C.I.P CLEARENCE / INTERIM INSPECTION REPORT CALL ID : 2O17O7O347 / 07-Jut-2OLr 11:44:00 Concluded as Under Hold
COMBINATION CIP . WITH
l{IL
-34210-S0 19A-1/G5/NOA-II/3463
TifuEr
6r arq:
SHORE CONTRACT FOR SUBSTATION EXTENSION OF 4OOKV GWALIOR ATION ASSOCIATED WITH SYSTEM ING IN WESTERN REGION
Contract Name:
P,N.
Kuppam,
f;q3ld S.3r6.fr 6r
LOAID ItemName
etycummAccepted
II
CIPReason
CIPRemarks
Acceptdnce tests witnessed on samples.Test report is Material is kept on hold fbr want of pF test report from TpL,Type test approval enclosed.PF test required to be carried out at TpL as extended for this project on 18,05.2011 and Drg. Approval aciorOeO on 25.01.11 by Corp. Engg.Results of remaining acaeptance tests meet the the insulators are -required for Isolators.
requirement.
rifusFR 6t 3ft d
On Behalf of
ffdr
61
3f{
..
ql{{fos
Contractor):
Signature:
of
fi in{ t
of
POWERGRTD)|
Manufacturer
-all
Name: Designation:
Stam p:
Name: Designation:
Stam p:
Name: Designation:
9c> r\t1lr
POORNACHANDM RAO
stamp: