You are on page 1of 6

Kawempe Mbogo Site Layout

2.1M

3m

3m Gen Set Room

4.3M

4.7m BBS 8500C 0.3m 3m


0.2m

Ericsson RBS 3G TX Cabinet

0.4m 3m

0.24m AC Power Source

Proposed Space 2 New Cabinet

1m

0.27m

0.5m 0.14m

0.14m

Cable Holes

Mbogo Site Layout

0.6M
0.8m

2.45m

2.37m

0.42m BBS NSN RRU 0.5m 2m

0.78m

3m 2.75m

Proposed Space 1 New Cabinet


RBS 2116vs (HOT SWAP)

oposed Space 2 w Cabinet


1.45m 1.5m

15m

2.37m

0.42m

0.78m

3m

15m

You might also like