncompliance by the developer for the submission of Form E and its enclosures to
the LA.
Additional conditions imposed by the LA at the time of application of CFO.
The involvement of many technical agencies and the lack of technical officers to
process the CFO.
Purchasers of properties encounter numerous problems whenever vacant possession is
delivered to them by developers and the purchasers could not occupy or renovate their
properties because the CFO was not issued.
So, to solve the problems, government launched CC as this new system is an effort towards
self-certification and self-regulation approach in the construction industry.
7
BNB 31103 FOC WEEK 1 ASSIGNMENT
The PSP can issue the CCC immediately Once satisfied with the construction, the
after he is satisfied that the construction has Submitting Person submitted an application
fully complied with the provisions of the law to the LA for verification and for on-site
and the technical conditions imposed inspection before the CFO could be issued.
delays as the involvement of many technical The CCC certification can now be issued
agencies and the lack of technical officers to simultaneously with the issuance of the
process the CFO. Notice of Vacant Possession (VP). This will
alleviate problems where a buyer is unable to
occupy the house even though in possession
of the keys.
Not introduced with matrix responsibility Introduced with matrix responsibility concept
concept
8
BNB 31103 FOC WEEK 1 ASSIGNMENT
The CCC certification can now be issued simultaneously with the issuance of the Notice of
Vacant Possession (VP). This will alleviate problems where a buyer is unable to occupy the
house even though in possession of the keys.
9
BNB 31103 FOC WEEK 1 ASSIGNMENT
CONCLUSION
Building certification was important in terms of safety for future building occupants. A
building that has been obtaining certification indicates that the building was fit for use and
occupation. As such, the government in providing the best service besides protecting the
interests of the public, the CCC method was introduced. All parties involved either directly or
indirectly should know their role in providing the best service. This is because if there are
those who ignore their responsibilities and building certificates issued without compliance
with approval conditions can have adverse effects on quality and safety of building. The
literature review also showed that foreign countries are also very concerned about
certification of every building constructed. This can be seen when the action is on the PSP
that fail to discharge their duties properly, including the action interesting issue certificates of
building licenses granted. There was a significant difference between the responsibilities of
the PSP in the countries that use the PSP (professionals) to issue building certificate. In
essence the responsibility and role of the PSP is to regulate or ensure that a building has
complied with all conditions of approval before they can issue the building certificate. The
PSP also responsible to ensure that the contractor involved in a project should make some
repairs or corrections if there are conditions attached to non-compliance. After the repair or
correction PSP must once again examine the work that has been carried out correctly. If the
PSP was satisfied with the work, the compliance certificate for the building can then be
issued. In this way the occupier or owner of the building got a quality building as well as
their safety is more assured. However, to maintain the quality of their services, the PSP
should always work ethics as a system of professional practice as well as good work. By
keeping the two of these things can keep the PSP's performance in carrying out their
responsibilities.
10
BNB 31103 FOC WEEK 1 ASSIGNMENT
REFERENCES
3. Aminah Binti Abdul Rahman, (n.d.). Common Questions Relating With The
Implementation Certificate Of Compliance & Completion (CCC). Retrieved
from http://jkt.kpkt.gov.my
6. Cheong Yoke Ping, (21st Sept 2007). Law and Reality: Understanding The New CCC.
Retrieved from http://www.malaysianbar.org.my
7. Ir. Chen Thiam Leong, (16th August 2007). Certificate of Completion and Compliance
(CCC): FAQ. Retrieved from http://www.acem.com.my
8. Lim Ying Hui. (n. d. ). All Change for Completion Procedures. Retrieved from
http://www.skrine.com/all-change-for-completion-procedures
11