You are on page 1of 10

Calc

Common Calculations
SQUARE TANK VOLUME INPUTS LENGTH WIDTH HEIGHT 35.00 10.00 7.58 RESULTS VOLUME, MAX BBLS/FT 473.75 62.50

CIRCULAR TANK VOLUME INPUTS DIAMETER RADIUS


DEPTH or LENGTH

RESULTS 6.00 3.00 8.00 VOLUME, MAX BBLS/FT 45.00 5.63

BIT HYDRAULICS INPUTS MUD WEIGHT


FLOW RATE, GPM HOLE / BIT SIZE

RESULTS 8.33 400.00 9.8750 14.00 14.00 14.00 22.00 0.00 NOZZLE AREA NOZZLE VEL BIT PRESS LOSS HYD HP HYD HP, PSI HYD IF, PPF 0.8222 156.08 180.93 42.22 0.55 269.18

NOZZLE # 1 NOZZLE # 2 NOZZLE # 3 NOZZLE # 4 NOZZLE # 5 NOZZLE # 6 NOZZLE # 7 NOZZLE # 8 NOZZLE # 9 NOZZLE # 10

HYDROXYL EVALUATION INPUTS RESULTS

Page 1

Calc

Ph
Pm

Pf Wf ( . XX )

10.20 1.30 0.30 0.770

EXCESS LIME HYDROXYL CARBONATES BICARBONAES

0.28 2.69 350.49 110.83

ppb mg/l mg/l mg/l

WEIGHT UP, BARITE INPUTS System Volume


Initial M. Weight

RESULTS 1200.00 10.60 12.00 Number Sacks Volume Increase Final Volume 1073.7 73.0 1273.0

Desired M. Weight

WEIGHT UP, HEMATITE INPUTS System Volume


Initial M. Weight

RESULTS 1400.00 13.80 14.20 Number Sacks Volume Increase Final Volume 356.2 20.4 1420.4

Desired M. Weight

WEIGHT UP, CaCO3 INPUTS System Volume


Initial M. Weight

RESULTS 300.00 8.60 10.00 Number Sacks Volume Increase Final Volume 317.4 33.6 333.6

Desired M. Weight

CUT BACK INPUTS System Volume


Initial M. Weight

RESULTS 800.00 11.50 9.50 8.30 Volume Increase Final Volume 1333.3 2133.3

Desired M. Weight Weight of CB Fluid

Page 2

Calc

MIXING MUDS INPUTS Volume #1 Weight #1 Volume #2 Weight #2 380.00 10.50 200.00 6.80 RESULTS New Volume New Weight 580.0 9.22

EQUIVALENT MUD WEIGHT INPUTS Presssure, PSI TVD Mud Weight 1455.00 11205.00 11.50 RESULTS Increase EMW 2.50 14.00

TRIPLEX PUMP OUTPUT INPUTS Liner Diameter Stroke Length Efficiency ( . xx ) 6.50 12.00 0.95 RESULTS Bbls. Per Stroke Gals. Per Stroke 0.1170 0.0028

DUPLEX PUMP OUTPUT INPUTS Liner Diameter Stroke Length Rod Diameter Efficiency ( . xx ) 6.50 18.00 2.00 0.95 RESULTS Bbls. Per Stroke Gals. Per Stroke 0.2229 0.0053

TEMPERATURE CONVERSION

INPUTS Deg. Centigrade Deg. Farenheit 50.00 80.00


= =

RESULTS Deg. Farenheit Deg. Centigrade 122.0 26.7

Page 3

Calc

QUICK ECD INPUTS Mud Weight Hole I.D. Pipe I.D. Flow Rate, GPM Depth, T.V. 10.00 12.25 5.05 1040.00 6939.00 RESULTS MW Increase ECD pr rpm pl 0.051 10.051 5.7343 45.6916 18.4087

MUD WEIGHT POTENTIAL INPUTS System Volume Current Mud Wt. Sax Barite Avail. 2000.00 9.70 2000.00 RESULTS MW Potential Max Mud Weight 1.6433 11.3433

SOLIDS REMOVAL EFF'CY and REQUIRED DILUTION INPUTS % Drilled Solids Interval Length Hole Size 12.000 1000.00 17.50

note>

1% drl'd solids = 1.00

RESULTS S.R.E., PERCENT # Bbls. Cuttings Dilution, Bbls/Int'l Req. Dilution, BPF 22.27 297.50 1695.77 1.70

SOLIDS REMOVAL EFF'CY and REQUIRED DILUTION INPUTS Desired SRE Interval Length Hole Size 70.000 3000.00 8.50

THE EASY WAY

RESULTS Bbls. Cuttings Dilution Factor Total Int'l Dilution Min. RDA, BPF 210.56 5.70 1200.19 0.40

GRAMS to POUNDS CONV.

INPUTS

RESULTS

Page 4

Calc

# GRAMS

225.00

= =

POUNDS OUNCES, AVDP OUNCES, TROY

0.50 ** 7.94 ** 7.23

Rate of Penetration
INPUTS Mud Weight, Pits ROP, FPM Hole ID Flow Rate, BPM Solids, annulus 12.00 2.00 8.50 6.00 0.07 Mud Weight in the Annulus 12.18 Max Instant Rate of Penetration 386

Page 5

Calc

Page 6

Calc

Page 7

Calc

Page 8

Calc

0.12

0 0

Page 9

Dilutions

Interval Dilution and Inventory Requirements Water Based Mud Required Dilutions
Inputs 1500 9.500 1200 100 70 Calculated 105 600 50 0.50 8.58 Barrels of Dirt to be Drilled Retained = 31.6 = 5 % DS Interval Dilution Volume Required, MINIMUM for 5% Drld Solids Minimum Required Dilution Per Hour While Drlg., 5% Drld. Sol. Minimum Required Dilution Per Foot While Drlg. Minimum Required Dilution in Seconds per 5 Gallons Starting Volume ( Active Pits and Traps ) Bit Size ( Plus washout if Desired ) Length of Interval ( interval to be Drilled ) Expected ROP Dilution Factor >> Percent Solids Removal Efficiency Retention

5.70 30%

2100 Total Mud Required for the Interval 494 Total Mud To Dump While Drilling 1605 Final System Volume

Product Concentrations and Requirements


BHI PRODUCT
Barite Gel Caustic Lime Starch NewDrill Paq Ligco Unical Salt

Pounds Per Sack


100 100 50 50 50 50 50 50 50 2000

Product Concentration
10.00 1.00 0.50 2.00 0.50 1.00 2.00 1.00 80.00

Sacks Req. Sacks Req. Dilution Vol. Sys. Volume


0 60 12 6 24 6 12 24 12 24 0 210 42 21 84 21 42 84 42 84

Page 10

You might also like