Professional Documents
Culture Documents
Cir Culvert
Invert Elev Dn (ft)
Pipe Length (ft)
Slope (%)
Invert Elev Up (ft)
Rise (in)
Shape
Span (in)
No. Barrels
n-Value
Inlet Edge
Coeff. K,M,c,Y,k
=
=
=
=
=
=
=
=
=
=
=
100.00
80.00
1.88
101.50
18.0
Cir
18.0
3
0.009
Projecting
0.0045, 2, 0.0317, 0.69, 0.5
Embankment
Top Elevation (ft)
Top Width (ft)
Crest Width (ft)
= 105.00
= 70.00
= 100.00
Calculations
Qmin (cfs)
Qmax (cfs)
Tailwater Elev (ft)
= 7.42
= 11.13
= (dc+D)/2
Highlighted
Qtotal (cfs)
Qpipe (cfs)
Qovertop (cfs)
Veloc Dn (ft/s)
Veloc Up (ft/s)
HGL Dn (ft)
HGL Up (ft)
Hw Elev (ft)
Hw/D (ft)
Flow Regime
=
=
=
=
=
=
=
=
=
=
7.42
7.42
0.00
1.87
3.74
101.05
102.10
102.33
0.55
Inlet Control
Veloc
Depth
HGL
Total
Pipe
Over
Dn
Up
Dn
Up
Dn
(cfs)
(cfs)
(cfs)
(ft/s)
(ft/s)
(in)
(in)
(ft)
7.42
7.42
0.00
1.87
3.74
12.60
7.20
101.05
7.92
7.92
0.00
1.98
3.84
12.71
7.43
101.06
8.42
8.42
0.00
2.08
3.89
12.85
7.69
101.07
8.92
8.92
0.00
2.18
3.97
12.96
7.92
101.08
9.42
9.42
0.00
2.28
4.05
13.07
8.14
101.09
9.92
9.92
0.00
2.38
4.11
13.18
8.36
101.10
10.42
10.42
0.00
2.48
4.17
13.29
8.59
101.11
10.92
10.92
0.00
2.58
4.26
13.38
8.77
101.12
HGL
Up
Hw
(ft)
(ft)
102.10
102.33
0.55
102.12
102.36
0.57
102.14
102.39
0.59
102.16
102.42
0.61
102.18
102.45
0.63
102.20
102.48
0.65
102.22
102.50
0.67
102.23
102.53
0.69
Hw/D