Many thanks for your enquiry dated 2006-10-11 and we are pleased to forward our
Quotation No. 6360.
General Conditions
1. Price : 7’560,00 : - AED on EXW Roxtec Middle East Warehouse,
Jebel Ali Free Zone basis.
2. Payment terms : 30 days Post Dated Cheque.
3. Delivery time : In Stock.
4. Validity : Until 11-11-2006.
5. Transportation Cost : Is not included. Delivery within Jebel Ali FZ is free of charge.
6. Packing : Packing costs are included. The Consignment is about 40 Kgs.
Enclosures
Kit Design (RTM1007512:1).
Technical Drawing for Roxtec S type Single Frame.
Technical Drawing for Roxtec RM Multidiameter Module.
Technical Drawing for Roxtec Stay plate.
Technical Drawing for Roxtec Wedge.
Data sheets of S-Frame for Welding Installation.
Best Regards,
Mohammed Toubasi
Sales Manager
Roxtec Middle East FZE
Client:
PROSERVE MIDDLE EAST AS
P.O. Box 16922
Jebel Ali Free Zone
Dubai
United Arab Emirates
Subtotal 8,400
2,057
Total Amount AED7,560
1
121
101
3 3 3
SPARE MODULE
2 2 2 2 2 2
2 StayPlates
3 3 RM40
2 6 RM20
1 1 Wedge
Item Qty Designation Specification
Responsible Title Projection
ROXTEC ME FZE PROSERVE ME
method
x1 x2 x3 x4 x5 x6 x7 x8 x9 x10
Höhentoleranz Breitentoleranz
DE ± 1 mm, ±0.039" ± 1 mm, ±0.039"
1 Öffnung in >1 Öffnung in
der Breite der Breite x1 x2 x3 x4 x5 x6 x7 x8 x9 x10
Rahmen (mm) (in.) (mm) (in.) (mm)/(in.)
Tolerancia en altura Tolerancia en anchura
ES ± 1 mm, ±0.039" ± 1 mm, ±0.039"
1 apertura a lo >1 apertura a lo
ancho ancho x1 x2 x3 x4 x5 x6 x7 x8 x9 x10
Marco (mm) (pulgadas) (mm) (pulgadas) (mm)/(pulgadas)
Tolérance en hauteur Tolérance en largeur
FR ± 1 mm, ±0.039" ± 1 mm, ±0.039"
1 ouverture >1 ouverture
en largeur en largeur x1 x2 x3 x4 x5 x6 x7 x8 x9 x10
Marco (mm) (pouces) (mm) (pouces) (mm)/(pouces)
Height tolerance Width tolerance
GB ± 1 mm, ±0.039" ± 1 mm, ±0.039"
1 opening in >1 opening in
width width x1 x2 x3 x4 x5 x6 x7 x8 x9 x10
Frame (mm) (in) (mm) (in) (mm)/(in)
S1 123 4.843 - - 82 - - - - - - - - -
3.228
82 - - - - - - - - -
S3 182 7.165 - -
3.228
82 - - - - - - - - -
S5 240 9.449 - -
3.228
Theoretically recommended dimensions / / Empfohlene Maße / Dimensiones teóricas recomendadas / Dimensions théoriques recommandées
45
www.roxtec.com
S, SRC, SK and SBTB frame, welding instructions
/ S-, SRC-, SK- und SBTB-Rahmen, Schweißanweisungen / Marco S, SRC, SK, SBTB, dimensiones
del hueco para instalaciones soldadas / Cadres S, SRC, SK, SBTB, dimensions d’ouverture pour des installations soudées
Tack weld 1
1 2
3 4
Heftnaht 1
Punto de soldadura 1
Voie de soudure 1
The example depicts two passes fillet-weld.
Welding pass
Start point Tack weld 3 Das Beispiel stellt zwei Lagen einer
Schweißlage Kehlnaht dar.
