SUMMARY Sr.No. A 1 2 3 4 B 1 2 3 4 C Description RCC. WORK R.C.C for M-30 as per Mix Design R.C.

C for M-25 Providing,fabricating and fixing FE415 steel.for 1MT Rate Anly.for Supply ,fixing ,Removing Shuttering & Stagging 150 sqm BRICKWORK 9'' Brick work With Silpoz (1 :6) 8" thk. Siporex Blocks (1:4) with Sand 9" Thk.Brick Work 1:4 with Sand 230 mm Brick Work C:M 1:5 for 10 cum Date-070209 Unit Rate

Cum Cum M.T. Sqm Sqm Sqm Sqm Cum

4087.19 4261.95 39,253.50 279.03 791.88 896.53 568.13 3938.00

PAINTS 2 3 Coat Ext. Paint with Asian Weather Shield for 100 Sqm Sqm 3 3 Coat Snowcem Cement Ext. Paint for 100 Sqm Sqm D PLASTER 1 12mm thk Internal Plaster with 5 mm thk Birla Putty CM 1:4 per 100 Sqm Material Only Sqm 2 12mm thk Internal Plaster with 8 mm thk (1st POP) CM 1:4 per 100 Sqm material only Sqm 3 12 mm thk Internal Plaster with Birla Putty CM 1:4 per 100 m2 Sqm 4 12 mm thk Internal Plaster with POP (1st) CM 1:4 per 100 m2 Sqm 5 Plaster (1:8) with Silpoz 15mm thk. Ex.Scaffolding Sqm 6 Plaster (1:4) with Sand 15mm thk.Ex.Scaffolding Sqm 7 12 mm thk Plaster C:M (1:3) for 100 Sqm Sqm 8 20 mm thk Ext.Plaster C:M (1:3) for 100 Sqm up to 3.00 m ht. Sqm E TILING 1 Marble Mosaic Sqm 2 Kota stone flooring Sqm 3 Glaze Ceramic Sqm 4 Supply & Fixing PVC Door with Baroda Green Marble frame (2.1x 0.75) with hardware Sqm & lab. 5 Baroda Green Marble Sqm 6 Supply & Fixing PVC Door with Nazarana Marble frame (2.1x 0.75) Sqm 7 Tremix Paving of 150mm thk per m2(1:1:2) Sqm Tremix Paving of 75 mm thk per m2 using M25 grade concrete Sqm 8 Con. Block Paving of 140mm thk per m2 Sqm 9 Vitrified Tiles Sqm 10 Wooden Tile Flooring Sqm 11 20mm thk Granite cutting & fixing with sand for 5 Sqm C:M 1:6 Curved Surface Lab.only Sqm 12 20mm thk Granite cutting & fixing with sand for 5 Sqm CM 1:6 Flat Surface lab.only Sqm 13 20mm thk Pebble fixing with sand for 100 Sqm Lab.only Sqm 14 Granite Skirting cutting & fixing with sand of 4" for 50 Rmt CM 1:6 lab. only Rmt 15 IPS Flr. 30mm thk.for 100Sqm Sqm F DOOR & WINDOW 1 Supply & Fixing Wooden Door with Wooden frame (2.1x 0.75) with fixing and hardware Sqm 2 Supply & Fixing Wooden Door with Wooden frame (2.1x 0.75) Sqm 3 Jindal Windows Sections 3 track(1.83x1.2) Sqm 4 Wooden Door (0.75X2.1) Sqm 5 FRP with Marble Frame Door (0.75X2.1) Sqm

133.5 89.94 104.94 57.15 330.57 161.37 302.64 170.85 195.02 218.51 809.31 1190.45 913.15 2979.84 1252.99 3627.04 522.36 798.19 754.52 653.13 5057.29 826.23 747.60 140.75 82.62 217.99 5635.46 3648.12 4226.27 3392.04 8647.42

