You are on page 1of 1

BALANCED CEMENT PLUG - METRES

DATA INPUT:HEIGHT OF PLUG (M) Avg. HOLE SIZE OVER PLUG INTERVAL (ins) DRILL PIPE OD (ins) DRILL PIPE ID (ins) (4.5" 16.6# = 3.826") (3.5" 13.3# = 2.764") DEPTH TO BOTTOM OF PLUG (Metres) SPACER (or WATER) BEFORE PLUG (BBLS) YIELD (cu.ft./sack) MIX WATER (gal/sk) 10 1.52 6.05 2400 TOTAL VOLUME OF DISPLACMENT FLUID (Bbls) SPACER (or WATER) AFTER PLUG (Bbls) MUD VOLUME AFTER SPACER (Bbls) 124.5 1.3 125.8 12.3 5 4.1 50 PLUG SLURRY VOLUME REQUIRED (cu. ft) 94 lb SACKS CEMENT REQUIRED MIX WATER (bbls) 12.7
Class "A" 5.2 gal/sk yields 1.18 Class "G" 5.0 gal/sk yields 1.15 HTB 4.9 gal/sk yeilds 1.16

CALCULATED OUTPUT:-

134

88

You might also like