You are on page 1of 1

Dates SF14 ML 14 MR 14 Identification of the equipment Type of equipment

SUBSTATION:

Type of drive/diagram

AC DC Motor voltage V Inspection of O and C position O: C: O: C: O: C: O: C: O: C: O: C: Measurement of O and C overtravels (CS - stop) t Inspection of the direction of rotation Un V U mini V U maxi V O: C: O: C: O: C: O: C: O: C: O: C: s O: C: O: C: O: C: O: C: O: C: O: C: s O: C: O: C: O: C: O: C: O: C: O: C: s Motor consumption at Un A Operation of the I.O contacts of high-speed earthing switch (malt) Inspection of operation of the magnetic lock Inspection of crank handle limit switch If insulated earthing switch: insulation 2 kV or visual checking FG 46 260-1/E - Appendix 1 U maxi U mini Operating times Un Number of switching operations according to FG46215

PROJECT/BAY:

You might also like