Dammam University

Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


22 B1 Student Housing Buliding

Project Name :Main -Contractor :- Azmeel

Saudi Ensas Co. Ltd

Sub -Contractor :-

AHU-01

Date :-

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

Duct
Tag

sn

Duct Dimension (mm)

Eqmpt.
Tag

Type of Duct

Z1

Z2

Z3

Z4

Length( Area
mm)
(Sq.m)

Actual
Wt(kg) Per
Piece.

0.71

0.85

1.2

Qty
(nos.)

Duct
Gage

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

1a-1

SAD - 1 Reducer

500

500

1200

400

500

1.00

19.6

--

--

--

19.60

1.2

1a-2

SAD - 1 Elb 90

1200

400

1200

400

1900

6.08

110.2

--

--

--

110.20

1.2

SAD - 1 Str.

1200

400

1200

400

1050

3.36

73.65

--

--

--

73.65

1.2

SAD - 1 Taper B/F

1200

400

1200

350

400

1.28

39.15

--

--

--

39.15

1.2

3a

SAD - 1 Str.

1200

350

1200

350

1200

3.72

75.45

--

--

--

75.45

1.2

3b

SAD - 1 Str. (FD) VCD

1200

350

1200

350

200

0.62

32.45

--

--

--

32.45

1.2

3c

SAD - 1 Str. (VCD)

1200

350

1200

350

1200

3.72

75.45

--

--

--

75.45

1.2

425.95

TOTAL

19.78

RETURN AIR DUCT (MECHANICAL ROOM)


170

1a

AHU - 1 Str.

1200

400

1200

400

650

2.08

47.35

--

--

--

47.35

1.2

171

1b

AHU - 1 Str.

1200

400

1200

400

850

2.72

53.6

--

--

--

53.60

1.2

172

AHU - 1 Taper C B/F (FD)

1200

400

1200

350

300

0.96

36.25

--

--

--

36.25

1.2

173

AHU - 1 Str. (FD) VCD

1200

350

1200

350

200

0.62

32.6

--

--

--

32.60

1.2

0.00

0.00

0.00

169.80
1

1.2

TOTAL RAD (MECHANICAL ROOM)

6.38

RETURN AIR DUCT (INDOOR DUCT)


174

AHU - 1 Taper B M (VCD)

1200

350

1600

350

350

1.09

TOTAL RAD (INDOOR DUCT)

1.09

Total Duct qty AHU - 1


For Sub-Contractor

For Consultant

26.7

--

--

--

26.70

0.00

0.00

0.00

26.70

0.00

0.00

0.00

622.45

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

AHU-01

Page 1

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

AHU-02

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Duct Dimension (mm)

Eqmpt.
Tag

Type of Duct

Z1

Z2

Z3

Z4

Length(
mm)

Area
(Sq.m)

Actual
Wt(kg) Per
Piece.

0.71

0.85

1.2

Qty
(nos.)

Duct
Gage

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

AHU - 2 Taper C B/F

700

700

1000

400

300

0.84

14.02

--

--

14.02

--

AHU - 2 Str

1000

400

1000

400

750

2.10

22.55

--

--

22.55

--

AHU - 2 Taper C B/F

1000

400

1050

350

300

0.84

12.5

--

--

12.50

--

AHU - 2 Str

1050

350

1050

350

250

0.70

11.5

--

--

11.50

--

AHU - 2 Elb 90

1050

350

1050

350

1850

5.18

56.65

--

--

56.65

--

7a

AHU - 2 Str

1050

350

1050

350

880

2.46

26

--

--

26.00

--

--

--

0.00

--

Single Skin Guid Vains is Fixed on tag no6

7b

AHU - 2 Str

1050

350

1050

350

1220

3.42

44.95

--

--

44.95

--

AHU - 2 Elb 90

1050

350

1050

350

1900

5.32

51.75

--

--

51.75

--

10

9a

AHU - 2 Str

1050

350

1050

350

930

2.60

26.65

--

--

26.65

--

122

86

AHU - 2 Taper C B/F

700

700

650

350

300

0.84

9.85

9.85

--

--

--

0.71

123

87

AHU - 2 Str

650
350
TOTAL SAD (MECHANICAL ROOM)

650

350

500

1.00

11.24

11.24

--

--

--

0.71

21.09

0.00

266.57

0.00

25.30

RETURN AIR DUCT (MECHANICAL ROOM)


188

189

2a

AHU - 2 Sq. Bend (S)


AHU - 2 Straight

1100

500

1100

500

2100

6.72

87.9

--

--

--

87.90

1.2

1100

500

1100

500

280

0.90

36.15

--

--

--

36.15

190

2b

1.2

1100

500

1100

500

1200

3.84

77.85

--

--

--

77.85

1.2

AHU - 2 Straight (S)


AHU - 2 Taper C B/F

191

1100

500

1050

350

500

1.60

31.75

--

--

--

31.75

1.2

192

AHU - 2 Elb 90

1050

350

1050

350

1900

5.32

51.75

--

--

51.75

--

193

5
6

AHU - 2 Str
AHU - 2 Taper S B/F

1050
1050

350
350

1050
1400

350
350

1100
350

3.08

30.35
29.85

--

--

30.35

--

--

--

--

29.85

1
1.2

0.00

0.00

82.10

263.50

194

TOTAL RAD (MECHANICAL ROOM)

0.98
22.44

RETURN AIR DUCT (INDOOR DUCT)


195

AHU - 2 S Coll

600

350

600

350

200

0.38

7.14

7.14

--

--

--

0.71

196

8a-a

AHU - 2 Str

600

350

600

350

1220

2.32

19.26

19.26

--

--

--

0.71

197

8a-2

AHU - 2 Str

600

350

600

350

1220

2.32

19.26

19.26

--

--

--

0.71

198

8b

AHU - 2 Str

600

350

600

350

860

1.63

14.98

14.98

--

--

--

0.71

60.64

0.00

0.00

0.00

81.73

0.00

348.67

263.50

199

AHU - 2 Single Skin Guid Vains is Fixed on tag no4


TOTAL RAD (INDOOR DUCT)

6.65

Total Duct qty AHU - 2


For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

Page 2

AHU-02

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-03

Date :-

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

sn

Duct Tag

Eqmpt.
Tag

Duct Dimension (mm)


Type of Duct

Z1

Z2

Z3

Z4

Length(
mm)

Area
(Sq.m)

Actual
Wt(kg)
Per Piece.

0.71

0.85

1.2

Qty
(nos.)

Duct
Gage

Remarks

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

1a-1

AHU - 3 Reducer

500

500

1200

350

500

1.00

18.5

--

--

--

18.50

1.2

1a-2

AHU - 3 Elb 90

1200

350

1200

350

1850

5.74

98.25

--

--

--

98.25

1.2

AHU - 3 Elb 90 (2S)

1200

350

1200

350

2050

6.36

98.25

--

--

--

98.25

1.2

2b

AHU - 3 Straight (FD)

1200

350

1200

350

410

1.27

39

--

--

--

39.00

1.2

0.00

0.00

0.00

TOTAL SAD (MECHANICAL ROOM)

14.36

SUPPLY AIR DUCT (INDOOR DUCT)


5

2c

AHU - 3 Straight (FD) VCD

1200

350

1200

350

200

0.62

32.29

--

--

--

32.29

1.2

2d

AHU - 3 Straight (S)

1200

350

1200

350

1050

3.26

73.14

--

--

--

73.14

1.2

1200

350

1200

350

400

1.24

38.55

38.55

--

--

--

0.71

1200
350
TOTAL RAD (MECHANICAL ROOM)

1600

350

350

1.09

26.75

26.75

--

--

--

0.71

65.30

0.00

0.00

0.00

65.30

0.00

0.00

359.43

RETURN AIR DUCT (MECHANICAL ROOM)


167

168

AHU - 3 Str. (FD) VCD


AHU - 3 Taper B/M

2.33

Total Duct qty AHU - 3


For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

Page 3

AHU-03

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-04

Date :-

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

sn

Duct
Tag

Eqmpt.
Tag

Type of Duct

First Floor
Duct Dimension (mm)
Z1
Z2
Z3
Z4

Length(
mm)

Area
(Sq.m)

T.
Weight

0.71

0.85

1.2

Qty Duct
Remarks
(nos. Gage

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

1a-1

AHU - 4 Reducer

500

500

1200

400

500

1.00

19.60

--

--

--

19.60

1.2

1a-2

AHU - 4 Elb 90

1200

400

1200

400

1700

5.44

112.20

--

--

--

112.20

1.2

AHU - 4 Straight

1200

400

1200

400

1000

3.20

72

--

--

--

72.00

1.2

AHU - 4 Taper B/F

1200

400

1200

350

400

1.28

39.15

--

--

--

39.15

1.2

3a

AHU - 4 Straight (FD)

1200

350

1200

350

1400

4.34

83.35

--

--

--

83.35

1.2

3b

AHU - 4 Straight (FD)

1200

350

1200

350

1200

3.72

75.45

--

--

--

75.45

1.2

0.00

0.00

0.00

401.75

45.66

--

--

--

45.66

1.2

TOTAL SAD (MECHANICAL ROOM)

18.98

SUPPLY AIR DUCT (INDOOR DUCT)


7

AHU - 4 Taper Dn Off 150

1200

350

1000

400

500

1.55

RETURN AIR DUCT (MECHANICAL ROOM)


173

AHU - 4 Straight

1200

400

1200

400

850

2.72

53.6

--

--

--

53.60

1.2

174

AHU - 4 Taper C B/F FD

1200

400

1200

350

300

0.96

36.25

--

--

--

36.25

1.2

175

AHU - 4 Straight (FD) VCD

1200

350

1200

350

200

0.62

32.6

--

--

--

32.60

1.2

176

AHU - 4 Taper B/F VCD

1200

350

1600

350

350

1.09

26.75

--

--

--

26.75

1.2

0.00

0.00

0.00

149.20

0.00

0.00

596.61

TOTAL RAD (MECHANICAL ROOM)

5.39

Total Duct qty AHU - 4


For Sub-Contractor

0.00

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

Page 4

AHU-04

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-05

Date :-

sn

Duct
Tag

HVAC Duct Layout Plan Fourth Floor


Duct Dimension (mm)
Length
(mm)
Z1
Z2
Z3
Z4

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

Eqmpt.
Tag

Type of Duct

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty
(nos.

Duct
Gage

Remarks

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

AHU - 5 Str

1150

450

1150

450

1050

3.36

66.48

--

--

--

66.48

1.2

AHU - 5 Elb

450

1150

450

1150

1900

6.08

73.50

--

--

--

73.50

1.2

3a

AHU - 5 Str

1150

450

1150

450

400

1.28

25.30

--

--

--

25.30

1.2

3b

AHU - 5 Str (FD)(S)

1150

450

1150

450

800

2.56

50.65

--

--

--

50.65

1.2

AHU - 5 Taper C T/F

1150

400

1000

450

500

1.55

31.05

--

--

--

31.05

1.2

5a-1

AHU - 5 Str.

1000

450

1000

450

1220

3.54

33.05

--

--

--

33.05

1.2

5a-2

AHU - 5 Str.

1000

450

1000

450

1220

3.54

33.05

--

--

--

33.05

1.2

5b

AHU - 5 Str.

1000

450

1000

450

790

2.29

23.40

--

--

--

23.40

1.2

5c

AHU - 5 Str.

1000

450

1000

450

1220

3.54

33.05

--

--

--

33.05

1.2

0.00

0.00

0.00

204.25

18.45

--

--

--

18.45

1.2

TOTAL SAD (MECHANICAL ROOM)

17.02

SUPPLY AIR DUCT (INDOOR DUCT)


10

AHU - 5 Taper C B/F

1000

450

900

400

600

RETURN AIR DUCT (MECHANICAL ROOM)

1.74

0.00

147

1a

AHU - 5 S.Coll

1150

450

1150

450

150

0.48

6.20

--

--

--

6.20

1.2

148

1b

AHU - 5 Str

1150

450

1150

450

435

1.39

17.90

--

--

--

17.90

1.2

149

2a

AHU - 5 Str.

1150

450

1150

450

290

0.93

11.98

--

--

--

11.98

1.2

150

2b

AHU - 5 Str

1150

450

1150

450

1220

3.90

50.40

--

--

--

50.40

1.2

151

AHU - 5 D-End

1150

450

1150

450

450

1.44

18.60

--

--

--

18.60

1.2

152

AHU - 5 H-taper

1150

450

1150

450

300

0.96

31.05

--

--

--

31.05

1.2

0.00

0.00

0.00

136.13

TOTAL RAD (MECHANICAL ROOM)

9.10

RETURN AIR DUCT (INDOOR DUCT)


153

AHU - 5 str

1150

450

1150

450

780

2.50

32.22

--

--

--

32.22

1.2

154

AHU - 5 Bell Mouth

1150

450

1150

450

350

1.12

14.45

--

--

--

14.45

1.2

0.00

0.00

0.00

46.67

0.00

0.00

405.50

TOTAL RAD (INDOOR DUCT)

3.62

Total Duct qty AHU - 5 Fl 2,3, & 4


For Sub-Contractor

0.00

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

AHU - 05 FL 2,3 & 4

Page 5

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-06

Date :-

sn

Duct
Tag

HVAC Duct Layout Plan Fourth Floor


Duct Dimension (mm)
Length(
mm)
Z1
Z2
Z3
Z4

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

Eqmpt.
Tag

Type of Duct

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty Duct
Remarks
(nos.) Gage

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

AHU - 6 Str.

950

400

950

400

925

2.50

21.6

--

--

21.60

--

AHU - 6 Taper

400

950

400

950

400

1.08

9.45

--

--

9.45

--

AHU - 6 Str.

950

400

950

400

400

1.08

9.45

--

--

9.45

--

AHU - 6 Elb

950

400

950

400

1550

4.19

37.5

--

--

37.50

--

5a

AHU - 6 Str.

950

400

950

400

1220

3.29

30.5

--

--

30.50

--

5b

AHU - 6 Str.

950

400

950

400

805

2.17

21.25

--

--

21.25

--

AHU - 6 Elb

950

400

950

400

1550

4.19

37.5

--

--

37.50

--

7a

AHU - 6 Str.

950

400

950

400

1220

3.29

30.5

--

--

30.50

--

7b

AHU - 6 Str (FD)

950

400

950

400

1180

3.19

27.55

--

--

27.55

--

0.71

0.85

226.30

1.20

TOTAL (MECHANICAL ROOM)

24.98

SUPPLY AIR DUCT (INDOOR DUCT)


10

AHU - 6 Up offset 50

400

950

400

950

625

1.69

18.95

--

--

18.95

--

11

AHU - 6 Elb 90 (S)

950

400

950

400

1850

5.00

48.85

--

--

48.85

--

For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

RETURN AIR DUCT (MECHANICAL ROOM)


126

AHU - 6 Str.

