You are on page 1of 1

On Site Engineering, LLC Daily Drilling Report Operator: Rig: PN: Depth: 4256' Days 13 days est MUD

Brine 08/01/13 0700 Hrs 1130 Hrs 1230 Hrs 1745 Hrs 2245 Hrs 08/02/13 0200 Hrs 0700 Hrs Tiger Development, LLC Advanced Energy Service Rig 2 60667 Footage Cut: Report Day # 9 Gradient-psi/ft 0.53 Thursday Rotated w/ minor slide corrections Down .5 hrs for routine rig service. Rotated w/ minor slide corrections Rotated w/ minor slide corrections Rotated w/ minor slide corrections Friday 643'
Drill rate min/ft

Day: Date: Well Name: Well No: Est TD

9-Fri 08/02

State 1-13 5194

Status: Rotating in the Detroit River Sour @ 4256' @ 2 min Last csg: Vis-Sec 28 Size 8-5/8" Surface W.L.-cc No Control Depth 881' Cl-mg/l 129,000

2 Wt-ppg 10.2

LCM

& surveyed for 140' from 3613'-3753' in 4.5 hrs @ 1-2.5 min/ft. Pumpe Added 300 bbl 10.3 ppg brine to the mud system to minimze hole was & surveyed for 252' from 3753'-4005' in 5.25 hrs @ 1-2.5 min/ft. & surveyed for 146' from 4005'-4151' in 5 hrs @ 1-2.5 min/ft. P-ate had & surveyed for 43' from 4151'-4194' in 3.25 hrs @ 3-6 min/ft. P-rate ha

Rotated w/ minor slide corrections & surveyed for 62' from 4194'-4256' in 5 hrs @ 2-6 min/ft. Pumped vi Rotating in the Detroit River Sour @ 4256' @ 2 min/ft. BHA Elevations GL : 1127.8' RF : 1142.0' RT: KB : 1142.0'

Description
1 jt DP 121 jts DP 12 jts DCs 2 monel DCs UBHO Flo Str 1.5 Motor Bit

ID/Profile
4-1/2" od 4-1/2" od 6-3/8" od 6-3/8" od 6-1/2" od 6-1/2" od 6-1/4" od 7-7/8" od

Length
31' 3819' 350' 60' 3' 3' 20' 1'

Depth
0' 3819' 4169' 4229' 4232' 4235' 4255' 4256'

Formatio Traverse Lm 260 Bell Shale 333 Dundee 324 Reed City An 352 Reed City Dol 353 Det Riv Anhy 374 Det Riv Salt 378 Deviation Surve 1

You might also like