PENDING VOLUME
CONCERNED
DEPT.
NO.
URGENT
SUB. DATE
NO OF ITEMS
WEIGHT(%)
Process
-1.1%
6-May-13
ME & MA
-0.8%
6-May-13
Civil
-1.1%
6-May-13
Instrument
-4.1%
6-May-13
Process
-1.0%
6-May-13
ME & MA
-0.9%
6-May-13
Civil
-1.0%
6-May-13
Instrument
-4.3%
6-May-13
Process
15
-1.9%
6-May-13
ME & MA
26
-4.6%
6-May-13
Civil
-0.1%
6-May-13
Instrument
-1.8%
6-May-13
Process
-1.6%
6-May-13
ME & MA
-1.2%
6-May-13
Civil
-1.9%
6-May-13
Instrument
-3.0%
6-May-13
Process
-3.0%
6-May-13
ME & MA
25
-10.6%
6-May-13
Civil
-0.3%
6-May-13
Instrument
-4.1%
6-May-13
Process
-0.4%
6-May-13
ME & MA
15
-2.8%
6-May-13
Civil
-0.5%
6-May-13
Instrument
-3.1%
6-May-13
Process
-0.5%
6-May-13
ME & MA
-2.1%
6-May-13
Civil
-0.4%
6-May-13
Instrument
-4.1%
6-May-13
Process
-0.8%
6-May-13
ME & MA
-1.2%
6-May-13
Civil
-0.4%
6-May-13
REMARK
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Planning
10
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
40.0%
50.0%
40.0%
60.0%
40.0%
% PROGRESS
70.0%
40.0%
15
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
24.8%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
19.9%
19.9%
12-May
5-May
19-May
19
28-Apr
0.0%
21-Apr
10.0%
19.3%
20.0%
24.8%
30.0%
23.2
PLAN
100.0%
ACTUAL
24.8%
DELAY =
75.2%
23.3A
PIPING DESIGN INPUT DELAY AREAS
WORK VOLUMN
NO.
AREA
INPUT
PROGRESS STATUS
WEIGHT
PLAN
ACTUAL
(%)
(%)
(%)
AHEAD/
DELAY
REMARK
14.1
22 items
10.0%
10.0%
2.9%
/ 7.1%
Instrument
-3.9%
6-May-13
14.2
21 items
10.0%
10.0%
2.9%
/ 7.1%
Process
61
-4.0%
6-May-13
10
51 items
10.0%
10.0%
1.6%
/ 8.4%
ME & MA
0.0%
15
OIL STORAGE
30 items
10.0%
10.0%
2.3%
/ 7.7%
Civil
25
-1.7%
6-May-13
19
44 items
20.0%
20.0%
2.0%
/ 18%
Instrument
-0.9%
6-May-13
29 items
10.0%
10.0%
3.2%
/ 6.8%
Process
106
-14.3%
6-May-13
ME & MA
93
-24.3%
6-May-13
Civil
57
-7.4%
6-May-13
Instrument
80
-29.2%
6-May-13
336
-75.2%
23.2
22 items
10.0%
10.0%
2.9%
/ 7.1%
23 items
10.0%
10.0%
3.7%
/ 6.3%
11
94 items
10.0%
10.0%
3.4%
/ 6.6%
SUMMARY
23.3A
11
336 items
100.0%
100.0%
24.8%
SUMMARY OVERALL
PENDING
/ 75.2%
GENERAL NOTE
1. LE/AE SHALL UTILIZE THIS REPORT TO MONITOR AND CONTROL THE PROGRESS OF YOUR ACTIVITY AS PER SPECIFIED
THE ABOVE RIGHT TABLE.
CUSTOMER :
VINACHEM
26-April-2013
FOR REVIEW
L.N.NGHIA
T.T.BINH
T.T.BINH
V.P.TUNG
PLANT :
DAP2-VINACHEM PROJECT
REV.
DATE
DESCRIPTION
MADE BY
CHECKED
LEAD
CHIEF
JOB NO:
VD116
2. LE/AE SHALL STRONGLY EXPEDITE ANY PENDING ITEMS AS PER AS SHOWN IN RIGHT TABLE TO MEET THE TARGET SCHEDULE.
3. LE/AE SHALL UPDATE THIS REPORT AS WEEKLY BASIS IN ORDER TO CLOSE MONITOR / ANALYZE ACTUAL PROGRESS
AND PROBLEM THEN TAKE COUNTERMEASURE.
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
Related to 90% 3D
Model & Plot Plan
AFC
ATTACHMENT - A
% PROGRESS
FOR AFC
14.2
1
2
3
4
5
6
7
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
Catalogue of TG
Instrument
Catalogue of LG
Instrument
Catalogue of PT
Instrument
Catalogue of LSH
Instrument
Instrument
Instrument
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
22-Feb-13
18-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
24-Jan-13
18-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
24-Jan-13
18-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
7-Dec-12
12-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
11-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
15-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
15-Jun-12
1-Apr-13
6-May-13
13-May-13
100%
28-Jun-12
18-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
40%
0%
80%
80%
80%
80%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.5%
Civil
1-Apr-13
40%
0.5%
100%
0.5%
Civil
24-Dec-12
13-May-13
III
0.5%
6-May-13
40%
0.5%
Civil
1-Apr-13
100%
0.2%
0.5%
16-Apr-13
13-May-13
III
0.2%
0.5%
Civil
6-May-13
40%
0.2%
0.5%
22
1-Apr-13
100%
0.2%
0.2%
0.5%
21
Civil
16-Apr-13
13-May-13
III
0.0%
0.5%
20
6-May-13
40%
0.4%
0.5%
19
Civil
1-Apr-13
100%
0.2%
0.4%
0.5%
18
29-Mar-13
13-May-13
III
0.4%
0.5%
17
ME & MA
6-May-13
40%
0.4%
0.5%
16
1-Apr-13
100%
0.2%
0.0%
0.5%
15
ME & MA
1-Mar-13
13-May-13
III
0.0%
0.5%
14
6-May-13
40%
0.0%
0.5%
13
ME & MA
1-Apr-13
100%
0.0%
0.5%
12
22-Feb-13
13-May-13
0.0%
0.5%
11
Process
6-May-13
III
0.0%
0.5%
10
1-Apr-13
100%
0.0%
0.5%
Process
26-Mar-13
13-May-13
0.0%
0.5%
6-May-13
0.0%
Process
Process
Process
Process
ME & MA
ME & MA
ME & MA
40%
40%
40%
80%
40%
40%
40%
III
III
III
III
III
III
III
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
10.0%
0.5%
Process
1-Apr-13
0.2%
0.5%
0.2%
0.2%
0.5%
Process
40%
0.2%
0.5%
11-Mar-13
0.4%
0.5%
: 1st ISSUE
: PLANNING SCHEDULE
: 2nd ISSUE
: 3rd ISSUE
WEEK 20
WEEK 21
9-May
11-May
12-May
13-May
14-May
15-May
16-May
17-May
18-May
19-May
20-May
21-May
22-May
23-May
24-May
25-May
19
20
20
20
20
20
20
20
21
21
21
21
21
21
21
8-May
10-May
7-May
19
19
6-May
19
19
5-May
10.0%
A
0.2%
0.5%
100.0%
0.2%
0.5%
: ACTUAL SCHEDULE
III
TOTAL
14.1
19
II
4-May
100%
19
20%
3-May
10%
40%
18
20%
40%
2-May
20%
18
10%
ON SCH.
/ DELAY
1-May
20%
WT
18
20%
30-Apr
10%
18
15%
29-Apr
10%
18
10%
28-Apr
15%
18
10%
WEEK 19
27-Apr
10%
WEEK 18
18
10%
: START
MAY
WEEK 17
26-Apr
10%
ACC.
17
OFFICAL
25-Apr
FINAL
17
DRAFT
24-Apr
OFFICAL
17
FINAL
23-Apr
DRAFT
17
OFFICAL
22-Apr
FINAL
17
DRAFT
TIME SCHEDULE
APR.
21-Apr
FOR AFD
17
FOR AFP
17
WORK ACTIVITY
S
T
A
R
T
WT
PROJECT NAME:
DEPARTMENT:
START DAY:
REPORT DAY:
REPORT WEEK:
VD116
DAP2-VINACHEM PROJECT
Planing & Piping
21-Feb-13
21-Sep-13
38
RESPONSIBILTY
SECTION
0.2%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
DRAFT
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
FINAL
days
OFFICAL
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
OVER DATE:
days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
/ 60%
15 days
OVER DATE:
days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
days
Kindly requested to provide this input within:
days
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
days
Kindly requested to provide this input within:
days
DEPT.: Civil
days
/ 20%
/ 20%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 60%
/ 60%
OVER DATE:
days
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
days
131 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
OVER DATE:
131 days
6-May-13
DEPT.: Process
131 days
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 20%
DEPT.: Process
OVER DATE:
days
Kindly requested to provide this input within:
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
131 days
days
131 days
131 days
131 days
131 days
Page 2 of 16
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Instrument
24-Apr-13
24-Apr-13
1-Apr-13
6-May-13
25-Mar-13
80%
80%
III
III
III
40%
III
1-Apr-13
6-May-13
13-May-13
A
P
0%
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
11-Mar-13
1-Apr-13
2-Apr-13
1-Apr-13
24-Apr-13
1-Apr-13
24-Apr-13
1-Apr-13
14-Mar-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
22-Apr-13
1-Apr-13
22-Apr-13
1-Apr-13
22-Apr-13
1-Apr-13
22-Apr-13
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
0.5%
0.5%
0.5%
25-May
24-May
23-May
22-May
21-May
20-May
19-May
18-May
17-May
16-May
15-May
14-May
13-May
12-May
11-May
9-May
10-May
8-May
7-May
6-May
5-May
4-May
3-May
2-May
1-May
30-Apr
29-Apr
28-Apr
27-Apr
26-Apr
25-Apr
24-Apr
23-Apr
DEPT.: Civil
/ 60%
/ 60%
III
III
III
III
III
III
III
III
III
138 days
131 days
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
OVER DATE:
23 days
DEPT.: Civil
OVER DATE:
23 days
OVER DATE:
days
131 days
6-May-13
days
131 days
days
/ 20%
0.2%
8 days
6-May-13
DEPT.: Civil
/ 20%
OVER DATE:
131 days
6-May-13
138 days
131 days
/ 60%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
6-May-13
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
10.0%
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
ME & MA
ME & MA
ME & MA
0.5%
0.5%
22-Apr
0.4%
100%
1-Apr-13
0.4%
WEEK 21
#
#
#
#
#
#
#
#
#
#
#
#
6-May-13
WEEK 20
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
24-Apr-13
1-Apr-13
40%
III
0.5%
24-Apr-13
0.2%
WEEK 19
100%
WT
13-May-13
6-May-13
0.5%
100%
1-Apr-13
0.5%
13-May-13
25-Mar-13
0.5%
100%
0.2%
0.5%
13-May-13
40%
0.5%
100%
II
0.5%
Instrument
13-May-13
1-Apr-13
ON SCH.