950

450

950

450

500

1.40

12.5

--

--

12.50

--

127

AHU - 6 Str.

950

450

950

450

500

1.40

12.5

--

--

12.50

--

128

AHU - 6 Elb 90 (S)

950

450

950

450

1900

5.32

50.75

--

--

50.75

--

129

4a

AHU - 6 Str.

950

450

950

450

1220

3.42

30.75

--

--

30.75

--

130

4b

AHU - 6 Str.

950

450

950

450

780

2.18

22.35

--

--

22.35

--

131

AHU - 6 Elb 90 (S)

950

450

950

450

1900

5.32

50.75

--

--

50.75

--

132

AHU - 6 Str.

950

450

950

450

1250

3.50

31.5

--

--

31.50

--

133

AHU - 6 Taper

950

450

950

400

500

1.40

12.6

--

--

12.60

--

134

AHU - 6 Str.

950

400

950

400

1100

2.97

27.8

--

--

27.80

--

0.00

0.00

251.50

0.00

0.85

545.60

1.20

TOTAL RAD (MECHANICAL ROOM)

26.91

Total Duct qty AHU - 6 Fl 2,3 & 4


For Sub-Contractor

0.71

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

AHU - 06 FL 2,3 & 4

Page 6

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-07

Date :-

Duct
Tag

sn

HVAC Duct Layout Plan Fourth Floor


Duct Dimension (mm)
Length(
mm)
Z1
Z2
Z3
Z4

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

Eqmpt.
Tag

Type of Duct

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty Duct
(nos. Gage

Remarks

SUPPLY AIR DUCT (MECHANICAL ROOM)


1

AHU - 7 Elb 90

1150

400

1150

400

2050

6.36

73.5

--

--

--

73.50

1.2

2a

AHU - 7 Str

1150

400

1150

400

1200

3.72

58.8

--

--

--

58.80

1.2

2b

AHU - 7 Str (FD)

1150

400

1150

400

550

1.71

28.95

--

--

--

28.95

1.2

AHU - 7 Up Offset 50

400

1150

400

1150

650

2.02

44.7

--

--

--

44.70

1.2

4a

AHU - 7 Str.

1150

400

1150

400

375

1.16

36.4

--

--

--

36.40

1.2

4b-1

AHU - 7 Str.

1150

400

1150

400

1220

3.78

59.75

--

--

--

59.75

1.2

4b-2

AHU - 7 Str.

1150

400

1150

400

1220

3.78

59.70

--

--

--

59.70

1.2

5a

AHU - 7 Y Elb 90 (VCD)S

800

400

950

400

1700

4.08

58.45

--

58.45

--

--

0.85

5b

AHU - 7 Y Str.

350

400

350

400

525

0.79

9.05

9.05

--

--

--

0.71

9.05

58.45

0.00

361.80

TOTAL (MECHANICAL ROOM)

27.39

SUPPLY AIR DUCT (INDOOR DUCT)


10

AHU - 7 Taper S B/F

350

400

500

400

600

0.90

9.05

9.05

--

--

--

0.71

RETURN AIR DUCT (MECHANICAL ROOM)


151

AHU - 7 Str.

1150

400

1150

400

790

2.45

40.9

--

--

--

40.90

1.2

152

AHU - 7 S.coll

1150

400

1150

400

75

0.23

3.88

--

--

--

3.88

1.2

153

AHU - 7 Str.

1150

400

1150

400

1575

4.88

81.60

--

--

--

81.60

1.2

154

AHU - 7 D-End

1150

400

0.92

31.62

--

--

--

31.62

1.2

155

AHU - 7 Elb 90

400

2050

6.36

73.5

--

--

--

73.50

1.2

0.00

0.00

0.00

231.50

1150

400

1150

TOTAL RAD (MECHANICAL ROOM)

14.84

RETURN AIR DUCT (INDOOR DUCT)


156

6a

AHU - 7 Str.

1150

400

1150

400

300

0.93

15.5

--

--

--

15.50

1.2

157

6b

AHU - 7 Str.

1150

400

1150

400

1200

3.72

62.20

--

--

--

62.20

1.2

158

6c

AHU - 7 Str.

1150

400

1150

400

1200

3.72

62.2

--

--

--

62.20

1.2

159

6d

AHU - 7 Str.

1150

400

1150

400

1200

3.72

62.2

--

--

--

62.20

1.2

160

6e

AHU - 7 Str.

1150

400

1150

400

1200

3.72

62.2

--

--

--

62.20

1.2

161

AHU - 7 Bell Mouth

1150

400

1550

400

350

1.09

18.2

--

--

--

18.20

1.2

0.00

0.00

0.00

282.50

18.10

58.45

0.00

875.80

TOTAL RAD (INDOOR DUCT)

16.90

Total Duct qty AHU - 7 Fl 2, 3, & 4


For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

AHU-07 FL 2,3,& 4

Page 7

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

AHU-8

Date :-

22B1-PL-0-4HVAC-01-SD-01 HVAC Duct Layout Plan Fourth Floor


Duct Eqmpt.
Duct Dimension (mm)
Length(
Type of Duct
Tag
Tag
mm)
Z1
Z2
Z3
Z4
SUPPLY AIR DUCT (MECHANICAL ROOM)

Drg No. :-

sn

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty
(nos.)

Duct
Gage

AHU-08 Str.

1150

450

1150

450

1050

3.36

54.20

--

--

--

54.20

1.2

AHU-08 Elb

450

1150

450

1150

1600

5.12

73.50

--

--

--

73.50

1.2

AHU-08 Str.

1150

450

1150

450

1170

3.74

60.25

--

--

--

60.25

1.2

AHU-08 Str. (FD) S

1150

400

1150

400

1200

3.72

61.85

--

--

--

61.85

1.2

AHU-08 Taper C T/F

1150

400

1000

450

500

1.55

30.30

--

--

--

30.30

1.2

0.00

0.00

0.00

280.10

TOTAL SAD (MECHANICAL ROOM)

17.49

Remarks

RETURN AIR DUCT (MECHANICAL ROOM)


167

1a

AHU - 8 Str.

1150

450

1150

450

435

1.39

22.36

--

--

--

22.36

1.2

168

1b

AHU - 8 S.coll

1150

450

1150

450

150

0.48

7.72

--

--

--

7.72

1.2

169

2a

AHU - 8 Str.

1150

450

1150

450

360

1.15

18.55

--

--

--

18.55

1.2

170

2b

AHU - 8 Str.

1150

450

1150

450

1200

3.84

61.8

--

--

--

61.80

1.2

171

AHU - 8 D-End

1150

450

1.04

32.9

--

--

--

32.90

1.2

172

AHU - 8 H-Taper

1150

300

0.96

15.45

--

--

--

15.45

1.2

0.00

0.00

0.00

158.78

450

1150

400

TOTAL RAD (MECHANICAL ROOM)

8.86

RETURN AIR DUCT (INDOOR DUCT)


173

AHU - 8 Str.

