You are on page 1of 1

BV Meeting

14/08/2013 Less than 600 DWT - no requirement for double bottom More than 150 GRT - oil tanker & MARPOL requirement needed to be met More than 400 GRT - oily-water separator required Requires a small sewage treatment plant (0.1m3) or holding tank Notation o I Multi-Cross Hull o Dot Machinery o Type of Pull (Third Party) o Oil Tanker ESP - hull staging (in service survey requirement) o Coastal Service - 6 hours from closest land & scantling can reduce o Unrestricted Navigation - 15% more scantling o tropical water o summer zone Singapore flag requirements o MPA Bunker checklist o non convention safety certificate & regulation No requirement for Pump room (less than 150 GRT is considered as cargo ship) Engine bilge can use engine room cargo pump on top ok cofferdam between engine room and cargo tank Tier 2 engine for more than 130 KW IPP certificate not required for less than 400 GRT need to have enough beds for minimum safe manning

You might also like