Professional Documents
Culture Documents
)
After cast-in-place concrete slab hardens Cgc line moves up Top bottom concrete fiber stresses for precast section:
Ztc and Zbc = section moduli of the composite section at the level of the top and bottom fibers of the precast section MSCD + ML = incremental moments added after composite action has developed
Top and bottom concrete fiber stresses for cast-in-place (fig 4.32 e, at AA and BB):
= section moduli of the composite section at the level of the top and bottom fibers of =additional composite superimposed dead load moments after erection (at service)
Fully Shored Slab Case Cast-in-place slab is fully shored until composite action develops Before shoring and casting of top slab Top and bottom concrete fiber stresses for precast section:
After casting of top slab and development of composite action Top and bottom concrete fiber stresses for precast section:
h bw ht be Beban qS qL c
Hitung tegangan pada serat bawah, serat atas balok dan serat atas pelat. Dengan asumsi tanpa perancah