1150

400

1150

400

780

2.42

40.20

--

--

--

40.20

1.2

174

AHU - 8 Bell Mouth

1150

400

1150

400

350

1.09

18.02

--

--

--

18.02

1.2

0.00

0.00

0.00

58.22

0.00

0.00

497.10

TOTAL RAD (INDOOR DUCT)

3.50

Total Duct qty AHU - 8 Fl 2, 3 , & 4


For Sub-Contractor

0.00

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

AHU - 08 FL 2,3 & 4

Page 8

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01a-1

Date :Drg No. :-

sn

Duct
Tag

Eqmpt.
Tag

22B1-PL-0-4HVAC-01-SD-01 HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
Type of Duct
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01A-1 EXHAUST AIR DUCT (RISER)


1

EF - 01A

Str.

100

100

100

100

600

2.175

2.18

--

--

--

0.71

EF - 01A

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01A

Str.

100

100

100

100

1200

4.35

8.70

--

--

--

0.71

EF - 01A

Str.

100

100

100

100

1400

5.075

5.08

--

--

--

0.71

EF - 01A

C Taper

100

100

125

100

300

1.155

1.16

--

--

--

0.71

EF - 01A

Str.

125

100

125

100

1200

4.078

16.31

--

--

--

0.71

EF - 01A

C Taper B/F

125

100

125

125

300

1.22

1.22

--

--

--

0.71

EF - 01A

Str.

125

125

125

125

1200

4.53

18.12

--

--

--

0.71

EF - 01A

C Taper B/F

125

125

200

150

300

1.63

1.63

--

--

--

0.71

10

EF - 01A

Str.

200

150

200

150

1200

6.5

13.00

--

--

--

0.71

11

EF - 01A

Str.

200

150

200

150

1100

6.00

--

--

--

0.71

12

EF - 01A

Str.

100

100

100

100

600

2.65

7.95

--

--

--

0.71

13

EF - 01A

Coll

200

100

100

100

180

1.25

3.75

--

--

--

0.71

For Sub-Contractor

SUB-TOTAL

86.34

TOTAL

86.34

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-1a1

Page 9

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01a-2

Date :Drg No. :-

sn

Duct
Tag

Eqmpt.
Tag

22B1-PL-0-4HVAC-01-SD-01 HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
Type of Duct
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01A-2 EXHAUST AIR DUCT (RISER)


1

EF - 01A

Str.

100

100

100

100

600

2.175

2.18

--

--

--

0.71

EF - 01A

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01A

Str.

100

100

100

100

1200

4.35

8.70

--

--

--

0.71

EF - 01A

Str.

100

100

100

100

1400

5.075

5.08

--

--

--

0.71

EF - 01A

C Taper

100

100

125

100

300

1.155

1.16

--

--

--

0.71

EF - 01A

Str.

125

100

125

100

1200

4.078

16.31

--

--

--

0.71

EF - 01A

C Taper B/F

125

100

125

125

300

1.22

1.22

--

--

--

0.71

EF - 01A

Str.

125

125

125

125

1200

4.53

18.12

--

--

--

0.71

EF - 01A

C Taper B/F

125

125

200

150

300

1.63

1.63

--

--

--

0.71

10

EF - 01A

Str.

200

150

200

150

1200

6.5

13.00

--

--

--

0.71

11

EF - 01A

Str.

200

150

200

150

1100

6.00

--

--

--

0.71

12

EF - 01A

Str.

100

100

100

100

600

2.65

7.95

--

--

--

0.71

13

EF - 01A

Coll

200

100

100

100

180

1.25

3.75

--

--

--

0.71

For Sub-Contractor

SUB-TOTAL

86.34

TOTAL

86.34

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01a -2

Page 10

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01B

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

Type of Duct

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-01B EXHAUST AIR DUCT (RISER)


1

EF - 01B

Str.

300

300

300

300

600

5.09

5.09

--

--

--

0.71

EF - 01B

Elb 90

300

300

300

300

100r

2.55

2.55

--

--

--

0.71

EF - 01B

Str.

300

300

300

300

1400

11.89

11.89

--

--

--

0.71

EF - 01B

Str.

300

300

300

300

1200

10.20

20.40

--

--

--

0.71

EF - 01B

C Taper B/F

300

300

400

400

300

5.05

5.05

--

--

--

0.71

EF - 01B

Str.

400

400

400

400

1200

13.25

53.00

--

--

--

0.71

EF - 01B

C Taper B/F

400

400

500

450

300

6.95

6.95

--

--

--

0.71

EF - 01B

Str.

500

450

500

450

1200

18.65

74.60

--

--

--

0.71

EF - 01B

C Taper B/F

500

450

500

500

300

7.10

7.10

--

--

--

0.71

10

EF - 01B

Str.

500

500

500

500

1200

18.00

36.00

--

--

--

0.71

11

EF - 01B

Str.

500

500

500

500

1100

16.75

16.75

--

--

--

0.71

12

EF - 01B

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01B

Str.

100

100

100

100

600

2.60

7.80

--

--

--

0.71

14

EF - 01B

Coll

200

100

100

100

180

1.15

6.90

--

--

--

0.71

For Sub-Contractor

SUB-TOTAL

257.98

TOTAL

257.98

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01B

Page 11

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01C - 1(1)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

Type of Duct

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01C-1 EXHAUST AIR DUCT (RISER)


1

EF - 01C

Str.

100

100

100

100

600

2.6

2.60

--

--

--

EF - 01C

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01C

Str.

100

100

100

100

200

1.00

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1400

5.54

5.54

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1200

4.75

9.50

--

--

--

0.71

EF - 01C

C Taper

125

125

150

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

150

125

150

125

1200

4.75

19.00

--

--

--

0.71

EF - 01C

C Taper

150

125

200

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

200

125

200

125

1200

5.85

23.40

--

--

--

0.71

10

EF - 01C

C Taper B/F

200

125

200

200

300

2.1

2.10

--

--

--

0.71

11

EF - 01C

Str.

200

200

200

200

1100

7.15

14.30

--

--

--

0.71

12

EF - 01C

Str.

200

200

200

200

1200

6.55

6.55

--

--

--

0.71

13

EF - 01C

Str.

100

100

100

100

300

1.3

3.90

--

--

--

0.71

14

EF - 01C

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

15

EF - 01C

Coll

200

100

100

100

180

1.15

6.90

--

--

--

0.71

107.44

0.00

0.00

0.00

SUB-TOTAL

0.71

TOTAL
For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01C - (1)

Page 12

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

EF - 01C- 1 (2)

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

Type of Duct

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01C-1 EXHAUST AIR DUCT (RISER)


1

EF - 01C

Str.

100

100

100

100

600

2.6

2.60

--

--

--

EF - 01C

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01C

Str.

100

100

100

100

200

1.00

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1400

5.54

5.54

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1200

4.75

9.50

--

--

--

0.71

EF - 01C

C Taper

125

125

150

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

150

125

150

125

1200

4.75

19.00

--

--

--

0.71

EF - 01C

C Taper

150

125

200

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

200

125

200

125

1200

5.85

23.40

--

--

--

0.71

10

EF - 01C

C Taper B/F

200

125

200

200

300

2.1

2.10

--

--

--

0.71

11

EF - 01C

Str.

200

200

200

200

1100

7.15

14.30

--

--

--

0.71

12

EF - 01C

Str.

200

200

200

200

1200

6.55

6.55

--

--

--

0.71

13

EF - 01C

Str.