/ DELAY
WEEK 18
III
0.5%
6-May-13
9-Apr-13
100%
0.5%
Instrument
20%
0.5%
Catalogue of LSH
10%
40%
0.5%
Instrument
20%
40%
0.5%
Catalogue of PT
20%
0.5%
Instrument
10%
40%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
A
P
0%
0%
40%
40%
40%
40%
40%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.2%
Catalogue of LG
20%
WT
0.1%
0.2%
Instrument
20%
0.1%
0.2%
Catalogue of TG
10%
0.1%
0.2%
Instrument
15%
0.1%
0.2%
10
Catalogue of PG
10%
0.1%
0.2%
21
Instrument
10%
0.1%
0.2%
20
Catalogue of PV
15%
0.1%
0.2%
19
Instrument
10%
Catalogue of PSV
10%
0.1%
0.2%
18
Civil
10%
0.1%
0.2%
17
10%
MAY
WEEK 17
0.1%
0.2%
16
Civil
OFFICAL
0.1%
0.2%
15
FINAL
0.1%
0.2%
14
Civil
DRAFT
0.0%
0.2%
13
OFFICAL
0.0%
0.2%
12
Civil
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.1%
0.2%
11
FOR AFC
OFFICAL
0.1%
0.2%
10
Civil
FOR AFD
FINAL
0.1%
0.2%
FOR AFP
DRAFT
0.1%
0.2%
S
T
A
R
T
% PROGRESS
0.5%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.1%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
DEPT.: Process
OVER DATE:
1 days
138 days
OVER DATE:
23 days
131 days
6-May-13
131 days
6-May-13
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
23 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
days
131 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
3 days
131 days
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
21 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
21 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
21 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
21 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
21 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
Page 3 of 16
26
27
28
29
6-May-13
13-May-13
100%
30
1-Apr-13
6-May-13
13-May-13
100%
31
1-Apr-13
6-May-13
13-May-13
100%
32
1-Apr-13
6-May-13
13-May-13
100%
33
1-Apr-13
6-May-13
13-May-13
100%
34
1-Apr-13
6-May-13
13-May-13
100%
35
1-Apr-13
6-May-13
13-May-13
100%
36
1-Apr-13
6-May-13
13-May-13
100%
37
1-Apr-13
6-May-13
13-May-13
100%
38
1-Apr-13
6-May-13
13-May-13
100%
39
1-Apr-13
6-May-13
13-May-13
100%
40
1-Apr-13
6-May-13
13-May-13
100%
41
1-Apr-13
6-May-13
13-May-13
100%
42
4-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
43
1-Apr-13
6-May-13
13-May-13
100%
44
1-Apr-13
6-May-13
13-May-13
100%
45
1-Apr-13
6-May-13
13-May-13
100%
46
1-Apr-13
6-May-13
13-May-13
100%
47
1-Apr-13
6-May-13
13-May-13
100%
48
1-Apr-13
6-May-13
13-May-13
100%
49
1-Apr-13
6-May-13
13-May-13
100%
50
1-Apr-13
6-May-13
13-May-13
100%
51
1-Apr-13
6-May-13
13-May-13
100%
15
1
2-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
Civil
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
Catalogue of TG
Instrument
Catalogue of LG
Instrument
Catalogue of PT
Instrument
Catalogue of LSH
Instrument
Instrument
Instrument
0%
0%
40%
40%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
40%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
OIL STORAGE
Process datasheet for Fuel Oil Tank (15-V001)
Process
25-May
1-Apr-13
0.1%
24-May
100%
23-May
13-May-13
22-May
6-May-13
21-May
1-Apr-13
20-May
16-Apr-13
ME & MA
19-May
0.1%
18-May
100%
WEEK 21
17-May
13-May-13
16-May
6-May-13
15-May
1-Apr-13
14-May
16-Apr-13
ME & MA
13-May
0.0%
12-May
100%
11-May
13-May-13
9-May
6-May-13
WEEK 20
10-May
1-Apr-13
0%
8-May
0.0%
7-May
100%
6-May
13-May-13
0%
5-May
6-May-13
ME & MA
4-May
1-Apr-13
0.0%
3-May
100%
2-May
13-May-13
0%
1-May
6-May-13
ME & MA
30-Apr
1-Apr-13
0.0%
29-Apr
100%
28-Apr
13-May-13
0%
27-Apr
6-May-13
ME & MA
26-Apr
1-Apr-13
0.0%
25-Apr
100%
24-Apr
13-May-13
23-Apr
6-May-13
22-Apr
1-Apr-13
0.0%
II
WEEK 19
A
Vendor Print for Regeneration pump for Anion and
ME & MA
Mixed Bed Exchanger (10-P007)
P
WT
100%
0.2%
13-May-13
0.2%
6-May-13
ON SCH.
/ DELAY
WEEK 18
III
0%
0.2%
1-Apr-13
ME & MA
0.2%
0.0%
0.2%
100%
0.2%
13-May-13
0.2%
6-May-13
0.2%
1-Apr-13
ME & MA
100%
0.2%
20%
0.2%
10%
40%
0.2%
20%
40%
0.2%
20%
0.2%
10%
0.2%
20%
WT
0.2%
20%
0.2%
10%
0.2%
15%
0.2%
10%
0.2%
10%
0.2%
15%
0.2%
10%
0.2%
10%
0.2%
10%
0.2%
10%
MAY
WEEK 17
0.2%
OFFICAL
0.2%
FINAL
0.2%
DRAFT
0.2%
OFFICAL
0.2%
25
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.2%
24
FOR AFC
OFFICAL
0.2%
23
FOR AFD
FINAL
0.2%
22
FOR AFP
40%
III
0.3%
21
S
T
A
R
T
% PROGRESS
DRAFT
20
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
10.0%
0.1%
0.3%
/ 100%
/ 100%
/ 100%
/ 100%
173 days
138 days
131 days
6-May-13
6-May-13
173 days
138 days
173 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
/ 60%
173 days
15 days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 100%
6-May-13
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
173 days
173 days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
6-May-13
173 days
138 days
173 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 60%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 60%
173 days
131 days
131 days
138 days
131 days
6-May-13
6-May-13
173 days
131 days
138 days
131 days
6-May-13
6-May-13
173 days
131 days
138 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
DEPT.: Process
OVER DATE:
1 days
138 days
Kindly requested to provide this input within:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
Page 4 of 16
19
1
2
3
4
Civil
Civil
Civil
Civil
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
Catalogue of TG
Instrument
Catalogue of LG
Instrument
Catalogue of PT
Instrument
Catalogue of LSH
Instrument
Instrument
Instrument
100%
40%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
15-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
17-Sep-12
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
13-Dec-12
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
5-Apr-13
1-Apr-13
1-Apr-13
0%
0%
0%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
Process
Process
Process
Process
40%
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
40%
A
P
0%
A
P
25-May
24-May
23-May
22-May
21-May
20-May
19-May
18-May
0.0%
WEEK 21
17-May
0.0%
16-May
0.0%
15-May
0.0%
14-May
0.0%
13-May
0.0%
12-May
0.0%
11-May
0.0%
9-May
0.0%
WEEK 20
10-May
0.0%
8-May
0.1%
7-May
0.1%
6-May
0.1%
5-May
0.1%
4-May
0.1%
3-May
0.1%
2-May
0.1%
1-May
0.1%
30-Apr
0.1%
29-Apr
0.1%
28-Apr
0.1%
27-Apr
0.1%
26-Apr
0.1%
25-Apr
0.1%
24-Apr
0.1%
23-Apr
0.0%
22-Apr
0.0%
II
WEEK 19
WT
Civil
0.3%
0.3%
Civil
13-May-13
0.3%
6-May-13
0.3%
29
Civil
1-Apr-13
0.0%
0.3%
28
2-Apr-13
P
P
ON SCH.
/ DELAY
WEEK 18
III
A
A
0.1%
0.3%
27
Civil
100%
0.3%
26
20%
0.3%
25
Civil
10%
40%
0.3%
24
20%
40%
0.3%
23
ME & MA
20%
0.3%
22
10%
0.3%
21
ME & MA
20%
WT
0.3%
20
20%
0.3%
19
ME & MA
10%
0.3%
18
15%
0.3%
17
ME & MA
10%
0.3%
16
10%
0.3%
15
ME & MA
15%
0.3%
14
10%
0.3%
13
ME & MA
10%
0.3%
12
10%
MAY
WEEK 17
0.3%
11
Process
10%
ACC.
0.3%
10
OFFICAL
0.3%
Process
FINAL
0.3%
DRAFT
0.3%
Process
OFFICAL
0.3%
FINAL
0.3%
Process
TIME SCHEDULE
APR.
