You are on page 1of 10

Student Information System

Curriculum Management System (Module)

Index No. : 4105-04A Monteza, Merriam D. Apor, Paolo Angelo G. Vocalan, Michael James T. Vasig, Billy James O. Del Rosario, Jeric Z.

1.What the system does as a whole?


The proposing module system is much more focusing Accordance to the memorandum of DepEd (Department of Education ) K-12 program those subjects implemented, this project is concerned those list of all subject with connectivity of book required per grade level, their reference each subject book, supplier of books, subject teacher assigned their teacher qualification if qualified to subject assign, and DepEd provide a seminar based on industry field and required set a grading system per each subject and applying the program to be set a schedule in calendar activities. The system has capability to set an available subject in summer class to be informing the student how they know what going on in summer curriculum.

2.Transaction covered, queries, reports, special technologies.


Transaction covered:
o o o o o

K-12 program Implement Subject Teacher qualification Book required per subject Calendar activities

Reports: o Subject list report o Calendar activities o Teacher qualification o Book required per subject o Log-in/Log-out history reports

Queries:
o o o o o

Select * from tbl_subject Select * from tbl_calendar Select * from tbl_teacher Select * from tbl_book Select * from tbl_history

Special technologies: o (2) Laptop o Printer o Flash drive/Camera o mySQL 5.8.11 o Eclipse 3.7 indigo o Xampp-win 32.1.8.3 o SQLyog Ultimate

3. Major difference from other similar systems.

Unique in a way that weve never heard of any curriculum system has exist. Our system could generate a different categories of subject that has been implemented whether it has been in use or not in use. The system is capable of archiving the previous learning areas in the curriculum before the new curriculum is implemented.

4. Integration with other systems presented via diagram.

6. Solution architecture.

5. System lay-out

7. Process Workflow.

8. Timeline from November onwards (use Ms Project).

You might also like