100

100

100

100

300

1.3

3.90

--

--

--

0.71

14

EF - 01C

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

15

EF - 01C

Coll

200

100

100

100

180

1.15

6.90

--

--

--

0.71

107.44

0.00

0.00

0.00

SUB-TOTAL

0.71

TOTAL
For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01C -(2)

Page 13

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

EF - 01C- 1 (3)

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01C-1 EXHAUST AIR DUCT (RISER)


1

EF - 01C

Str.

100

100

100

100

600

2.6

2.60

--

--

--

EF - 01C

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01C

Str.

100

100

100

100

200

1.00

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1400

5.54

5.54

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1200

4.75

9.50

--

--

--

0.71

EF - 01C

C Taper

125

125

150

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

150

125

150

125

1200

4.75

19.00

--

--

--

0.71

EF - 01C

C Taper

150

125

200

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

200

125

200

125

1200

5.85

23.40

--

--

--

0.71

10

EF - 01C

C Taper B/F

200

125

200

200

300

2.1

2.10

--

--

--

0.71

11

EF - 01C

Str.

200

200

200

200

1100

7.15

14.30

--

--

--

0.71

12

EF - 01C

Str.

200

200

200

200

1200

6.55

6.55

--

--

--

0.71

13

EF - 01C

Str.

100

100

100

100

300

1.3

3.90

--

--

--

0.71

14

EF - 01C

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

15

EF - 01C

Coll

200

100

100

100

180

1.15

6.90

--

--

--

0.71

107.44

0.00

0.00

0.00

For Sub-Contractor

For Consultant

0.71

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01C -(3)

Page 14

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

EF - 01C- 1 (4)

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01C-1 EXHAUST AIR DUCT (RISER)


1

EF - 01C

Str.

100

100

100

100

600

2.6

2.60

--

--

--

EF - 01C

Elb 90

100

100

100

100

100r

1.25

1.25

--

--

--

0.71

EF - 01C

Str.

100

100

100

100

200

1.00

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1400

5.54

5.54

--

--

--

0.71

EF - 01C

Str.

125

125

125

125

1200

4.75

9.50

--

--

--

0.71

EF - 01C

C Taper

125

125

150

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

150

125

150

125

1200

4.75

19.00

--

--

--

0.71

EF - 01C

C Taper

150

125

200

125

300

1.8

1.80

--

--

--

0.71

EF - 01C

Str.

200

125

200

125

1200

5.85

23.40

--

--

--

0.71

10

EF - 01C

C Taper B/F

200

125

200

200

300

2.1

2.10

--

--

--

0.71

11

EF - 01C

Str.

200

200

200

200

1100

7.15

14.30

--

--

--

0.71

12

EF - 01C

Str.

200

200

200

200

1200

6.55

6.55

--

--

--

0.71

13

EF - 01C

Str.

100

100

100

100

300

1.3

3.90

--

--

--

0.71

14

EF - 01C

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

15

EF - 01C

Coll

200

100

100

100

180

1.15

6.90

--

--

--

0.71

107.44

0.00

0.00

0.00

For Sub-Contractor

For Consultant

0.71

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01C -(4)

Page 15

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1(11)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (11)

Page 16

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (10)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (10)

Page 17

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (9)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (9)

Page 18

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (8)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (8)

Page 19

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (7)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (7)

Page 20

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (6)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (6)

Page 21

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (5)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (5)

Page 22

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (4)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (4)

Page 23

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (3)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (3)

Page 24

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1 (2)

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1 (2)

Page 25

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-01-1

Date :Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-01-1 (1) EXHAUST AIR DUCT (RISER)


1

EF - 01

Str.

100

100

100

100

200

0.73

0.73

--

--

--

0.71

EF - 01

Str.

100

100

100

100

600

2.17

2.17

--

--

--

0.71

EF - 01

C Taper

125

125

150

125

300

1.80

1.80

--

--

--

0.71

EF - 01

Str.

150

125

150

125

1200

5.15

5.15

--

--

--

0.71

EF - 01

C Taper

150

125

200

125

300

1.63

1.63

--

--

--

0.71

EF - 01

Str.

200

125

200

200

1200

7.10

7.10

--

--

--

0.71

EF - 01

C Taper B/F

200

125

200

200

300

1.77

1.77

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1100

7.98

7.98

--

--

--

0.71

EF - 01

Str.

200

200

200

200

1200

8.70

8.70

--

--

--

0.71

10

EF - 01

Str.

100

100

100

100

300

1.30

3.90

--

--

--

0.71

13

EF - 01

Str.

100

100

100

100

600

2.6

7.80

--

--

--

0.71

16

EF - 01

Coll

200

100

100

100

180

0.82

4.92

--

--

--

0.71

21

EF - 01

Y-Piece

125

125

1.43

1.43

--

--

--

0.71

55.08

0.00

0.00

0.00

For Sub-Contractor

100x100 100x100

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-01-1

Page 26

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-02

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

EF-02 EXHAUST AIR DUCT (RISER)


1

EF - 02

Str.

200

150

200

150

600

3.25

3.25

--

--

--

0.71

EF - 02

Elb 90

200

150

200

150

150r

2.75

2.75

--

--

--

0.71

EF - 02

Str.

200

150

200

150

1400

7.6

7.60

--

--

--

0.71

EF - 02

Str.

200

150

200

150

1200

6.5

13.00

--

--

--

0.71

EF - 02

C Taper B/F

200

150

250

200

300

2.6

2.60

--

--

--

0.71

EF - 02

Str.

250

200

250

200

1400

13.67

13.67

--

--

--

0.71

EF - 02

Str.

250

200

250

200

1200

11.72

23.44

--

--

--

0.71

EF - 02

C Taper B/F

250

200

250

250

300

3.09

3.09

--

--

--

0.71

EF - 02

Str.

250

250

250

250

1400

15.19

15.19

--

--

--

0.71

10

EF - 02

Str.

250

250

250

250

1200

13.02

26.04

--

--

--

0.71

11

EF - 02

C Taper

250

250

300

250

300

3.42

3.42

--

--

--

0.71

12

EF - 02

Str.

300

250

300

250

1200

14.33

42.99

--

--

--

0.71

13

EF - 02

Str.

300

250

300

250

900

10.75

10.75

--

--

--

0.71

14

EF - 02

Str.

200

150

200

150

600

3.25

9.75

--

--

--

0.71

15

EF - 02

Coll

300

150

200

150

200

1.62

4.86

--

--

--

0.71

SUB-TOTAL

182.40

0.00

0.00

0.00

TOTAL

182.40

0.00

0.00

0.00

For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-02

Remarks

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-03

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-03 EXHAUST AIR DUCT (RISER)


1

EF - 03

Str.

200

150

200

150

600

3.25

3.25

--

--

--

EF - 03

Elb 90

200

150

200

150

150r

2.75

2.75

--

--

--

0.71

EF - 03

Str.

200

150

200

150

1400

7.60

7.60

--

--

--

0.71

EF - 03

Str.

200

150

200

150

1200

6.50

13.00

--

--

--

0.71

EF - 03

C Taper B/F

200

150

250

200

300

2.60

2.60

--

--

--

0.71

EF - 03

Str.

250

200

250

200

1200

11.72

23.44

--

--

--

0.71

EF - 03

C Taper B/F

250

200

300

250

300

3.25

3.25

--

--

--

0.71

EF - 03

Str.