DRAFT
0%
III
III
III
III
0.5%
FOR AFC
OFFICAL
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
20.0%
0.2%
0.5%
0.5%
Process
FOR AFD
FINAL
0.2%
0.5%
FOR AFP
DRAFT
0.0%
0.5%
S
T
A
R
T
% PROGRESS
0.3%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.0%
0.5%
0.5%
0.5%
/ 60%
/ 100%
/ 100%
/ 100%
DEPT.: Process
OVER DATE:
1 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
173 days
138 days
OVER DATE:
173 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
14 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
6-May-13
/ 60%
/ 60%
15 days
15 days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
15 days
OVER DATE:
days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
OVER DATE:
days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
/ 60%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
DEPT.: Civil
OVER DATE:
days
131 days
131 days
138 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Civil
OVER DATE:
173 days
131 days
138 days
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
4 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
131 days
131 days
131 days
131 days
Page 5 of 16
11
12
13
14
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
15
11-Apr-13
11-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16
11-Apr-13
11-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
17
A
Equipment Drawing for 1st ESP Rotary Valve (19ME & MA
RV204A)
P
1-Apr-13
6-May-13
13-May-13
100%
18
A
Equipment Drawing for 2nd ESP Rotary Valve (19ME & MA
RV204B)
P
1-Apr-13
6-May-13
13-May-13
100%
19
A
Equipment Drawing for 3rd ESP Rotary Valve (19ME & MA
RV204C)
P
1-Apr-13
6-May-13
13-May-13
100%
20
1-Apr-13
6-May-13
13-May-13
100%
21
1-Apr-13
6-May-13
13-May-13
100%
22
1-Apr-13
6-May-13
13-May-13
100%
23
A
Equipment Drawing for ESP Drag Chain Conveyor
ME & MA
(19-L203)
P
1-Apr-13
6-May-13
13-May-13
100%
24
1-Apr-13
6-May-13
13-May-13
100%
25
1-Apr-13
6-May-13
13-May-13
100%
26
1-Apr-13
6-May-13
13-May-13
100%
27
A
Equipment Drawing for Chain Bucket Elevator (19ME & MA
L207)
P
1-Apr-13
6-May-13
13-May-13
100%
28
1-Apr-13
6-May-13
13-May-13
100%
29
1-Apr-13
6-May-13
13-May-13
100%
30
1-Apr-13
6-May-13
13-May-13
100%
31
1-Apr-13
6-May-13
13-May-13
100%
32
1-Apr-13
6-May-13
13-May-13
100%
33
1-Apr-13
6-May-13
13-May-13
100%
34
1-Apr-13
6-May-13
13-May-13
100%
35
36
37
38
ME & MA
Process
Process
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
Chimney (19-ST201)
Civil
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
40%
0%
0%
0%
40%
80%
80%
0%
0%
0%
A
P
0%
A
P
0%
0%
0%
A
P
0%
A
P
0%
0%
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
4-Jan-13
1-Apr-13
6-May-13
13-May-13
100%
40%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
A
P
0%
A
P
0%
A
P
0.2%
0.4%
0.4%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.0%
0.0%
25-May
0.0%
24-May
100%
23-May
13-May-13
22-May
6-May-13
40%
21-May
1-Apr-13
ME & MA
20-May
0.0%
19-May
100%
18-May
13-May-13
40%
WEEK 21
17-May
6-May-13
ME & MA
16-May
1-Apr-13
0.0%
15-May
100%
14-May
13-May-13
0%
13-May
6-May-13
ME & MA
12-May
1-Apr-13
0.2%
11-May
100%
9-May
13-May-13
WEEK 20
10-May
6-May-13
8-May
1-Apr-13
7-May
16-Apr-13
ME & MA
6-May
0.2%
5-May
100%
4-May
13-May-13
3-May
6-May-13
2-May
1-Apr-13
1-May
16-Apr-13
ME & MA
30-Apr
0.2%
29-Apr
100%
28-Apr
13-May-13
27-Apr
6-May-13
26-Apr
1-Apr-13
25-Apr
16-Apr-13
ME & MA
24-Apr
0.0%
23-Apr
100%
22-Apr
13-May-13
0.0%
II
WEEK 19
6-May-13
0%
WT
1-Apr-13
Process
0.5%
0.5%
100%
0.5%
13-May-13
ON SCH.
/ DELAY
WEEK 18
III
0%
0.5%
6-May-13
Process
0.5%
1-Apr-13
0.0%
0.5%
100%
0.5%
13-May-13
0.5%
6-May-13
0.5%
1-Apr-13
Process
100%
0.5%
20%
0.5%
10%
40%
0.5%
20%
40%
0.5%
20%
0.5%
10%
0.5%
20%
WT
0.5%
20%
0.5%
10%
0.5%
15%
0.5%
10%
0.5%
10%
0.5%
15%
0.5%
10%
0.5%
10%
0.5%
10%
0.5%
10%
MAY
WEEK 17
0.5%
OFFICAL
0.5%
FINAL
0.5%
DRAFT
0.5%
OFFICAL
0.5%
10
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.5%
FOR AFC
OFFICAL
0.5%
FOR AFD
FINAL
0.5%
FOR AFP
0.5%
S
T
A
R
T
% PROGRESS
DRAFT
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
/ 100%
/ 100%
/ 100%
/ 60%
DEPT.: Process
OVER DATE:
173 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
173 days
138 days
15 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 100%
/ 100%
173 days
173 days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 100%
6-May-13
/ 60%
6-May-13
/ 20%
/ 20%
/ 100%
/ 100%
/ 100%
DEPT.: Process
OVER DATE:
10 days
OVER DATE:
10 days
131 days
days
131 days
131 days
6-May-13
days
131 days
6-May-13
6-May-13
173 days
138 days
173 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
173 days
131 days
131 days
138 days
131 days
6-May-13
6-May-13
173 days
131 days
138 days
131 days
6-May-13
6-May-13
173 days
131 days
138 days
131 days
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
6-May-13
/ 100%
/ 100%
/ 60%
/ 100%
/ 100%
/ 100%
173 days
131 days
131 days
131 days
131 days
131 days
131 days
138 days
131 days
6-May-13
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
131 days
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
Page 6 of 16
6-May-13
13-May-13
100%
11-Mar-13
1-Apr-13
11-Mar-13
1-Apr-13
A
Assembly Drawing of Bulk DAP dedusting fan (23ME & MA
C201)
P
16-Apr-13
22
23
24
25
26
27
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
Civil
Civil
Civil
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
Catalogue of TG
Instrument
Catalogue of LG
Instrument
Catalogue of PT
Instrument
Catalogue of LSH
Instrument
16-Apr-13
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
25-Feb-13
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
18-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
4-Mar-13
24-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
4-Mar-13
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
40%
80%
80%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
80%
80%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.3%
21
ME & MA
100%
0.3%
20
13-May-13
0.1%
0.3%
19
ME & MA
6-May-13
III
0.1%
0.3%
18
1-Apr-13
40%
0.3%
0.3%
17
ME & MA
100%
0.3%
0.3%
16
13-May-13
0.1%
0.1%
0.3%
15
ME & MA
6-May-13
III
0.1%
0.3%
14
100%
0.1%
0.3%
13
Process
13-May-13
0.1%
0.3%
12
Equipment list
6-May-13
0.1%
0.3%
11
Process
0.1%
0.3%
10
0.1%
0.3%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
Instrumen
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
DEPT.:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
10.0%
40%
0.1%
0.3%
0.5%
0.1%
0.3%
0.0%
0.1%
0.3%
III
0.5%
0.1%
0.3%
III
0.5%
0.1%
0.3%
III
0.5%
0.3%
0.3%
III
0.5%
0.3%
0.3%
III
0.5%
0.0%
0.3%
0%
III
0.0%
0.3%
23.2
0%
25-May
1-Apr-13
Instrument
24-May
0.0%
23-May
100%
22-May
13-May-13
0%
21-May
6-May-13
Instrument
20-May
1-Apr-13
0.0%
19-May
100%
18-May
13-May-13
0%
17-May
6-May-13
Instrument
16-May
1-Apr-13
Catalogue of LSH
0.0%
15-May
100%
14-May
13-May-13
0%
13-May
6-May-13
Instrument
12-May
1-Apr-13
Catalogue of PT
0.0%
11-May
100%
9-May
13-May-13
WEEK 21
III
0%
WEEK 20
10-May
6-May-13
Instrument
8-May
1-Apr-13
Catalogue of LG
0.0%
7-May
100%
6-May
13-May-13
5-May
6-May-13
II
4-May
1-Apr-13
Instrument
100%
3-May
20%
2-May
10%
40%
1-May
20%
40%
30-Apr
20%
WEEK 19
10%
ON SCH.
/ DELAY
28-Apr
20%
WT
27-Apr
20%
WEEK 18
26-Apr
10%
25-Apr
15%
24-Apr
10%
23-Apr
10%
22-Apr
15%
21-Apr
10%
WT
10%
0.5%
10%
0.5%
10%
MAY
WEEK 17
0.5%
OFFICAL
0.5%
FINAL
0.5%
DRAFT
0.5%
OFFICAL
0.0%
0.3%
44
APR.
FINAL
Catalogue of TG
TIME SCHEDULE
ACC.
DRAFT
0.0%
0.3%
43
FOR AFC
OFFICAL
0.0%
0.3%
42
FOR AFD
FINAL
0.0%
0.3%
41
FOR AFP
0.0%
0.3%
40
S
T
A
R
T
% PROGRESS
DRAFT
39
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.0%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
0.3%
/ 60%
/ 60%
/ 60%
/ 20%
/ 20%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
OVER DATE:
days
131 days
6-May-13
138 days
131 days
6-May-13
6-May-13
15 days
days
days
131 days
131 days
6-May-13
days
131 days
6-May-13
6-May-13
15 days
138 days
days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 60%
6-May-13
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
days
days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
6-May-13
15 days
131 days
138 days
131 days
6-May-13
6-May-13
days
131 days
138 days
131 days
6-May-13
/ 60%
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
days
Kindly requested to provide this input within:
days
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
days
Kindly requested to provide this input within:
days
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
131 days
131 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
Page 7 of 16
Instrument
Instrument
APR.
