C.I.P CLEARENCE / INTERIM INSPECTION REPORT CALL ID : 2O17O7O347 / 07-Jut-2OLr 11:44:00 Concluded as Under Hold
COMBINATION CIP . WITH

l{IL

-34210-S0 19A-1/G5/NOA-II/3463
TifuEr

Mar S.s6.q d@r


Manufacturer CIP No:

6r arq:

SHORE CONTRACT FOR SUBSTATION EXTENSION OF 4OOKV GWALIOR ATION ASSOCIATED WITH SYSTEM ING IN WESTERN REGION

Contract Name:

{l+cr6n ffr 316.S ?qr


Contractor IC No:

13-Jul-2011 - 14-Jul-2011 hachalam Road, 111 - Rev.P3

P,N.

Kuppam,

f;q3ld S.3r6.fr 6r

LOAID ItemName

2183 (Drg.no.765-SC-A-1*ffi)St.nos.asper ' Annexure O?ST fjy, O


Part

765kv solidcore post jnsulators for Isolators

UM QtyorderTotat etyoffered etyAccepted


NOS 90
91

etycummAccepted

II

CIPReason

CIPRemarks

Acceptdnce tests witnessed on samples.Test report is Material is kept on hold fbr want of pF test report from TpL,Type test approval enclosed.PF test required to be carried out at TpL as extended for this project on 18,05.2011 and Drg. Approval aciorOeO on 25.01.11 by Corp. Engg.Results of remaining acaeptance tests meet the the insulators are -required for Isolators.

requirement.

rifusFR 6t 3ft d
On Behalf of

ffdr

61

3f{

..

ql{{fos

Contractor):
Signature:

(On Behalf Signature:

of

fi in{ t
of
POWERGRTD)|

Manufacturer

(On Eehalf Signature:

-all
Name: Designation:
Stam p:

Name: Designation:
Stam p:

Name: Designation:

9c> r\t1lr
POORNACHANDM RAO

stamp:

Date:

Date:

;;

"

(cnrer maruecen)

, *.,,'!iliff',$^tf,ll,,', ai
Tj"'l''"-'''"*'f:RcRrn'rrh'N'

-+::r-z

You might also like