300

250

300

250

1200

14.33

57.32

--

--

--

0.71

EF - 03

C Taper B/F

300

250

300

300

300

3.75

3.75

--

--

--

0.71

10

EF - 03

Str.

200

150

200

150

600

3.25

9.75

--

--

--

0.71

11

EF - 03

Coll

300

150

200

150

200

1.63

4.89

--

--

--

0.71

0.71

For Sub-Contractor

Sub - Total

131.60

0.00

0.00

0.00

Total

131.60

0.00

0.00

0.00

For Consultant

0.71

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-03

Page 28

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-04

Date :Drg No. :-

sn

Duct
Tag

22B1-PL-0-4HVAC-01-SD-01
Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

EF-04

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

Page 29

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-04

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-04 EXHAUST AIR DUCT (RISER)


1

EF - 04

Str.

250

200

250

200

600

5.86

5.86

--

--

--

EF - 04

Elb 90

250

200

250

200

150r

4.60

4.60

--

--

--

0.71
0.71

EF - 04

Str.

250

200

250

200

1400

13.67

13.67

--

--

--

0.71

EF - 04

Str.

250

200

250

200

1200

9.76

19.52

--

--

--

0.71

EF - 04

C Taper B/F

250

200

350

2580

300

3.42

3.42

--

--

--

0.71

EF - 04

Str.

350

250

350

250

1200

15.62

62.48

--

--

--

0.71

EF - 04

C Taper

350

250

500

250

300

4.40

4.40

--

--

--

0.71

EF - 04

Str.

500

250

500

250

1200

19.53

78.12

--

--

--

0.71

EF - 04

C Taper

500

250

600

250

300

5.21

5.21

--

--

--

0.71

10

EF - 04

Str.

600

250

600

250

1200

22.14

44.28

--

--

--

0.71

11

EF - 04

Str.

600

250

600

250

1100

20.30

20.30

--

--

--

0.71

12

EF - 04

Str.

250

200

250

200

600

5.86

17.58

--

--

--

0.71

13

EF - 04

Coll

350
Sub - Total

200

250

200

200

2.06

6.18

--

--

--

0.71

285.62

0.00

0.00

0.00

Total
For Sub-Contractor

285.62

For Consultant

0.00

0.00

0.00

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-04

Page 30

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-05

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-05 EXHAUST AIR DUCT (RISER)


1

EF - 05

Str.

200

150

200

150

600

3.25

3.25

--

--

--

0.71

EF - 05

Elb 90

200

150

200

150

150r

2.75

2.75

--

--

--

0.71

EF - 05

Str.

200

150

200

150

1400

7.6

7.60

--

--

--

0.71

EF - 05

Str.

200

150

200

150

1200

6.5

13.00

--

--

--

0.71

EF - 05

C Taper B/F

200

150

250

200

300

2.6

2.60

--

--

--

0.71

EF - 05

Str.

250

200

250

200

1400

13.67

13.67

--

--

--

0.71

EF - 05

Str.

250

200

250

200

1200

11.72

23.44

--

--

--

0.71

EF - 05

C Taper B/F

250

200

250

250

300

3.09

3.09

--

--

--

0.71

EF - 05

Str.

250

250

250

250

1400

15.19

15.19

--

--

--

0.71

10

EF - 05

Str.

250

250

250

250

1200

13.02

26.04

--

--

--

0.71

11

EF - 05

C Taper

250

250

300

250

300

3.42

3.42

--

--

--

0.71

12

EF - 05

Str.

300

250

300

250

1200

14.33

42.99

--

--

--

0.71

13

EF - 05

Str.

300

250

300

250

900

10.75

10.75

--

--

--

0.71

14

EF - 05

Str.

200

150

200

150

600

3.25

9.75

--

--

--

0.71

15

EF - 05

Coll

300

150

200

150

200

1.62

4.86

--

--

--

0.71

182.40

0.00

0.00

0.00

182.40

0.00

0.00

0.00

Sub - Total
Total
For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-05

Page 31

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

EF-06

Date :Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3

Z4

Length(
mm)

Actual
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

EF-06 EXHAUST AIR DUCT (RISER)


1

EF - 06

Str.

200

150

200

150

600

3.25

3.25

--

--

--

EF - 06

Elb 90

200

150

200

150

150r

2.75

2.75

--

--

--

0.71
0.71

EF - 06

Str.

200

150

200

150

1400

7.60

7.60

--

--

--

0.71

EF - 06

Str.

200

150

200

150

1200

6.50

13.00

--

--

--

0.71

EF - 06

C Taper B/F

200

150

250

200

300

2.60

2.60

--

--

--

0.71

EF - 06

Str.

250

200

250

200

1200

11.72

23.44

--

--

--

0.71

EF - 06

C Taper B/F

250

200

300

250

300

3.25

3.25

--

--

--

0.71

EF - 06

Str.

300

250

300

250

1200

14.33

57.32

--

--

--

0.71

EF - 06

C Taper B/F

300

250

300

300

300

3.75

3.75

--

--

--

0.71

10

EF - 06

Str.

200

150

200

150

600

3.25

9.75

--

--

--

0.71

11

EF - 06

Coll

300

150

200

150

200

1.63

4.89

--

--

--

0.71

131.60

0.00

0.00

0.00

131.60

0.00

0.00

0.00

Sub - Total
Total
For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

EF-06

Page 32

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 01

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-01 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 01 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 01

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 01

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 01

Straight

400

350

400

350

1200

12.60

50.40

--

--

--

0.71

PF - 01

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 01

Straight

400

400

400

400

1200

13.25

53.00

--

--

--

0.71

PF - 01

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 01

Straight

450

400

450

400

1200

14.15

70.75

--

--

--

0.71

PF - 01

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 01

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

11

11

PF - 01

Elbow (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

12

12

PF - 01

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 01

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remarks

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-01

Page 33

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 02

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-02 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 02 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 02

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 02

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 02

Straight

400

350

400

350

4800

12.60

50.40

--

--

--

0.71

PF - 02

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 02

Straight

400

400

400

400

4800

13.25

53.00

--

--

--

0.71

PF - 02

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 02

Straight

450

400

450

400

2400

14.15

28.30

--

--

--

0.71

PF - 02

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 02

Straight

450

400

450

400

3600

14.15

42.45

--

--

--

0.71

11

11

PF - 02

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

12

12

PF - 02

Elb (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

13

13

PF - 02

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

14

14

PF - 02

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-02

Page 34

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 03

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-03 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 03 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 03

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 03

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 03

Straight

400

350

400

350

1200

12.60

50.40

--

--

--

0.71

PF - 03

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 03

Straight

400

400

400

400

1200

13.25

53.00

--

--

--

0.71

PF - 03

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 03

Straight

450

400

450

400

1200

14.15

70.75

--

--

--

0.71

PF - 03

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 03

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

11

11

PF - 03

Elbow (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

12

12

PF - 03

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 03

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-03

Page 35

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 04

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-04 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 04 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 04

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 04

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 04

Straight

400

350

400

350

4800

12.60

50.40

--

--

--

0.71

PF - 04

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 04

Straight

400

400

400

400

4800

13.25

53.00

--

--

--

0.71

PF - 04

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 04

Straight

450

400

450

400

2400

14.15

28.30

--

--

--

0.71

PF - 04

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 04

Straight

450

400

450

400

3600

14.15

42.45

--

--

--

0.71

11

11

PF - 04

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

12

12

PF - 04

Elb (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

13

13

PF - 04

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

14

14

PF - 04

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-04

Page 36

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 05

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-05 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 05
Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.25