ACC.
4-Aug-12
1-Apr-13
11-Mar-13
1-Apr-13
16-Apr-13
0%
III
III
9
1
2
3
4
5
6
7
8
Catalogue of PSV
Instrument
Catalogue of PV
Instrument
Catalogue of PG
Instrument
Catalogue of TG
Instrument
Catalogue of LG
Instrument
Catalogue of PT
Instrument
Catalogue of LSH
Instrument
Instrument
Instrument
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
25-Feb-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
27-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
4-Mar-13
24-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
4-Mar-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
11-Mar-13
1-Apr-13
5-Dec-12
1-Apr-13
5-Dec-12
1-Apr-13
16-Apr-13
40%
40%
40%
40%
III
III
III
III
40%
III
40%
III
80%
40%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
III
III
III
III
III
III
III
III
III
III
III
0.5%
Civil
16-Apr-13
III
0.5%
80%
0.5%
Civil
100%
0.5%
13-May-13
0.5%
ME & MA
6-May-13
0.4%
0.5%
16-Apr-13
1-Apr-13
0.4%
0.2%
0.5%
ME & MA
27-Mar-13
III
0.2%
0.5%
80%
0.2%
0.5%
22
ME & MA
100%
0.2%
0.5%
21
13-May-13
0.2%
0.5%
20
ME & MA
6-May-13
0.2%
0.5%
19
16-Apr-13
1-Apr-13
0.2%
0.4%
0.5%
18
ME & MA
25-Feb-13
III
0.2%
0.5%
17
40%
0.0%
0.5%
16
ME & MA
100%
0.0%
0.5%
15
13-May-13
0.2%
0.0%
0.5%
14
ME & MA
6-May-13
III
0.0%
0.5%
13
1-Apr-13
40%
0.0%
0.5%
12
ME & MA
100%
0.0%
0.5%
11
13-May-13
0.2%
0.0%
0.5%
10
ME & MA
6-May-13
III
0.0%
0.0%
/ 100%
Instrumen
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
DEPT.:
131 days
6-May-13
131 days
6-May-13
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
/ 60%
/ 60%
/ 60%
/ 20%
/ 20%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
days
138 days
DEPT.: Process
OVER DATE:
days
/ 20%
/ 60%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
131 days
6-May-13
138 days
131 days
6-May-13
6-May-13
days
days
15 days
131 days
6-May-13
days
131 days
days
131 days
6-May-13
138 days
131 days
6-May-13
6-May-13
days
days
days
15 days
DEPT.: Civil
OVER DATE:
days
131 days
6-May-13
138 days
131 days
138 days
131 days
6-May-13
138 days
131 days
6-May-13
138 days
0.5%
0.5%
OVER DATE:
0.5%
0.5%
DEPT.: Process
131 days
6-May-13
days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
10.0%
Process
Process
Process
ME & MA
ME & MA
ME & MA
ME & MA
ME & MA
0.5%
40%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
16-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
40%
40%
40%
80%
80%
40%
40%
III
III
III
III
III
III
III
III
0.4%
100%
0.2%
0.4%
Process
13-May-13
0.2%
0.4%
Equipment list
6-May-13
0.2%
0.4%
Process
0.2%
0.4%
0.3%
0.4%
/ 100%
10.0%
40%
0.3%
0.4%
0.3%
0.2%
0.4%
0.3%
0.5%
25-May
0.0%
24-May
100%
23-May
13-May-13
22-May
6-May-13
21-May
1-Apr-13
20-May
III
0%
0.0%
19-May
100%
18-May
13-May-13
WEEK 21
17-May
6-May-13
II
16-May
1-Apr-13
100%
15-May
20%
14-May
10%
40%
12-May
20%
40%
11-May
20%
WEEK 20
10%
ON SCH.
/ DELAY
10-May
20%
WT
8-May
20%
7-May
10%
6-May
15%
5-May
10%
4-May
10%
WEEK 19
3-May
15%
2-May
10%
1-May
10%
30-Apr
10%
WEEK 18
29-Apr
10%
MAY
WEEK 17
28-Apr
OFFICAL
27-Apr
FINAL
26-Apr
DRAFT
25-Apr
OFFICAL
24-Apr
FINAL
23-Apr
DRAFT
22-Apr
OFFICAL
13-May
FOR AFC
TIME SCHEDULE
21-Apr
FOR AFD
FINAL
WT
29
FOR AFP
DRAFT
0.3%
28
S
T
A
R
T
% PROGRESS
0.3%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.2%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
6-May-13
/ 20%
days
6-May-13
/ 20%
days
/ 60%
6-May-13
/ 60%
6-May-13
131 days
131 days
131 days
131 days
131 days
131 days
6-May-13
131 days
131 days
Page 8 of 16
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
16-Apr-13
1-Apr-13
6-May-13
22-Mar-13
15-Apr-13
1-Apr-13
6-May-13
22-Mar-13
15-Apr-13
1-Apr-13
6-May-13
22-Mar-13
15-Apr-13
1-Apr-13
6-May-13
22-Mar-13
15-Apr-13
1-Apr-13
6-May-13
22-Mar-13
15-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Mar-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
28-Feb-13
1-Apr-13
13-Mar-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
13-Mar-13
1-Apr-13
40%
80%
80%
80%
80%
80%
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
WEEK 20
WEEK 21
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
/ 60%
/ 20%
/ 20%
/ 20%
/ 20%
/ 20%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
24-May
23-May
22-May
21-May
20-May
19-May
18-May
17-May
16-May
15-May
14-May
13-May
12-May
11-May
9-May
10-May
8-May
7-May
6-May
5-May
4-May
25-May
15 days
138 days
days
DEPT.: Civil
days
OVER DATE:
days
OVER DATE:
days
131 days
6-May-13
days
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
days
days
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
Instrumen
DEPT.:
OVER DATE:
173 days
138 days
t
Kindly requested to provide this input within:
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
10.0%
Equipment List
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
3-May
0.0%
2-May
0.0%
1-May
0.0%
30-Apr
0.0%
29-Apr
0.0%
28-Apr
0.0%
27-Apr
0.0%
26-Apr
0.0%
25-Apr
0.0%
24-Apr
0.3%
WEEK 19
III
0.3%
23-Apr
100%
0.3%
II
WEEK 18
13-May-13
0.3%
ON SCH.
/ DELAY
21-Apr
100%
WT
13-May-13
0.4%
100%
0.4%
Instrument
13-May-13
0.3%
0.4%
100%
0.4%
Instrument
13-May-13
0.2%
0.4%
100%
0.4%
Instrument
13-May-13
100%
0.4%
Catalogue of LSH
20%
0.4%
Instrument
10%
40%
0.4%
Catalogue of PT
20%
40%
0.4%
Instrument
20%
0.4%
Catalogue of LG
10%
0.4%
Instrument
20%
WT
0.4%
Catalogue of TG
20%
0.4%
Instrument
10%
40%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.1%
Catalogue of PG
15%
0.0%
0.1%
Instrument
10%
0.0%
0.1%
11
Catalogue of PV
10%
0.0%
0.1%
23
Instrument
15%
0.0%
0.1%
22
Catalogue of PSV
10%
0.0%
0.1%
21
Civil
10%
0.0%
0.1%
20
10%
0.0%
0.1%
19
Civil
10%
MAY
WEEK 17
0.0%
0.1%
18
OFFICAL
0.0%
0.1%
17
Civil
FINAL
0.0%
0.1%
16
DRAFT
0.0%
0.1%
15
Civil
OFFICAL
0.0%
0.1%
14
APR.
FINAL
0.0%
0.1%
13
Civil
TIME SCHEDULE
ACC.
DRAFT
0.0%
0.1%
12
FOR AFC
OFFICAL
0.0%
0.1%
11
ME & MA
FOR AFD
FINAL
0.0%
0.1%
10
FOR AFP
DRAFT
0.0%
0.1%
S
T
A
R
T
% PROGRESS
0.4%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
0.0%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
DEPT.: Process
OVER DATE:
days
138 days
OVER DATE:
days
131 days
6-May-13
131 days
6-May-13
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
days
131 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
days
131 days
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
131 days
Page 9 of 16
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
Process
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
4-Apr-13
1-Apr-13
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
25-May
13-May-13
4-Apr-13
24-May
6-May-13
0.0%
23-May
100%
1-Apr-13
22-May
13-May-13
4-Apr-13
21-May
6-May-13
0.0%
20-May
100%
1-Apr-13
19-May
13-May-13
4-Apr-13
18-May
6-May-13
0.0%
WEEK 21
17-May
100%
1-Apr-13
16-May
13-May-13
4-Apr-13
15-May
6-May-13
0.0%
14-May
100%
1-Apr-13
13-May
13-May-13
4-Apr-13
12-May
6-May-13
0.0%
11-May
100%
1-Apr-13
9-May
13-May-13
13-Mar-13
WEEK 20
10-May
6-May-13
0.0%
8-May
100%
1-Apr-13
7-May
13-May-13
13-Mar-13
6-May
6-May-13
0.0%
5-May
100%
1-Apr-13
4-May
13-May-13
13-Mar-13
WEEK 19
3-May
6-May-13
0.0%
2-May
100%
1-Apr-13
1-May
13-May-13
4-Apr-13
30-Apr
6-May-13
0.0%
29-Apr
100%
1-Apr-13
28-Apr
13-May-13
4-Apr-13
27-Apr
6-May-13
0.0%
26-Apr
100%
1-Apr-13
25-Apr
13-May-13
4-Apr-13
24-Apr
6-May-13
0.0%
23-Apr
100%
1-Apr-13
II
WEEK 18
13-May-13
4-Apr-13
0.0%
ON SCH.