6 7 8 9 10 11 12 13 14 15 16 G

MS DOOR (1.2X2.1) Fabricated MS DOOR (1.2X2.1) Factory Made Jindal Windows Sections 4 track(3.65x1.75) Euro Windows Sections 4 track(3.65x1.75) Windows Sections 4 track (3.65x1.75) Windows Sections (3.65x1.75) with Insect Net 7' Wooden Door (1.2X2.1) Wooden Door (1.2X2.4) Aluminum Louvers (0.97x2.8) Windows Sections 4 track (3.65x1.75) Windows RCC Louvers (0.6 x 0.75)

Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

2093.46 2432.66 2912.16 2912.16 2912.16 2811.49 5157.85 5726.83 3793.36 2912.16 2500.14

I J

FALSE CEILING 1 Rate Anly for Acrylic False Ceiling 3.55sqmt. 2 Rate Anly for POP False Ceiling 3.55 sqmt. 3 Rate Anly for Gypsum False Ceiling 3.55 sqmt. PIPES & FITTING 1 UPVC Pipe for 100 Rmt. 2 G.I.Pipe for 100 Rmt. 3 HDPE Pipe for 100 Rmt. 4 PVC 110mm dia.of 6kgf/cm2 for 6 Rmt with Pocket in wall & Grouting 5 160 mm dia Supreme UPVC (6 kg pressure) Pipe line (6 Mtr Long) 6 160 mm dia Supreme Eco-Drain Pipe line (6 Mtr Long) SANITARY WARE 1 Wall Mounted W.C with 6.5 litres P.V.C Flush Tank FABRICATION 1 Fabricated M.S. Man- hole Cover 2 Ductile Iron Man-hole Cover VIDEO DOOR PHONE 1 B/W Video Door Phone 2 Color Video Door Phone WATERPROOFING 1 Inclined Surface Gradient Available 2 Flat Surface Gradiant Not Available 3 Inclined Surface Gradient Available (40mm thk.Screed plaster)

Sqm Sqm Sqm Rmt Rmt Rmt Rmt Rmt Rmt Nos Sqm Sqm Nos Nos Sqm Sqm Sqm

1,712.49 909.57 948.06 76.78 373.30 170.26 564.31 1015.44 749.21 7428.47 8350.29 22752.80 7000.00 13000.00 398.28 806.25 605.95

Note- for Detail's refer rate anly.

10/17/2013

Filling of Siprox Block with 400 thk C:M 1:4 with top slurry of 12 mm thk C:M 1:4 for 4.8 Cum Sr no A) Materials: Siprox Block Sand Sub-Total of Material (M) B) Labour: Mason Helper Supervisor /Head Mason Sub-Total of Labour (L) Total (M+L) C) Add for OH & C.P Total Amt. Cost Per 4.8 Cum ` Cost Per 1 Cum ` Cost per 1 Cft ` 15.00% Rate (Rs.) 3780.00 1590.00 Amount. (Rs.) 16329.60 954.00 17283.60

Item

Unit Cum Cum

Quantity 4.32 0.60

Each Each Each

2.40 15.00 0.25

300.00 200.00 350.00

720.00 3000.00 87.50 3807.50 21091.10 3163.67 24254.77 24254.77 5053.08 143.23

Est.Dept

230 mm Brick Work C:M 1:5 for 10 cum Sr. no


A) Materials: Cement Sand Brick Sub-Total of Material (M) B) Labour: Mason Helper Sub-Total of Labour (L) C) Total (M+L) Add for Sundries & Contingencies Add W.C & Electricity Add for OH & C.P & Taxs Total Amt. Cost for 10 Cum (Rs.) Cost Per 1 Cum (Rs.) Cost per 1 Cft (Rs.) 0.50% 1.00% 15.00%

Item

Unit
bag Cum Nos

Quantity
25.00 4.38 5000.00

Each Each

8.50 16.00

for 10 cum Rate (Rs.)


249.00 1588.00 3.70

Amount. (Rs.)
6225.00 6955.44 18500.00 31680.44

235.00 135.00

1997.50 2160.00 4157.50 35837.94 179.19 358.38 5375.69 41213.63 41213.63 4121.36 116.82