10.25

--

--

--

0.71

PF - 05

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 05

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 05

Straight

400

350

400

350

4800

50.4

50.40

--

--

--

0.71

PF - 05

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 05

Straight

400

400

400

400

4800

53

53.00

--

--

--

0.71

PF - 05

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 05

Straight

450

400

450

400

2400

28.3

28.30

--

--

--

0.71

PF - 05

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 05

Straight

450

400

450

400

3600

42.45

42.45

--

--

--

0.71

11

11

PF - 05

Elbow

450

400

450

400

900

9.95

9.95

--

--

--

0.71

12

12

PF - 05

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 05

Straight

450

400

450

400

1300

21.06

21.06

--

--

--

0.71

262.16

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-05

Page 37

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 06

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01
HVAC Duct Layout Plan First Floor
Duct Eqmpt.
Duct Dimension (mm)
sn
Type of Duct
Tag
Tag
Z1
Z2
Z3
Z4
PF-06 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 06
1
Straight
300
300
300
300
1

Length( Actual
mm)
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

1200

10.25

10.25

--

--

--

0.71

PF - 06

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 06

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 06

Straight

400

350

400

350

4800

50.4

50.40

--

--

--

0.71

PF - 06

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 06

Straight

400

400

400

400

4800

53

53.00

--

--

--

0.71

PF - 06

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 06

Straight

450

400

450

400

2400

28.3

28.30

--

--

--

0.71

PF - 06

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 06

Straight

450

400

450

400

3600

42.45

42.45

--

--

--

0.71

11

11

PF - 06

Elbow

450

400

450

400

900

9.95

9.95

--

--

--

0.71

12

12

PF - 06

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 06

Straight

450

400

450

400

1300

21.06

21.06

--

--

--

0.71

262.16

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Name:-

Name:-

Witnessed By :Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-06

Page 38

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 07

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-07 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 07 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 07

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 07

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 07

Straight

400

350

400

350

4800

12.60

50.40

--

--

--

0.71

PF - 07

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 07

Straight

400

400

400

400

4800

13.25

53.00

--

--

--

0.71

PF - 07

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 07

Straight

450

400

450

400

2400

14.15

28.30

--

--

--

0.71

PF - 07

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 07

Straight

450

400

450

400

3600

14.15

42.45

--

--

--

0.71

11

11

PF - 07

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

12

12

PF - 07

Elb (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

13

13

PF - 07

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

14

14

PF - 07

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-07

Page 39

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 08

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-08 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 08 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 08

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 08

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 08

Straight

400

350

400

350

1200

12.60

50.40

--

--

--

0.71

PF - 08

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 08

Straight

400

400

400

400

1200

13.25

53.00

--

--

--

0.71

PF - 08

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 08

Straight

450

400

450

400

1200

14.15

70.75

--

--

--

0.71

PF - 08

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 08

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

11

11

PF - 08

Elbow (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

12

12

PF - 08

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 08

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-08

Page 40

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 09

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-09 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 09 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 09

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 09

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 09

Straight

400

350

400

350

4800

12.60

50.40

--

--

--

0.71

PF - 09

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 09

Straight

400

400

400

400

4800

13.25

53.00

--

--

--

0.71

PF - 09

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 09

Straight

450

400

450

400

2400

14.15

28.30

--

--

--

0.71

PF - 09

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 09

Straight

450

400

450

400

3600

14.15

42.45

--

--

--

0.71

11

11

PF - 09

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

12

12

PF - 09

Elb (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

13

13

PF - 09

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

14

14

PF - 09

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-09

Page 41

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

PF - 10

Drg No. :-

22B1-PL-0-4HVAC-01-SD-01

Duct Eqmpt.
Type of Duct
Tag
Tag
PF-10 PRESSURIZATION AIR DUCT (RISER &
INDOOR)
PF - 10 Straight
1 1

sn

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

300

300

300

300

1200

10.2

10.20

--

--

--

0.71

PF - 10

Straight

300

300

300

300

800

7.45

7.45

--

--

--

0.71

PF - 10

Reducer

300

300

400

350

300

4.85

4.85

--

--

--

0.71

PF - 10

Straight

400

350

400

350

1200

12.60

50.40

--

--

--

0.71

PF - 10

Reducer

400

350

400

400

300

5.00

--

--

--

0.71

PF - 10

Straight

400

400

400

400

1200

13.25

53.00

--

--

--

0.71

PF - 10

Reducer

400

400

450

400

300

5.85

5.85

--

--

--

0.71

PF - 10

Straight

450

400

450

400

1200

14.15

70.75

--

--

--

0.71

PF - 10

Straight

450

400

450

400

700

9.45

9.45

--

--

--

0.71

10

10

PF - 10

Straight

450

400

450

400

900

11.35

11.35

--

--

--

0.71

11

11

PF - 10

Elbow (R-150)

450

400

450

400

9.95

9.95

--

--

--

0.71

12

12

PF - 10

Straight

450

400

450

400

1200

14.15

14.15

--

--

--

0.71

13

13

PF - 10

Straight

450

400

450

400

800

10.4

10.40

--

--

--

0.71

262.80

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

Remark
s

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

PF-10

Page 42

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

FAF-01

Date :Drg No. :-

sn

Duct
Tag

22B1-PL-0-4HVAC-01-SD-01
Eqmpt.
Tag

Type of Duct

Z1

Duct Dimension (mm)


Z2
Z3
Z4

Length(
mm)

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty Duct
(nos.) Gage

Remarks

FAF-01 FRESH AIR FAN (RISER)


1

FAF-01

Elb 90

300

300

300

300

900

1.08

2.55

2.55

--

--

--

0.71

FAF-01

Str.

300

300

300

300

1200

1.44

10.2

10.20

--

--

--

0.71

FAF-01

Str.

300

300

300

300

800

0.96

7.45

7.45

--

--

--

0.71

FAF-01

Red

300

300

400

400

300

0.36

5.05

5.05

--

--

--

0.71

FAF-01

Str.

400

400

400

400

1200

1.92

13.9

55.60

--

--

--

0.71

FAF-01

Red

400

400

400

500

300

0.48

6.95

6.95

--

--

--

0.71

FAF-01

Str.

500

450

500

450

1200

2.28

18.65

74.60

--

--

--

0.71

FAF-01

Red

500

450

500

500

300

0.57

7.1

7.10

--

--

--

0.71

FAF-01

Str.

500

500

500

500

1200

2.40

18

36.00

--

--

--

0.71

10

FAF-01

Str.

500

500

500

500

1100

2.20

16.5

16.50

--

--

--

0.71

222.00

0.00

0.00

0.00

Total

For Sub-Contractor

13.69

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

FAF-01

Page 43

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

FAF - 02

Drg No. :-

sn

Duct
Tag

22B1-PL-0-4HVAC-01-SD-01
Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Area
mm)
(Sq.m)
Z1
Z2
Z3
Z4

Type of Duct

Actual
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

FAF-02 FRESH AIR FAN (RISER)


1

FAF-02

Elb 90

400

300

400

300

1000

1.40

8.3

8.30

--

--

--

0.71

FAF-02

Str.

400

300

400

300

1200

1.68

12.1

12.10

--

--

--

0.71

FAF-02

Str.