/ DELAY
21-Apr
6-May-13
WT
52
100%
1-Apr-13
0.1%
51
Process
13-May-13
13-Mar-13
0.1%
50
6-May-13
0.0%
0.1%
49
Process
100%
1-Apr-13
0.1%
48
13-May-13
13-Mar-13
0.1%
47
Process
6-May-13
0.0%
0.1%
46
100%
0.1%
45
Process
13-May-13
1-Apr-13
0.1%
44
6-May-13
13-Mar-13
100%
0.1%
43
Process
20%
0.1%
42
10%
40%
0.1%
41
Process
20%
40%
0.1%
40
20%
0.1%
39
Process
10%
0.1%
38
20%
WT
0.1%
37
Process
20%
0.1%
36
10%
0.1%
35
Process
15%
0.1%
34
10%
0.1%
33
Process
10%
0.1%
32
15%
0.1%
31
Process
10%
0.1%
30
10%
0.1%
29
Process
10%
0.1%
28
10%
MAY
WEEK 17
0.1%
27
Process
OFFICAL
0.1%
26
FINAL
0.1%
25
Process
DRAFT
0.1%
24
OFFICAL
0.1%
23
Process
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.1%
22
FOR AFC
OFFICAL
0.1%
21
Process
FOR AFD
FINAL
0.1%
20
FOR AFP
DRAFT
0.1%
19
S
T
A
R
T
% PROGRESS
0.1%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
III
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
40%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
days
138 days
OVER DATE:
3 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
3 days
OVER DATE:
days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
3 days
OVER DATE:
3 days
131 days
138 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
OVER DATE:
3 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
/ 60%
/ 60%
/ 60%
/ 60%
DEPT.: Process
OVER DATE:
3 days
131 days
131 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
3 days
131 days
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
3 days
131 days
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
131 days
131 days
131 days
131 days
131 days
131 days
138 days
131 days
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
131 days
131 days
131 days
131 days
131 days
Page 10 of 16
69
70
71
72
73
74
75
76
77
78
79
80
81
82
40%
40%
1-Apr-13
6-May-13
13-May-13
1-Apr-13
6-May-13
13-May-13
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
100%
100%
6-May-13
13-May-13
100%
22-Feb-13
1-Apr-13
6-May-13
13-May-13
100%
22-Feb-13
25-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
22-Feb-13
18-Apr-13
40%
80%
80%
1-Apr-13
6-May-13
22-Feb-13
18-Apr-13
1-Apr-13
6-May-13
22-Feb-13
18-Apr-13
1-Apr-13
6-May-13
22-Feb-13
18-Apr-13
1-Apr-13
22-Feb-13
1-Apr-13
25-Jan-13
13-May-13
100%
80%
13-May-13
100%
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
6-May-13
13-May-13
80%
80%
40%
III
III
III
III
40%
III
1-Apr-13
25-Jan-13
1-Apr-13
25-Jan-13
1-Apr-13
25-Jan-13
100%
40%
6-May-13
13-May-13
100%
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
22-Apr-13
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
22-Apr-13
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
22-Apr-13
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
22-Apr-13
22-Apr-13
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
40%
40%
80%
80%
80%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
A
P
0%
0%
80%
A
P
0%
III
III
III
III
III
III
III
III
III
III
III
III
III
III
24-May
23-May
22-May
21-May
20-May
19-May
18-May
17-May
16-May
15-May
14-May
13-May
12-May
11-May
9-May
10-May
8-May
7-May
6-May
5-May
4-May
3-May
2-May
1-May
30-Apr
29-Apr
28-Apr
27-Apr
26-Apr
25-May
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
/ 60%
131 days
6-May-13
OVER DATE:
3 days
OVER DATE:
3 days
131 days
138 days
131 days
6-May-13
138 days
131 days
6-May-13
DEPT.: Process
OVER DATE:
3 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Process
OVER DATE:
173 days
131 days
138 days
131 days
DEPT.: Process
OVER DATE:
173 days
6-May-13
138 days
131 days
/ 100%
Kindly requested to provide this input within:
DEPT.: Process
OVER DATE:
173 days
6-May-13
138 days
131 days
/ 100%
0.1%
III
138 days
/ 60%
0.0%
III
3 days
/ 100%
0.1%
III
A
0.1%
OVER DATE:
DEPT.: Process
/ 60%
0.0%
III
1-Apr-13
0.1%
0.1%
0%
0.1%
/ 60%
0.0%
0%
Civil
III
III
P
III
0%
Civil
III
0.1%
DEPT.: Process
/ 60%
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
40%
III
0.1%
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
40%
III
III
P
0.0%
25-Apr
100%
1-Apr-13
24-Apr
13-May-13
4-Apr-13
23-Apr
6-May-13
0.0%
22-Apr
100%
1-Apr-13
21-Apr
13-May-13
4-Apr-13
III
40%
6-May-13
0.0%
WEEK 21
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Civil
100%
1-Apr-13
WEEK 20
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
##
##
##
##
##
##
68
13-May-13
4-Apr-13
II
WEEK 19
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
#
Civil
6-May-13
0.0%
ON SCH.
/ DELAY
WEEK 18
0.0%
0.1%
0.1%
0.1%
0.1%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.1%
0.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.0%
0.1%
0.1%
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
##
##
##
##
##
##
67
100%
1-Apr-13
WT
Civil
13-May-13
4-Apr-13
0.1%
66
6-May-13
0.0%
0.1%
Civil
100%
0.1%
65
13-May-13
1-Apr-13
0.1%
Civil
6-May-13
4-Apr-13
100%
0.1%
64
20%
0.1%
Civil
10%
40%
0.1%
Concrete tank drawings (plan, section view) for 11V102/ 11-V103/ 11-V104/ 11-V106/ 11V-107/ 11V108
20%
40%
0.1%
63
20%
0.1%
Civil
10%
0.1%
62
20%
WT
0.1%
Process
20%
0.1%
61
10%
0.1%
Process
60
15%
0.1%
Vendor Print of
- STRICKLE BAR
- CENTRAL TUBE (11-V111)
- WATER COLLECTING WEIR & BUBBLE
SHIED
10%
0.1%
Process
59
10%
0.1%
Vendor Print of
- STRICKLE BAR
- CENTRAL TUBE (11-V109)
- WATER COLLECTING WEIR & BUBBLE
SHIED
15%
0.1%
Process
58
10%
0.1%
Vendor Print of
- STRICKLE BAR
- CENTRAL TUBE (11-V105)
- WATER COLLECTING WEIR & BUBBLE
SHIED
10%
0.1%
Process
10%
0.1%
57
10%
MAY
WEEK 17
0.1%
Process
OFFICAL
0.1%
56
FINAL
0.1%
Process
DRAFT
0.1%
55
OFFICAL
0.1%
Process
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.1%
54
FOR AFC
OFFICAL
0.1%
Process
FOR AFD
FINAL
0.1%
FOR AFP
DRAFT
0.1%
53
S
T
A
R
T
% PROGRESS
0.1%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
/ 60%
/ 20%
/ 20%
DEPT.: Process
OVER DATE:
days
6-May-13
138 days
days
DEPT.: Civil
days
OVER DATE:
days
days
DEPT.: Civil
days
0.1%
0.1%
0.1%
/ 20%
/ 20%
/ 20%
/ 60%
/ 60%
OVER DATE:
days
DEPT.: Civil
OVER DATE:
days
OVER DATE:
days
131 days
6-May-13
131 days
6-May-13
days
131 days
6-May-13
138 days
131 days
6-May-13
131 days
6-May-13
0.1%
0.1%
131 days
6-May-13
131 days
6-May-13
138 days
131 days
0.1%
6-May-13
/ 60%
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 60%
DEPT.: Civil
OVER DATE:
days
138 days
Kindly requested to provide this input within:
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
21 days
Kindly requested to provide this input within:
days
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
21 days
Kindly requested to provide this input within:
days
/ 20%
DEPT.: Civil
OVER DATE:
21 days
Kindly requested to provide this input within:
days
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
/ 20%
DEPT.: Civil
OVER DATE:
21 days
Kindly requested to provide this input within:
6-May-13
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
131 days
131 days
131 days
131 days
131 days
6-May-13
131 days
6-May-13
131 days
131 days
131 days
131 days
131 days
131 days
days
131 days
131 days
6-May-13
Page 11 of 16
Instrument
Catalogue of PG
Instrument
Instrument
Catalogue of HV
Instrument
Instrument
Instrument
Instrument
SUMMARY
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
1-Apr-13
6-May-13
13-May-13
100%
0%
0%
P
A
0%
P
A
0%
P
A
0%
P
A
0%
P
A
0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
25-May
6-May-13
24-May
1-Apr-13
0%
0.0%
23-May
100%
22-May
13-May-13
21-May
6-May-13
20-May
1-Apr-13
0%
0.0%
19-May
100%
18-May
13-May-13
WEEK 21
17-May
6-May-13
16-May
1-Apr-13
0%
0.0%
15-May
100%
14-May
13-May-13
13-May
6-May-13
12-May
1-Apr-13
0%
0.0%
11-May
100%
9-May
13-May-13
10-May
6-May-13
8-May
1-Apr-13
WEEK 20
III
0%
0.0%
7-May
100%
6-May
13-May-13
5-May
6-May-13
II
4-May
1-Apr-13
100%
3-May
20%
2-May
10%
40%
1-May
20%
40%
30-Apr
20%
WEEK 19
10%
ON SCH.
/ DELAY
28-Apr
20%
WT
27-Apr
20%
WEEK 18
26-Apr
10%
25-Apr
15%
24-Apr
10%
23-Apr
10%
22-Apr
15%
21-Apr
10%
WT
94
Catalogue of PSV
10%
0.1%
93
Instrument
10%
0.1%
92
Catalogue of FLOWMETER
10%
MAY
WEEK 17
0.1%
91
Civil
OFFICAL
0.1%
90
FINAL
0.1%
89
Civil
DRAFT
0.1%
88
OFFICAL
0.1%
87
Civil
APR.
