You are on page 1of 139
SIEMENS Instructions Installation Adjustment Maintenance Type SPS-15.5, 25.8, 38, 48.3 & 72.5 Gas Circuit Breaker Spring Operating Mechanism PB 3478-01 For Emergency Service Call: 1-800-241-4453 Siemens Energy & Automation, Inc. CONTENTS TABLE OF CONTENTS = Description Inspection ‘nttocuction 1 General 20 Guaites Peison 1 Periodic inapection Procedure. 21 Operating 2 3 Year inspection Procedure 2 7 Maintenance 2 6 Year inspection Procedure 21 Maintenance Ciosing Device 3 Major Inspection 22 Current Transtormers 3 Periodic Inspection Gheckist 23 Pre Operational Checks 3 3 Year Inspection Gheckist 25 . Supporting Framework 4 6 Year Inspection Checklist 28 Spting Operating Mechanism 4 Major Inspection Checkist 32 Operating Linkage 4 Maintenance/Adjustment and Lubrication Bushings 6 Maintenance Tools, Materials and Equipment... 99 7 Current Transiore 5 General : at The SF Puller Interupior 5 Ordering Replacement Pars, 2 Ruplute Disc end Guard 5 Bushing Weather Case Replacement tems 2.42 Pressure Gauge 5 Maintenance Adjustment 43 = Ground Pads 5 Spring Operaing Mechanism 3 Ling Lugs 5 Operating Linkage 43 Gharacterstcs of Sulu Hexatluaride 5 Closed Position Adjustments a3 Temperature Compenseted Pressure Switch ....8 Open Position Adjustments 43 = Receiving, Handling and Storing Infertupter and Bushings 43 Receiving end Shipment 7 Removal of the Interrupt 43 Unpacking Parts and Accessories 7 Disassembly ofthe interrupter (23KA) “a Handing Procedure 7 Inspection af the interrupter “a = Storage 0! Breaket and Breaker Paris, 7 Replacing nterupter Paton Ring aa {nstatation Replacement ol interrupter Guide Seals 45 “Tools and Service Equipment 9 Cleaning and Lubvicaing Intertupter 45, Selecting the Location io Assemby of the Interupter 45 - Placement of the Circut Breaker 10 Disassembly ofthe interrupter (31 5kA) 45 Grounding Connections 10 Inspection of tho interrupter 4 Contiol Wiring 10 Replacement of ntorupter Guide Seats... 46 Connecting Current Transiormers " Cleaning and Lubsicating Interupter. 48 Checking the Spring Operating Mecheni " ‘Assomaly of the interrupter 46 Installation of External Capacitors (i required) 11 Replacing the Interupter 48 Filing De-energized Breaker with SF Gas... 12 Filing an Energized Greaker with SFy Gas... 47 Breaker inspection 13 Operating Shalt Assombiy a7 = Finel Tests 13 Opening Sezing a7 Une Connections 4 Replacing the Weatheicase “8 Bushings 14 Pole Uni Replacement instructions 48 Installation of Position Indicator and Cover... 14 Replacement of the Rupture Dise “8 ~ Final Installation Connections Checking External Capact “3 ‘and Inspection Summary 18 Leak Checking “0 Principles of Operation Gorrent Transformers. 40 Closing 18 Paint (Power Paint) 43 = Opening 18 Minor Paint Repair ~ Touch-up “9 Sping Operating Mochanism 18 Major Paint Ropa' 43 Bolicrank Assembly 1 Hysraulc Shock Absorber 43 Operating Snalt Assemblies 18 {Lubrication 50 . Opening Spzing 18 Recommended Torque Values. 50 interrupter Assemblies. 19 Englsh/Metic Conversion Factors 50 Hystauiie Shock Absorber 19 Table |-- Operating Characteristics. st

You might also like