Professional Documents
Culture Documents
DATE LOT NO WT. OF FABRIC YARN COUNT YARN MILL PARTY NAME NO. OF BALLS
SAMPLE
START FINISHED
TOTAL LENGTH (MTRS.)
TIME
SOURCE (Dyebox #)
pH
REMARKS
STOPPAGES / ABNORMALITIES :
TIME
STOPPED
COUNTER
LENGTH AFFECTED
METER
1ST
SHIFT
2ND
SHIFT
3RD
SHIFT
_____________
TIME
RESUMED
HIFT
____________
Time
Tank No.
pH
pH
ORP
FOR MERCERIZED
Mercerized Box
WB before dyeing
Lubrication Box
SULFUR BLACK
Feedrate (lpm)
Time
Baume (Be)
pH
pH
pH
pH
ORP
1st SHIFT
Production Supervisor
_________________
START FINISHED
TIME
pH (Merc.)
pH (WB)
pH
(Fixatn.)
pH
(Softener)
REMARKS
STOPPAGES / ABNORMALITIES :
TIME
STOPPED
COUNTER METER
LENGTH AFFECTED
1ST
SHIFT
2ND SHIFT
3RD
SHIFT
__________ Be ____________GPL
CE : ___________
EMARKS
TIME RESUMED
RD
SHIFT
________________
: : :
Squeezing Pressure (psi) Box No. Function Bottoming/ 1 Pre - wet/ Mercerizing 2 3 4 5 6 7 8 9 10 Washing Washing Washing Dyeing Dyeing Dyeing Dyeing Dyeing Dyeing/
Black Topping
Temperature Target 85 - 90 C Room Temp. Room Temp. 55 - 60 C 55 - 60 C Room Temp. Room Temp. Room Temp. Room Temp. Room Temp. Room Temp. Room Temp. 85 - 90 C Room Temp. 55 - 60 C 50 - 60 C 55 - 60 C 55 - 60 C Actual
Target 65 psi 80 psi 80 psi 60 psi 60 psi 70 psi 70 psi 62 psi 62 psi 62 psi 62 psi 70 psi 70 psi 60 psi 60 psi 60 psi 70 psi 70 psi
Actual
11 12
13 14
Washing Lubrication
: Laboratory Tester
Noted by
REPORT
REMARKS
Actual
Date :
ITEMS TO BE CHECKED
I. STEAM SUPPLY a. Main supply ( __psi minimum) b. Open main and individual supply of drying cylinders - Mercerizing Box - Washboxes - Dyebox # 6 (if required) - Softener II. WATER SUPPLY a. Open line in individual washboxes b. Open slightly drain valve of individual washboxes III. AIR SUPPLY a. Main supply (6 bars min.) b. Open air line valve of individual nip rollers (Box 1-14) c. Push button of squeezing pressure of each nip rollers and set to required pressure (Box 1-14) IV. CIRCULATION a. Open and check all pipeline valves needed b. Switch ON pump to be used V. DYE,CHEM'L AND AUXILLARY FEED a. Open pipeline valves b. Switch ON pump to be used VI . PRE-TREATMENT / BOTTOMING a. Open pipeline valves VII . SOFTENER a. Open pipeline valves VIII . CONTROL PANEL BOARD a. Temperature Settings b. Pumps in use c. Speed
NOT APPLICABLLE
REMARKS
Checked by : Supervisor
Date :
ITEMS TO BE CHECKED
I. STEAM SUPPLY a. Close main and individual supply of drying cylinders b. Close individual pneumatic steam valve of the following: - Mercerizing Box - Washboxes - Dyebox # 6 (if required) - Softener II. WATER SUPPLY a. Close line valve of individual washboxes b. Drain water of all washboxes III. AIR SUPPLY a. Release button of squeezing pressure of each nip rollers (Box 1 - 14) b. Close air line valve of individual rollers (Box 1-14) IV. CIRCULATION a. Switch OFF pump used b. Close pipeline valves c. Drain Auxillary in the Box V. DYE,CHEM'L AND AUXILLARY FEED a. Switch OFF pump used b. Close pipeline valves c. Drain Auxillary in the Box VI . PRE-TREATMENT / BOTTOMING a. Close pipeline valves b. Drain Solution in the Box VII . SOFTENER a. Close pipeline valves b. Drain Solution in the Box VIII . CONTROL PANEL BOARD a. Switch OFF dye range powwer on panel board after transferring of dyeing liquor.
CLOSED/ SHUTOFF
NOT APPLICABLLE
REMARKS
Checked by : Supervisor
BASED : 1.0 MATERIAL Yarn count Party Name Total Ends Weight of Material Speed 2.0 DYEING Type of Dyeing Mercerized Baume % Indigo Dyeing Chemistry Contro l Indigo Free Hydro pH ORP Indigo Dye Feed Chemical Feed Hydro NaOH
: : : : :
RDS No. : 1.0 MATERIAL Yarn count Party Name Total Ends Weight of Material Speed 2.0 DYEING
: : : : :
: : : : : : : : : :
Type of Dyeing Mercerized Baume % Indigo Dyeing Chemistry Contro l Indigo Free Hydro pH ORP Indigo Dye Feed Chemical Feed
: : : : : : : : Hydro NaOH : :
Initial Sulfur Black BR-200 Sulfur _______________ Reducer (Sodium Sulphide) Wetting Agent Caustic Soda 50% Volume Black Feed Rate Dipping Time of Black : : Initial
Belsoft 200 Volume Temperature :
Feed Sulfur Black BR-200 Sulfur _______________ Reducer (Sodium Sulphide) Wetting Agent Caustic Soda 50% Volume Black Feed Rate Dipping Time of Black : :
Box
Feed
Lubrication:
Feed
Lubrication:
Initial
Belsoft 200 Volume Temperature:
Feed
Prepared by : ___________________
Approved by : ___________________