400

300

400

300

800

1.12

10.08

10.08

--

--

--

0.71

FAF-02

Red

400

300

450

450

300

0.42

5.7

5.70

--

--

--

0.71

FAF-02

Str.

450

450

450

450

1200

2.16

15.1

60.40

--

--

--

0.71

FAF-02

Red

450

450

550

550

300

0.54

7.1

7.10

--

--

--

0.71

FAF-02

Str.

550

550

550

550

1200

2.64

18.3

73.20

--

--

--

0.71

FAF-02

Red

550

550

600

600

300

0.66

7.75

7.75

--

--

--

0.71

FAF-02

Str.

600

600

600

600

1200

2.88

19.85

39.70

--

--

--

0.71

10

FAF-02

Str.

600

600

600

600

1100

2.64

18.2

18.20

--

--

--

0.71

--

--

--

--

0.00

0.00

0.00

Total
For Sub-Contractor

16.14
For Consultant

242.53

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

FAF-02

Page 44

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

FAF - 03

Drg No. :-

sn

Duct
Tag

22B1-PL-0-4HVAC-01-SD-01
Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length
(mm)
Z1
Z2
Z3
Z4

Type of Duct

Area
(Sq.m)

Actual
Wt(kg)

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remarks

FAF-03 FRESH AIR FAN (RISER)


1

FAF-03

Elb 90

300

300

300

300

1000

1.20

2.55

2.55

--

--

--

0.71

FAF-03

Str.

300

300

300

300

1200

1.44

10.2

10.20

--

--

--

0.71

FAF-03

Str.

300

300

300

300

800

0.96

7.45

7.45

--

--

--

0.71

FAF-03

Red

300

300

400

400

300

0.36

5.05

5.05

--

--

--

0.71

FAF-03

Str.

400

400

400

400

1200

1.92

13.9

55.60

--

--

--

0.71

FAF-03

Red

400

400

400

500

300

0.48

6.95

6.95

--

--

--

0.71

FAF-03

Str.

500

450

500

450

1200

2.28

18.65

74.60

--

--

--

0.71

FAF-03

Red

500

450

500

500

300

0.57

7.1

7.10

--

--

--

0.71

FAF-03

Str.

500

500

500

500

1200

2.40

18

36.00

--

--

--

0.71

10

FAF-03

Str.

500

500

500

500

1100

2.20

16.5

16.50

--

--

--

0.71

222.00

0.00

0.00

0.00

Total

For Sub-Contractor

13.81

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

FAF-03

Page 45

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

Date :-

1st Floor

Drg No. :-

sn

22B1-PL-0-4HVAC-01-SD-01

Duct
Tag

Eqmpt.
Tag

HVAC Duct Layout Plan First Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

Type of Duct

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

Remark
s

1st Floor
1

AHU - 1 Trasfer Air Duct

350

200

350

200

400

2.70

83.70

--

--

--

31

0.71

AHU - 1 Trasfer Air Duct

350

250

350

250

400

3.00

3.00

--

--

--

0.71

AHU - 1 Trasfer Air Duct

550

200

550

200

400

3.50

3.50

--

--

--

0.71

AHU - 1 Trasfer Air Duct

400

350

400

350

400

4.00

4.00

--

--

--

0.71

AHU - 1 Trasfer Air Duct

350

250

350

250

400

3.00

3.00

--

--

--

0.71

350

400

3.7

3.70

--

--

--

0.71

--

--

--

AHU - 1 Trasfer Air Duct

350

350

350

AHU - 1 Trasfer Air Duct

250

200

250

200

400

2.2

4.40

0.71

AHU - 1 Trasfer Air Duct

200

150

200

150

400

1.72

3.44

--

--

--

0.71

AHU - 1 Trasfer Air Duct

250

200

250

200

400

2.2

2.20

--

--

--

0.71

10

AHU - 1 Trasfer Air Duct

200

200

200

200

400

1.95

1.95

--

--

--

0.71

11

AHU - 1 Trasfer Air Duct

200

150

200

150

400

1.72

3.44

--

--

--

0.71

116.33

0.00

0.00

0.00

Total

For Sub-Contractor

For Consultant

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

TAD-FIRST

Page 46

Dammam University
Dammam, Kingdom of Saudi Arabia

Project : Student Housing - Phase 1 ,2 & 3


Mohamed Al-Sabek
Architects, Planners Consulting Engineers

Duct Actual Weight Approval Form


Project Name :-

22 B1 Student Housing Buliding

Main -Contractor :- Azmeel


Sub -Contractor :-

Saudi Ensas Co. Ltd

TAD- 2nd, 3rd &4th FLOOR

Date :-

22B1-PL-0-4HVAC-01-SD-01

Drg No. :-

Duct
Tag

sn

Eqmpt.
Tag

Type of Duct

HVAC Duct Layout Plan Fourth Floor


Duct Dimension (mm)
Length( Actual
mm)
Wt(kg)
Z1
Z2
Z3
Z4

0.71

0.85

1.2

Qty(nos
.)

Duct
Gage

AHU-05

Transfer Air Duct - AHU05


Transfer Air Duct

350

250

350

250

400

6.30

6.30

--

--

--

0.71

AHU-05

Transfer Air Duct

300

300

300

300

400

2.94

2.94

--

--

--

0.71

AHU-05

Transfer Air Duct

300

250

300

250

400

2.70

2.70

--

--

--

0.71

AHU-05

Transfer Air Duct

250

200

250

200

400

2.21

2.21

--

--

--

0.71

AHU-05

Transfer Air Duct

400

350

400

350

400

3.70

3.70

--

--

--

0.71

AHU-05

Transfer Air Duct

250

250

250

250

400

2.45

2.45

--

--

--

0.71

AHU-06

Transfer Air Duct - AHU06


Transfer Air Duct

350

250

350

250

400

6.30

6.30

--

--

--

0.71

AHU-06

Transfer Air Duct

300

250

300

250

400

2.94

2.94

--

--

--

0.71

AHU-07

Transfer Air Duct - AHU07


Transfer Air Duct

350

250

350

250

400

3.00

3.00

--

--

--

0.71

10

AHU-07

Transfer Air Duct

300

250

300

250

400

2.70

2.70

--

--

--

0.71

11

AHU-07

Transfer Air Duct

500

450

500

250

400

4.70

4.70

--

--

--

0.71

12

AHU-08

Transfer Air Duct - AHU07


Transfer Air Duct

400

300

400

300

400

7.60

7.60

--

--

--

0.71

13

AHU-08

Transfer Air Duct

350

300

350

300

400

3.10

3.10

--

--

--

0.71

14

AHU-08

Transfer Air Duct

300

250

300

250

400

2.70

2.70

--

--

--

0.71

15

AHU-08

Transfer Air Duct

250

200

250

200

400

2.21

2.21

--

--

--

0.71

16

AHU-08

Transfer Air Duct

200

200

200

200

400

1.96

1.96

--

--

--

0.71

17

AHU-08

Transfer Air Duct

400

0.35

400

0.35

400

3.70

3.70

--

--

--

0.71

61.21

0.00

0.00

0.00

Total
For Sub-Contractor

For Consultant

Remarks

For Main Contractor

Checked By :-

Approved By :-

Witnessed By :-

Name:-

Name:-

Name:-

Company :-

Company :-

Company :-

Signature

Signature

Signature

TAD FL2,3 & 4

Page 47

You might also like