FINAL
TIME SCHEDULE
ACC.
DRAFT
0.1%
86
FOR AFC
OFFICAL
0.1%
85
Civil
FOR AFD
FINAL
0.1%
84
FOR AFP
DRAFT
0.1%
83
S
T
A
R
T
% PROGRESS
0.1%
RESPONSIBILTY
SECTION
ATTACHMENT - A
WORK ACTIVITY
III
III
III
III
III
III
III
III
III
III
III
III
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
STATUS TO DATE
21-Sep-13
24.8%
STATUS TO WEEK
38
100.0%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
/ 100%
DEPT.: Civil
OVER DATE:
173 days
138 days
131 days
6-May-13
DEPT.: Civil
OVER DATE:
173 days
138 days
Kindly requested to provide this input within:
6-May-13
DEPT.: Civil
OVER DATE:
173 days
138 days
OVER DATE:
173 days
131 days
131 days
6-May-13
138 days
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
131 days
6-May-13
/
75.2%
Page 12 of 16
WORK VOLUME
NO.
DOCUMENTS / DRAWINGS
STATUS WEEK : 10
PROGRESS STATUS
LINES NO. /
DWGS NO.
WEIGHT
(%)
PLAN
(%)
ACTUAL
(%)
AHEAD/DELAY
(%)
A1
SPECIFICATION
2 specs
10.0%
1.1%
0.0%
/ 1.1%
A2
4 dwgs
20.0%
2.2%
0.0%
/ 2.2%
A3
5 dwgs
20.0%
14.0%
0.0%
/ 14%
9000
92%
100%
76%
Actual
80%
6000
56%
60%
MH Actual
60%
MH Plan
5000
50%
60%
1.7%
0.0%
/ 1.7%
PLANNING
1 set
6.3%
0.0%
0.0%
0% /
B2
DESIGN REVIEW
1 set
6.3%
0.0%
0.0%
0% /
B3
STRESS ANALYSIS
B4
INFORMATION DWGS
B5
PERMIT
B6
MTO
B7
AS-BUILT
16
72.5%
19.0%
0.0%
/ 19%
B1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1000
2000
18%
14%
10%
10%
9%
PLAN =
19.0%
ACTUAL =
0.0%
DELAY =
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
22-Apr
0%
0%
0%
0%
0%
0%
0%
15-Apr
0%
0%
0%
0%
0%
0%
0%
8-Apr
0%
0%
0%
0%
1%
0%
0%
1%
0%
0%
1%
1%
0%
0%
1-Apr
10%
8%
4%8%
20%
10.0%
#REF!
4000
3000
25%
40%
36%
35%
41%
50%
30%
3 dwgs
A4
7000
Planning
70%
% PROGRESS
8000
90%
0%
10000
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
19.0%
SUMMARY PENDING ITEMS BY CONCERNED DEPT. WHICH IMPACT TO PIPING ENGINEERING PROGRESS
NO.
PENDING VOLUME
CONCERNED DEPT.
GENERAL NOTE
NO OF ITEMS
WEIGHT(%)
0.0%
CONCERNED (2D)
CONCERNED (3D)
9/21/2013
1. LE/AE SHALL UTILIZE THIS REPORT TO MONITOR AND CONTROL THE PROGRESS OF YOUR ACTIVITY AS PER SPECIFIED
THE ABOVE RIGHT TABLE.
CUSTOMER :
P&G
18-February-2013
FOR REVIEW
T.Q.THINH
T.Q.THINH
T.Q.THINH
V.P.TUNG
PLANT :
REV.
DATE
DESCRIPTION
MADE BY
CHECKED BY
LEAD
CHIEF
JOB NO:
VD114L
2. LE/AE SHALL STRONGLY EXPEDITE ANY PENDING ITEMS AS PER AS SHOWN IN RIGHT TABLE TO MEET THE TARGET SCHEDULE.
3. LE/AE SHALL UPDATE THIS REPORT AS WEEKLY BASIS IN ORDER TO CLOSE MONITOR / ANALYZE ACTUAL PROGRESS
AND PROBLEM THEN TAKE COUNTERMEASURE.
REMARK
ATTACHMENT - A
% PROGRESS
ACC.
XXXXXX
Tracing/ Jacket specification
XXXXXX
Wrapping specification
XXXXXX
Piping construction specification
XXXXXX
Data sheet for special part
XXXXXX
Fire Fighting description
XXXXXX
Data sheet for FF equipment
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
P
P
P
P
P
P
P
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
0%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
0%
0%
0%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
7-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
0%
0%
0%
7-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
0%
7-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
1.1%
Mr. Thinh
8-Mar-13
0.0%
1.1%
Insulation specification
21-Feb-13
0.0%
1.1%
XXXXXX
0.0%
1.1%
0.0%
1.1%
Painting specification
Mr. Thinh
0%
0.0%
1.1%
XXXXXX
0.0%
1.1%
Mr. Thinh
0.0%
1.1%
0.0%
0.0%
XXXXXX
XXXXXX
Key Plan
XXXXXX
GA
XXXXXX
GA
XXXXXX
GA
XXXXXX
GA
P
P
P
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
P
P
P
P
P
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
70%
0%
70%
0%
27-Feb-13
28-Feb-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
70%
27-Feb-13
28-Feb-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
70%
27-Feb-13
28-Feb-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
70%
0%
0%
0%
1-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
1-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
1-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
1-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
0%
0%
0%
50%
0%
1-Mar-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
4.0%
XXXXXX
1-Mar-13
28-Feb-13
0.0%
4.0%
28-Feb-13
27-Feb-13
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
XXXXXX
Stress analysis report
XXXXXX
Fire fighting drawing
XXXXXX
Fire fighting drawing
P
P
P
P
P
11-Mar-13
16-Mar-13
17-Mar-13
18-Mar-13
11-Mar-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0%
0%
11-Mar-13
16-Mar-13
17-Mar-13
18-Mar-13
11-Mar-13
16-Mar-13
17-Mar-13
18-Mar-13
11-Mar-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0%
0%
0%
XXXXXX
Orgination chart
/ 50%
/ 50%
2.0%
10.0%
0.0%
0.0%
0.0%
0% /
0.0%
0% /
0.0%
0% /
0.0%
0% /
0.0%
0% /
0.0%
: PLANNING SCHEDULE
: 3rd ISSUE
WEEK 12
WEEK 13
WEEK 14
WEEK 15
MAY
WEEK 16
WEEK 17
WEEK 18
WEEK 19
JUN.
WEEK 20
WEEK 21
WEEK 22
WEEK 23
JUL.
WEEK 24
WEEK 25
WEEK 26
WEEK 27
WEEK 28
AUG.
WEEK 29
WEEK 30
WEEK 31
WEEK 32
SEP.
WEEK 33
WEEK 34
WEEK 35
WEEK 36
WEEK 37
OCT.
WEEK 38
WEEK 39
WEEK 40
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
39
39
39
39
39
39
40
40
40
40
40
40
40
8-Sep
39
7-Sep
17-Sep
6-Sep
38
5-Sep
37
16-Sep
4-Sep
36
38
3-Sep
36
15-Sep
2-Sep
36
38
1-Sep
36
38
31-Aug
36
14-Sep
30-Aug
36
38
29-Aug
36
38
28-Aug
35
38
27-Aug
35
37
26-Aug
35
9-Sep
25-Aug
35
13-Sep
24-Aug
35
37
23-Aug
35
12-Sep
22-Aug
35
11-Sep
21-Aug
34
37
20-Aug
34
37
19-Aug
34
10-Sep
18-Aug
37
17-Aug
34
37
16-Aug
8-Aug
34
7-Aug
15-Aug
6-Aug
34
5-Aug
32
14-Aug
4-Aug
32
34
3-Aug
32
33
2-Aug
32
33
1-Aug
32
33
31-Jul
31
33
30-Jul
31
9-Aug
29-Jul
31
13-Aug
28-Jul
31
33
27-Jul
31
12-Aug
26-Jul
31
11-Aug
25-Jul
31
33
24-Jul
33
23-Jul
30
10-Aug
22-Jul
30
32
21-Jul
30
32
20-Jul
30
8-Jul
28
30
7-Jul
28
19-Jul
6-Jul
27
30
5-Jul
27
18-Jul
4-Jul
27
17-Jul
3-Jul
27
30
2-Jul
27
16-Jul
1-Jul
27
29
30-Jun
27
15-Jul
29-Jun
26
29
28-Jun
26
14-Jul
27-Jun
26
29
26-Jun
26
29
25-Jun
26
29
24-Jun
26
29
23-Jun
26
29
22-Jun
25
9-Jul
21-Jun
25
13-Jul
20-Jun
25
28
19-Jun
25
12-Jul
18-Jun
25
11-Jul
17-Jun
25
28
16-Jun
25
28
15-Jun
24
10-Jul
14-Jun
24
28
13-Jun
24
28
9-Jun
12-Jun
24
8-Jun
11-Jun
24
7-Jun
10-Jun
24
6-Jun
2-Jun
24
1-Jun
5-Jun
31-May
23
23
30-May
22
3-Jun
29-May
22
4-Jun
28-May
22
23
27-May
22
23
26-May
22
23
25-May
22
23
24-May
22
23
22-May
23-May
21
21-May
21
20-May
21
19-May
21
18-May
21
8-May
17-May
7-May
16-May
6-May
21
5-May
19
15-May
4-May
19
21
3-May
19
14-May
2-May
19
20
1-May
18
20
30-Apr
18
20
29-Apr
18
20
28-Apr
18
20
27-Apr
18
9-May
26-Apr
18
13-May
25-Apr
18
20
24-Apr
17
12-May
23-Apr
17
20
22-Apr
17
11-May
21-Apr
17
19
20-Apr
17
10-May
19-Apr
17
19
18-Apr
17
19
17-Apr
16
8-Apr
16-Apr
7-Apr
16
6-Apr
15-Apr
5-Apr
15
14-Apr
4-Apr
15
16
3-Apr
14
13-Apr
2-Apr
14
16
1-Apr
14
16
31-Mar
14
16
30-Mar
14
16
29-Mar
14
15
28-Mar
14
9-Apr
27-Mar
13
12-Apr
26-Mar
13
15
25-Mar
13
11-Apr
24-Mar
13
15
23-Mar
13
10-Apr
22-Mar
13
15
20-Mar
21-Mar
19-Mar
13
18-Mar
12
12
17-Mar
12
12
16-Mar
12
12
14-Mar
15-Mar
11
13-Mar
11
11
11
9-Mar
8-Mar
12-Mar
11
7-Mar
15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
40.0%
5.0%
Mr. Thinh
Mr. Thinh
P
P
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
1.3%
XXXXXX
Clarification
/ 50%
2.0%
0.0%
: ACTUAL SCHEDULE
: 2nd ISSUE
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.0%
0.0%
1.3%
/ 50%
2.0%
0.0%
B ACTIVITIVE
B1 PLANNING
/ 50%
2.0%
2.0%
/ 70%
2.8%
20.0%
2.0%
XXXXXX
/ 70%
2.8%
2.0%
Isometric drawing
2
0%
/ 70%
2.8%
2.0%
XXXXXX
/ 70%
2.8%
2.0%
/ 70%
2.8%
0.0%
/ 50%
0.6%
20.0%
4.0%
XXXXXX
27-Feb-13
/ 50%
0.6%
4.0%
/ 50%
0.6%
4.0%
/ 50%
0.6%
4.0%
XXXXXX
/ 50%
0.6%
4.0%
0%
/ 50%
0.6%
4.0%
XXXXXX
/ 50%
0.6%
4.0%
/ 50%
0.6%
4.0%
A2 PLOT PLAN
/ 50%
0.6%
11-Mar
60.0%
10.0%
XXXXXX
1.1%
11
A DELIVERABLE
A1 SPECIFICATION
: 1st ISSUE
100%
10-Mar
20%
11
10%
40%
5-Mar
10%
40%
10
20%
10
10%
4-Mar
10%
10
20%
2-Mar
20%
WT
3-Mar
5%
10
10%
1-Mar
10%
10
5%
28-Feb
5%
10
10%
27-Feb
15%
5%
APR.