Soldadura Anfangspunkt Heftnaht 3
Voie de soudure Punto inicial Punto de soldadura 3
El ejemplo muestra dos pasamuros con
Start point Tack weld 2 Point de départ soudure 3
soldadura de solapa.
Anfangspunkt Heftnaht 2
Welding pass
Punto inicial Punto de soldadura 2 L’exemple décrit deux voies pour le cordon
Point de départ soudure 2 de soudure
Schweißlage
Soldadura
Voie de soudure
Important: Weld pass no. 5-6 is not to be
started until welding no. 1-4 are completed
and the temperature of welding pass
no.1-4 has cooled down to min. pre-heat
Max 2 mm, 0.079" Max 2 mm, 0.079" temperature.
59
www.roxtec.com
S, SRC, SK and SBTB frame, welding instructions
/ S-, SRC-, SK- und SBTB-Rahmen, Schweißanweisungen / Marco S, SRC, SK, SBTB, dimensiones
del hueco para instalaciones soldadas / Cadres S, SRC, SK, SBTB, dimensions d’ouverture pour des installations soudées
Wenn T2 >= T1 a <= 0.7xT1 aber max 7 mm, 0.276” Cuando T2 >= T1 a<= 0,7xT1 pero máx. 7mm; 0,276”
Wenn T2 < T1 a <= 0.7xT2 aber mind 3 mm, 0.118” Cuando T2 <T1 a <= 0,7xT2 pero mín. 7mm; 0,276”
Rahmen: mehrlagige Schweißnähte sind erforderlich Marcos: requieren una soldadura multipaso si
wenn a >= 5 mm, 0.197” a>= 5mm, 0.197”
Seal weld
Epaisseur cumulée = T1 + T2.
T2
T1
Recommended welding
positions Deck Bulkhead
Deck Schott
Cubierta Mamparo
Empfohlene Schweißpositionen. Pont Cloison
Posiciones de soldadura
recomendadas
60
www.roxtec.com
S, SRC, SK and SBTB frame, welding instructions
/ S-, SRC-, SK- und SBTB-Rahmen, Schweißanweisungen / Marco S, SRC, SK, SBTB, dimensiones
del hueco para instalaciones soldadas / Cadres S, SRC, SK, SBTB, dimensions d’ouverture pour des installations soudées
GB Mild steel welding, pre-heat temperature Aluminium welding, pre-heat temperature Stainless steel welding, no pre-heat.
50/1.969 and less 10° C, 50° F 25/0.984 and less 10° C, 50° F
80/3.150 and less 50° C, 122° F 30 – 50/1.181-1.696 50° C, 122° F
CN
50/1.969 und weniger 10° C, 50° F 25/0.984 und weniger 10° C, 50° F
80/3.150 und weniger 50° C, 122° F 30 – 50/1.181-1.696 50° C, 122° F
61
www.roxtec.com
Assembly instruction
/ Montage-Vorschriften / Instrucciones de montaje / Plan de remplissage
All our products come with an assembly instruction. These are also available at www.roxtec.com
Bei jedem unserer Produkte liefern wir die Montage-Vorschriften mit. Sie können diese auch auf unserer
Internetseite www.roxtec.com abrufen.
Tous nos produits sont fournis avec des instructions de montage. Elles sont également disponibles sur le
site www.roxtec.com
Remove any dirt inside the Lubricate the inside faces of the Adapt those modules which are Try to achieve a 0,1–1 mm gap
frame. frame. Make sure to get to hold cables or pipes by between the two halves when
lubricant into the corner. peeling off layers. held against the cable/pipe.
x2
Lubricate the modules tho- Insert the modules according to Insert a stayplate on top of Before inserting the final row of
roughly with Roxtec lubricant, your transit plan. Start with the every finished row of modules. modules, insert two stayplates.
both the inside and outside largest modules.
faces.
Separate the two stayplates and Drop the upper stayplate on top Lubricate and insert the wedge Tighten the screws until stop
insert the final row of modules of the modules. on top of the frame (standard (approx. 20 Nm (15 ft.lb.))
between the stayplates. position).
206
www.roxtec.com