----- Original Message ----From: Jill Hall To: tiger@flowingwell.

net Sent: Tuesday, August 06, 2013 10:26 AM Subject: St Garfield & Tiger 1-13 Final Drilling Report

On Site Engineering, LLC Daily Drilling Report Operat or: Tiger Development, LLC Advanced Energy Service Rig Rig: 2 PN: 60667

Day: Date: Well Name: Well No: Est TD

13Tuesday 08/06/13

State Garfield & Tiger 1-13 Permit 5194' MD Depth

Status: 5-1/2" production csg run & cmtd. Drlg Depth: Footage Cut: 0' completed. MO drlg rig.WO 5162' TD WO completion. Days Report Day # Drill rate min/ftLast csg: Size Depth TOC: 13 days 5-1/2" 4250' (caliper est 13 N/A Production 5162' calculation) MUD Gradient-psi/ft Wt-ppg Vis-Sec W.L.-cc Cl-mg/l LCM-lb/bbl Solids %

08/05/ 13 0700 Hrs 0915 Hrs 1115 Hrs 1200 Hrs

Monday Continued running 5-1/2" production csg. OB w/ csg. Circd w/ rig pumps. Catted in Cent Mich . RU cmtg head & RU to cmt. Cmtd csg as described below. CIP. RD & catted out Cent Mich. WOC 12 hrs before cutting off 5-1/2" csg in the cellar. Displaced rig pit fluid to brine tank. Cleaned rig pits. Started RD drlg eqpt as feasible. Casing/cementing detail: ran 116 jts (5168.68') of new 5-1/2" 15.5 #/ft J-55 & K-55 EUE csg. Set csg OB @ 5162'. Insert @ 5118'. Cent Mich cmtd w/ 200 sx Cl A neat. Full returns. Displaced cmt w/ 121.8 BFW. Bumped plug/insert held. Recipd csg during cmt displacement. CIP @ noon on 8/5/13.

08/06/ 13

Tuesday

000 Hrs 0430 Hrs

Raised BOP stack & GLWH set csg slips w/ 70 M#. Cut off 5-1/2" csg in the cellar & prepped stub for the tbg spool. ND BOPs & NU 3000 psi wp tbg spool. Secured well w/ tbg hanger. Rig released @ 4:30 am on 08/06/13. Final report until completion operations commence.