WEEK 11
10
5%
WEEK 10
26-Feb
15%
MAR.
WEEK 9
15%
AHEAD
/ DELAY
25-Feb
SIGN
CHECK
23-Feb
REVISE
24-Feb
SIGN
CHECK
22-Feb
DRAFT
SKETCH
21-Feb
SIGN
CHECK
: START
TIME SCHEDULE
FEB.
FOR AFC
DRAFT
FOR AFD
SKETCH
START
WT
ITEM
P.I.C
12
WORK ACTIVITY
FOR AFP
DOCUMENTS / DRAWING NO.
VD114L
DESERT ROSE PROJECT
Planing & Piping
21-Feb-13
10-Mar-13
10
PP
02
0.0%
0% /
0.0%
0.0%
0% /
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Page 14 of 16
ATTACHMENT - A
% PROGRESS
ACC.
Job instruction
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
Mr. Thinh
P
P
0%
0%
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0.0%
0.0%
XXXXXX
3D model review
XXXXXX
Others
P
P
0%
21-Feb-13
24-Feb-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
8-Mar-13
10-Mar-13
10-Mar-13
11-Mar-13
95%
21-Feb-13
24-Feb-13
1-Mar-13
3-Mar-13
4-Mar-13
6-Mar-13
7-Mar-13
7-Mar-13
8-Mar-13
10-Mar-13
10-Mar-13
11-Mar-13
95%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
Stress analysis
P
P
0%
0%
0%
0%
0.0%
0.0%
XXXXXX
Civil information
XXXXXX
Civil information
P
P
P
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
0%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
8-Mar-13
9-Mar-13
9-Mar-13
11-Mar-13
12-Mar-13
13-Mar-13
14-Mar-13
50%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0.0%
0.0%
0.0%
XXXXXX
Fire Fighting drawing
XXXXXX
Fire Fighting drawing
XXXXXX
Fire Fighting drawing
XXXXXX
Fire Fighting drawing
P
P
P
P
0%
0%
0%
0%
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0%
0%
0%
0%
0%
0.7%
0%
0.0%
0.7%
0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
XXXXXX
For material 3rd lot
XXXXXX
For material 4th lot
XXXXXX
For material 4th lot
P
P
P
P
P
0%
0%
0%
0%
0%
0%
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0%
0.0%
0.0%
0.0%
0.0%
XXXXXX
Plot plan
XXXXXX
GA
P
P
P
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
21-Feb-13
16-Mar-13
17-Mar-13
18-Mar-13
0%
0%
0%
0%
0%
0% /
0% /
0.0%
0% /
0.0%
JUN.
WEEK 20
WEEK 21
WEEK 22
WEEK 23
JUL.
WEEK 24
WEEK 25
WEEK 26
WEEK 27
WEEK 28
AUG.
WEEK 29
WEEK 30
WEEK 31
WEEK 32
SEP.
WEEK 33
WEEK 34
WEEK 35
WEEK 36
WEEK 37
WEEK 39
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
39
39
39
39
39
39
40
40
40
40
40
40
40
8-Sep
39
7-Sep
17-Sep
6-Sep
38
5-Sep
37
16-Sep
4-Sep
36
38
3-Sep
36
15-Sep
2-Sep
36
38
1-Sep
36
38
31-Aug
36
14-Sep
30-Aug
36
38
29-Aug
36
38
28-Aug
35
38
27-Aug
35
37
26-Aug
35
9-Sep
25-Aug
35
13-Sep
24-Aug
35
37
23-Aug
35
12-Sep
22-Aug
35
11-Sep
21-Aug
34
37
20-Aug
34
37
19-Aug
34
10-Sep
18-Aug
37
17-Aug
34
37
16-Aug
8-Aug
34
7-Aug
15-Aug
6-Aug
34
5-Aug
32
14-Aug
4-Aug
32
34
3-Aug
32
33
2-Aug
32
33
1-Aug
32
33
31-Jul
31
33
30-Jul
31
9-Aug
29-Jul
31
13-Aug
28-Jul
31
33
27-Jul
31
12-Aug
26-Jul
31
11-Aug
25-Jul
31
33
24-Jul
33
23-Jul
30
10-Aug
22-Jul
30
32
21-Jul
30
32
20-Jul
30
8-Jul
28
30
7-Jul
28
19-Jul
6-Jul
27
30
5-Jul
27
18-Jul
4-Jul
27
17-Jul
3-Jul
27
30
2-Jul
27
16-Jul
1-Jul
27
29
30-Jun
27
15-Jul
29-Jun
26
29
28-Jun
26
14-Jul
27-Jun
26
29
26-Jun
26
29
25-Jun
26
29
24-Jun
26
29
23-Jun
26
29
22-Jun
25
9-Jul
21-Jun
25
13-Jul
20-Jun
25
28
19-Jun
25
12-Jul
18-Jun
25
11-Jul
17-Jun
25
28
16-Jun
25
28
15-Jun
24
10-Jul
14-Jun
24
28
13-Jun
24
28
9-Jun
12-Jun
24
8-Jun
11-Jun
24
7-Jun
10-Jun
24
6-Jun
2-Jun
24
1-Jun
5-Jun
31-May
23
23
30-May
22
3-Jun
29-May
22
4-Jun
28-May
22
23
27-May
22
23
26-May
22
23
25-May
22
23
24-May
22
23
22-May
23-May
21
21-May
21
20-May
21
19-May
21
18-May
21
8-May
17-May
7-May
16-May
6-May
21
5-May
19
15-May
4-May
19
21
3-May
19
14-May
2-May
19
20
1-May
18
20
30-Apr
18
20
29-Apr
18
20
28-Apr
18
20
27-Apr
18
9-May
26-Apr
18
13-May
25-Apr
18
20
24-Apr
17
12-May
23-Apr
17
20
22-Apr
17
11-May
21-Apr
17
19
20-Apr
17
10-May
19-Apr
17
19
18-Apr
17
19
17-Apr
16
8-Apr
16-Apr
7-Apr
16
6-Apr
15-Apr
5-Apr
15
14-Apr
4-Apr
15
16
3-Apr
14
13-Apr
2-Apr
14
16
1-Apr
14
16
31-Mar
14
16
30-Mar
14
16
29-Mar
14
15
28-Mar
14
9-Apr
27-Mar
13
12-Apr
26-Mar
13
15
25-Mar
13
11-Apr
24-Mar
13
15
23-Mar
13
10-Apr
22-Mar
13
15
20-Mar
21-Mar
19-Mar
13
18-Mar
12
12
17-Mar
12
12
16-Mar
12
12
14-Mar
15-Mar
11
13-Mar
11
11
11
9-Mar
8-Mar
12-Mar
11
7-Mar
11-Mar
11
6-Mar
15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0% /
0.0%
0.0%
0% /
0.0%
0% /
0.0%
0% /
0.0%
0.0%
0% /
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0.0%
: PLANNING SCHEDULE
: 3rd ISSUE
WEEK 40
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.0%
: ACTUAL SCHEDULE
: 2nd ISSUE
OCT.
