You are on page 1of 3

CONTRACT NO: SG2327 P/O NO : 4500070840 ABUDHABI GAS DEVELOPMENT COMPANY LIMITED SHAH GAS DEVELOPMENT(SGD) PROGRAM

FEEDER NO: = D11

Test Protocal No: SG2327-0080 MEASUREMENT AFTER ENERGIZATION (BUS-1A)

Page 1 of 3 Date:13-06-

2013 MEASUREMENT AFTER ENERGIZATION (BUS-1 A VT)


1.0). VOLTAGE MEASUREMENT BUS-1 A (D11+S) AT SWGR (LCC) 220KV SWGR(LCC) (Core 1) TER. NO. 1 2 3 4 5 6 7 8 9 10 R-Y Y-B B-R R-N Y-N B-N R-E Y-E B-E N-E
- X710 : 11 - 21 - X710 : 21 - 31 - X710 : 31 - 11 - X710 : 11 32 - X710 : 21 32 - X710 : 31 32 - X710 : 11 E - X710 : 21 E - X710 : 31 E - X710 : 32 E
VOLTAGE MEASURED

SL. NO.

PHASE

(in Volts)

VOLTMETER (P415) READING (D11+S) at LCC (in kV)

: RY: RN:

YB: YN:

BR: BN:

BCU (A201) READING (D11+S) at LCC (in kV):

RY: RN:

YB: YN:

BR: BN:

CARRIED OUT BY Name Signature Date 13-06-2013 BOOBALAN .M

WITNESSED / APPROVED BY Name Signature Date 13-06-2013 BALA MURUGAN.P

WITNESSED / APPROVED BY Name Signature Date

SIEMENS

Samsung Engineering

PMC

CONTRACT NO: SG2327 P/O NO : 4500070840 ABUDHABI GAS DEVELOPMENT COMPANY LIMITED SHAH GAS DEVELOPMENT(SGD) PROGRAM
FEEDER NO: = D11

Test Protocal No: SG2327-0080 MEASUREMENT AFTER ENERGIZATION (BUS-1A)

Page 2 of 3 Date:13-06-

2013
VOLTMETER (P415) READING (D12+S) at LCC (in kV) : RY: RN: BCU (A201) READING (D12+S) at LCC (in kV): RY: 220KV PROTECTION PANEL(=D11+R) (Core 1) TER. NO. R-Y Y-B B-R R-N Y-N B-N R-E Y-E B-E N-E
- X701 : 11 - 21 - X701 : 21 - 31 - X701 : 31 - 11 - X701 : 11 32 - X701 : 21 32 - X701 : 31 32 - X701 : 11 E - X701 : 21 E - X701 : 31 E - X701 : 32 E
VOLTAGE MEASURED

YB: YN:

BR: BN:

SL. NO. 1 2 3 4 5 6 7 8 9 10

PHASE

(in Volts)

F510 RELAY DISPLAY (D11+R) (in kV): RY: RN: F510 (R17&R18) RELAY (D12+R) (in V): RY:

YB: YN:

BR: BN:

CARRIED OUT BY Name Signature Date 13-06-2013 BOOBALAN .M

WITNESSED / APPROVED BY Name Signature Date 13-06-2013 BALA MURUGAN.P

WITNESSED / APPROVED BY Name Signature Date

SIEMENS

Samsung Engineering

PMC

CONTRACT NO: SG2327 P/O NO : 4500070840 ABUDHABI GAS DEVELOPMENT COMPANY LIMITED SHAH GAS DEVELOPMENT(SGD) PROGRAM
FEEDER NO: = D11

Test Protocal No: SG2327-0080 MEASUREMENT AFTER ENERGIZATION (BUS-1A)

Page 3 of 3 Date:13-06-

2013

3.0) PHASE SEQUENCE CHECKS:


a) AT LCC PANEL (D11+S) (CLOCK WISE):i) Bus 1A VT : :-

b.) AT PROTN.PANEL (D11+R) (CLOCK WISE) i) Bus 1A VT :

4.0) PHASING OUT CHECKS: a) SWGR SIDE (D11+S):REFERENCE FEEDER


BUS VT -2B

TESTED FEEDER BUS 1A VT (D11+S) (in Volts)

R Y B N E

Testing Instrument Details Particulars

Multimeter

Make Fluke

Type

Sr.No.

Cal. Due Date

CARRIED OUT BY Name Signature Date 13-06-2013 BOOBALAN .M

WITNESSED / APPROVED BY Name Signature Date 13-06-2013 BALA MURUGAN.P

WITNESSED / APPROVED BY Name Signature Date

SIEMENS

Samsung Engineering

PMC

You might also like