WEEK 38
0.0%
5.0%
1.0%
Data sheet
3
0% /
0.0%
1.0%
XXXXXX
0% /
0.0%
1.0%
Specification
2
0%
0% /
0.0%
10.0%
1.0%
XXXXXX
0% /
0.0%
0.0%
B7 ASBUILT
0% /
0.0%
2.0%
0% /
0.0%
2.0%
XXXXXX
0% /
0.0%
2.0%
XXXXXX
For material 1st lot
0% /
0.0%
2.0%
/ 50%
0.0%
2.0%
B6 MTO
/ 50%
0.6%
5.0%
0.7%
XXXXXX
/ 50%
0.6%
0.7%
/ 50%
0.6%
0.7%
0% /
0.6%
0.7%
XXXXXX
WEEK 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0.7%
XXXXXX
Fire Fighting description
WEEK 18
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.0%
B5 PERMIT
1
WEEK 17
0.0%
5.0%
1.3%
Vessle information
3
0% /
0.0%
1.3%
XXXXXX
/ 95%
2.4%
5.0%
1.3%
Vessle information
2
/ 95%
2.4%
1.3%
0%
MAY
WEEK 16
0.0%
B4 INFORMATION DRAWING
XXXXXX
WEEK 15
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
2.5%
XXXXXX
WEEK 14
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.5%
XXXXXX
Stress analysis
WEEK 13
0.0%
B3 STRESS ANALYSIS
1
0% /
WEEK 12
0.0%
5.0%
B2 DESIGN REVIEW
1
0% /
0.0%
10-Mar
18-Mar-13
21-Feb-13
1.3%
XXXXXX
11
17-Mar-13
60.0%
Mr. Thinh
: 1st ISSUE
16-Mar-13
100%
10
20%
10
10%
40%
4-Mar
10%
40%
10
20%
2-Mar
10%
3-Mar
10%
10
20%
1-Mar
20%
WT
10
5%
28-Feb
10%
10
10%
27-Feb
5%
5%
APR.
WEEK 11
10
10%
26-Feb
15%
5%
25-Feb
5%
WEEK 10
15%
MAR.
WEEK 9
23-Feb
15%
AHEAD
/ DELAY
24-Feb
SIGN
CHECK
22-Feb
REVISE
SIGN
21-Feb
CHECK
DRAFT
SKETCH
SIGN
CHECK
: START
TIME SCHEDULE
FEB.
FOR AFC
DRAFT
WT
FOR AFD
SKETCH
1.3%
START
2.5%
ITEM
A DELIVERABLE
XXXXXX
3
Piping schedule
P.I.C
12
WORK ACTIVITY
FOR AFP
DOCUMENTS / DRAWING NO.
VD114L
DESERT ROSE PROJECT
Planing & Piping
21-Feb-13
10-Mar-13
10
2.5%
PP
02
DUE DATE:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Page 15 of 16
ATTACHMENT - A
% PROGRESS
ACC.
WEEK 21
WEEK 22
WEEK 23
JUL.
WEEK 24
WEEK 25
WEEK 26
WEEK 27
WEEK 28
AUG.
WEEK 29
WEEK 30
WEEK 31
WEEK 32
SEP.
WEEK 33
WEEK 34
WEEK 35
WEEK 36
WEEK 37
: PLANNING SCHEDULE
: 3rd ISSUE
OCT.
WEEK 38
WEEK 39
WEEK 40
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
1-Oct
2-Oct
3-Oct
4-Oct
5-Oct
39
39
39
39
39
39
40
40
40
40
40
40
40
8-Sep
39
7-Sep
17-Sep
6-Sep
38
5-Sep
37
16-Sep
4-Sep
36
38
3-Sep
36
15-Sep
2-Sep
36
38
1-Sep
36
38
31-Aug
36
14-Sep
30-Aug
36
38
29-Aug
36
38
28-Aug
35
38
27-Aug
35
37
26-Aug
35
9-Sep
25-Aug
35
13-Sep
24-Aug
35
37
23-Aug
35
12-Sep
22-Aug
35
11-Sep
21-Aug
34
37
20-Aug
34
37
19-Aug
34
10-Sep
18-Aug
37
17-Aug
34
37
16-Aug
8-Aug
34
7-Aug
15-Aug
6-Aug
34
5-Aug
32
14-Aug
4-Aug
32
34
3-Aug
32
33
2-Aug
32
33
1-Aug
32
33
31-Jul
31
33
30-Jul
31
9-Aug
29-Jul
31
13-Aug
28-Jul
31
33
27-Jul
31
12-Aug
26-Jul
31
11-Aug
25-Jul
31
33
24-Jul
33
23-Jul
30
10-Aug
22-Jul
30
32
21-Jul
30
32
20-Jul
30
8-Jul
28
30
7-Jul
28
19-Jul
6-Jul
27
30
5-Jul
27
18-Jul
4-Jul
27
17-Jul
3-Jul
27
30
2-Jul
27
16-Jul
1-Jul
27
29
30-Jun
27
15-Jul
29-Jun
26
29
28-Jun
26
14-Jul
27-Jun
26
29
26-Jun
26
29
25-Jun
26
29
24-Jun
26
29
23-Jun
26
29
22-Jun
25
9-Jul
21-Jun
25
13-Jul
20-Jun
25
28
19-Jun
25
12-Jul
18-Jun
25
11-Jul
17-Jun
25
28
16-Jun
25
28
15-Jun
24
10-Jul
14-Jun
24
28
13-Jun
24
28
9-Jun
12-Jun
24
8-Jun
11-Jun
24
7-Jun
10-Jun
24
6-Jun
2-Jun
24
1-Jun
5-Jun
31-May
23
23
30-May
22
3-Jun
29-May
22
4-Jun
28-May
22
23
27-May
22
23
26-May
22
23
25-May
22
23
24-May
22
23
22-May
23-May
21
21-May
21
20-May
21
19-May
21
18-May
8-May
21
7-May
17-May
6-May
16-May
5-May
19
21
4-May
19
15-May
3-May
19
21
2-May
19
14-May
1-May
18
20
30-Apr
18
20
29-Apr
18
20
28-Apr
18
20
27-Apr
18
20
26-Apr
18
9-May
25-Apr
18
13-May
24-Apr
17
20
23-Apr
17
12-May
22-Apr
17
20
21-Apr
17
11-May
20-Apr
17
19
19-Apr
17
10-May
18-Apr
17
19
17-Apr
16
19
16-Apr
8-Apr
16
7-Apr
15-Apr
6-Apr
14-Apr
5-Apr
15
16
4-Apr
15
13-Apr
3-Apr
14
16
2-Apr
14
16
1-Apr
14
16
31-Mar
14
16
30-Mar
14
15
29-Mar
14
9-Apr
28-Mar
14
12-Apr
27-Mar
13
15
26-Mar
13
11-Apr
25-Mar
13
15
24-Mar
13
10-Apr
23-Mar
13
15
22-Mar
13
15
20-Mar
21-Mar
19-Mar
13
18-Mar
12
12
17-Mar
12
12
16-Mar
12
12
14-Mar
15-Mar
11
13-Mar
11
11
11
9-Mar
8-Mar
12-Mar
11
7-Mar
11-Mar
11
6-Mar
10-Mar
5-Mar
10
11
4-Mar
10
10
2-Mar
3-Mar
10
1-Mar
10
28-Feb
10
27-Feb
10
26-Feb
32
32
48
48
48
48
48
48
64
80
96
112
128
144
160
176
192
208
224
240
256
272
288
304
320
336
352
368
384
400
416
432
448
464
480
496
48
48
48
48
48
48
48
48
48
48
48
48
48
48
16
16
16
16
16
16
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
48
48
48
48
48
48
48
48
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
32
OVER
7400 HRS
16
1872
32
9272
16
32
MANHOUR
JUN.
WEEK 20
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
16
/
36.3%
36.3%
MANHOUR
: ACTUAL SCHEDULE
: 2nd ISSUE
DUE DATE:
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
32
10
0.0%
SUMMARY
WEEK 19
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DEPT.:
0% /
0.0%
16
STATUS TO WEEK
0.0%
32
10-Mar-13
32
STATUS TO DATE
0%
16
0%
21-Feb-13
16
: 1st ISSUE
18-Mar-13
WEEK 18
32
17-Mar-13
60.0%
Mr. Thinh
WEEK 17
16
16-Mar-13
100%
25-Feb
20%
9
10%
40%
MAY
WEEK 16
32
10%
40%
WEEK 15
16
20%
23-Feb
10%
24-Feb
10%
20%
WEEK 14
32
20%
WT
WEEK 13
16
5%
22-Feb
10%
10%
WEEK 12
32
5%
APR.
WEEK 11
16
5%
21-Feb
10%
15%
WEEK 10
5%
MAR.
WEEK 9
5%
15%
15%
AHEAD
/ DELAY
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
SIGN
0.0%
0.0%
0.0%
0.8%
0.8%
0.8%
0.8%
3.8%
7.5%
7.5%
8.8%
10.0%
10.0%
13.8%
17.5%
24.8%
35.3%
36.3%
41.0%
50.0%
55.5%
60.0%
60.0%
76.0%
92.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
CHECK
REVISE
SIGN
CHECK
32
DRAFT
32
SKETCH
16
SIGN
16
CHECK
: START
TIME SCHEDULE
FEB.
FOR AFC
DRAFT
16
FOR AFD
SKETCH
16
START
WT
ITEM
A DELIVERABLE
XXXXXX
5
Isometric
P.I.C
12
WORK ACTIVITY
FOR AFP
DOCUMENTS / DRAWING NO.
VD114L
DESERT ROSE PROJECT
Planing & Piping
21-Feb-13
10-Mar-13
10
16
1.0%
PP
02
NOTES:
1) For AFP
2) For AFD
3) For AFC
SKETCH
DRAFT
CHECK
Finish prepare engineering doc & dwg, TWC, Summary ID comment list, back-up information.
SIGN
SKETCH
DRAFT
CHECK
Finish prepare engineering doc & dwg, TWC, Summary Owner/ ID comment list, back-up information.
SIGN
REVISE
CHECK
Finish prepare engineering doc & dwg, TWC, Summary Owner/ ID comment list, back-up information.
SIGN
Page 16 of 16