You are on page 1of 5

648834900.

xls

Well No: 30/15-12 Macallan Date: 3/5/2023

Hole size: 6 ins Last casing = 7"-29ppf-HC110. To calculate bbls/ft enter the
Bit depth MD 14,000 ft Csg shoe (MD) 11,000 ft diameters in inches in the shaded boxes
Bit depth TVD 9,000 ft MUD WT IN HOLE 12.00 ppg Csg shoe (TVD) 7,800 ft
Open Hole 3,000 ft Top of Liner (MD) 8,500 ft
CAPACITIES CAPACITIES
5" DP 7,400.00 ft x 0.01774 bbl/ft= 131.3 bbls LEAK OFF INFORMATION D (diameter) = 2.25 ins
3 1/2" DP 6,000.00 ft x 0.00995 bbl/ft= 59.7 bbls Leak off test mud weight 11 ppg
3 1/2" HWDP 450.00 ft x 0.00492 bbl/ft= 2.2 bbls Leak off test pressure 600 psi = 0.0049178456 bbls/ft
4 3/4" DC 150.00 ft x 0.00492 bbl/ft= 0.7 bbls Casing TVD 7800 ft
Depth Check 14,000.00 Total string capacity = 193.9 bbls Max allowable mud gradient 0.65 psi/ft
Ann Depth Check 14,000.00 Surface to bit strokes = 1905 stks M.A.A.S.P. 194 psi
Chokeline 675 E.M.W. 12.48 ppg
ANNULAR CAPACITIES
Riser x 5"DP 574 ft x 0.32640 bbl/ft = 187.4 bbls BIT INFORMATION
9 5/8"CSG x 5"DP 6,826 ft x 0.04892 bbl/ft = 333.9 bbls RUN No ANNULAR CAPACITIES
9 5/8" CSG x 3 1/2" DP 1,100 ft x 0.06131 bbl/ft = 67.4 bbls MANUF D (Large diameter) = 8.681 ins
7" Liner x 3 1/2" DP 2,500 ft x 0.02402 bbl/ft = 60.1 bbls TYPE
6" OH x 3 1/2" DP 2,400 ft x 0.02307 bbl/ft = 55.4 bbls NOZZLES No Size d (small diameter) = 3.5 ins
6" OH x 3 1/2" HWDP 450 ft x 0.02307 bbl/ft = 10.4 bbls 2 12
6" OH x 4 3/4" DC 150 ft x ### bbl/ft = 2.0 bbls 1 14
Total ann capacity = 715 bbls TFA 0.3712233507168 = 0.0613064816 bbls/ft
Bottoms up strokes = 7021 stks
B/U (with slip factor) = 8074 stks SCR's
Depth 11015 TVD
Mud weight 11
Pump No 1 /SPM/ Pump No 2
psi/30/ psi
CIRCULATION DETAILS Bbls Stks Time psi/40/ psi SIDPP 400 psi
Surface to bit 194 1905 32 psi/50/ psi SICP 0 psi
Bit to shoe 897 8818 147 psi/60/ psi PIT GAIN 0 bbls
Shoe to Choke 187 1841 31 psi/100/ psi
TOTAL = 1279 12565 209
HANG OFF POINTS Kill Rate 20 880 psi
PUMP OUTPUT Upper Annular 27.8 ft Kill Mud Wt 12.85 ppg
Stroke 12 ins Lower Annular 34.0 ft ICP 1280 psi
Liner size 6 ins Shear rams 36.1 ft FCP 943 ppg
Output @ 97 0.102 bbls/stk 5"-7" Variable Rams 42.0 ft
5" Middle Rams 73.0 ft
Planned kill speed 60 SPM 5" Lower Rams 73.0 ft
256 GPM Wellhead 73.0 ft

Annular velocity D.C.'s/OH = 467.77 ft/min


Annular velocity DP-HWDP/OH = 264.66 ft/min
Annular velocityDP/LINER = 254.18 ft/min
Annular velocity DP/CSG = 99.60 ft/min
Annular velocity D.P./CSG = 124.81 ft/min
Annular velocity D.P./Riser = 18.71 ft/min

Carbide stroke late over gauge hole = 0 Strokes


Open Hole Ann Vol Gauge Hole = ### Bbls
Actual Ann Hole Vol 67.71145 Bbls
Metal Displacement in Open Hole 21.9753086 Bbls
OH pipe capacity 26.8244796 Bbls
Hole Capacity 0.03883708 Bbls/Ft
Hole ID 6.32

Page 1
648834900.xls

Well No: 15/29b F whatever Callanish. Date: 3/5/2023

Hole size: 8.5


ins Last casing = 10 3/4" x 9 5/8""-53.5ppf-L80. To calculate bbls/ft enter the
Bit depth MD 15,250ft Csg shoe (MD) 10,878 ft diameters in inches in the shaded boxes
Bit depth TVD 6,696ft MUD WT IN HOLE 11.10 ppg Csg shoe (TVD) 6,681 ft
Open Hole 4,372ft Stands back to SHOE 45.5417
CAPACITIES LEAK OFF INFORMATION CAPACITIES
51/2" DP 9,040.00 ft x 0.020786 bbl/ft= 187.9 bbls Leak off test mud weight 11.1 ppg D (diameter) = 2.875 ins
5" DP 5,630.00 ft x 0.01776 bbl/ft= 100.0 bbls Leak off test pressure 834 psi
5" HWDP 360.00 ft x 0.00874 bbl/ft= 3.1 bbls Casing TVD 6681 ft = 0.0080294455 bbls/ft
6 1/2" DC 220.00 ft x 0.00388571 bbl/ft= 0.9 bbls Max allowable mud gradien 0.70 psi/ft
Depth Check 15,250.00 Total string capacity = 291.9 bbls M.A.A.S.P. 834 psi
Ann Depth Check 15,250.00 Surface to bit strokes = 2295 stks E.M.W. 13.50 ppg
Chokeline 675 6 bbls
ANNULAR CAPACITIES BIT INFORMATION
Riser x 5.5"DP 574 ft x 0.32640 bbl/ft = 187.4 bbls RUN No RSX162
10 3/4"CSG x 5.5"DP 471 ft x 0.06429 bbl/ft = 30.3 bbls MANUF ANNULAR CAPACITIES
9 5/8"CSG x 5.5"DP 7,995 ft x 0.04280 bbl/ft = 342.2 bbls TYPE D (Large diameter) = 6.2 ins
9 5/8"CSG x 5"DP 1,838 ft x 0.04790 bbl/ft = 88.0 bbls NOZZLES No Size
8 1/2"OH x 5" DP 3,792 ft x 0.04590 bbl/ft = 174.1 bbls 6 16 d (small diameter) = 2 ins
8 1/2"OH x 5" HWDP 360 ft x 0.04590 bbl/ft = 16.5 bbls 0 0
8 1/2"OH x 6 1/2" DC 220 ft x 0.02914279 bbl/ft = 6.4 bbls TFA 1.17809724525
Previous Ftg/ Hrs 9972 20.5 Total ann capacity = 845 bbls = 0.0334559218 bbls/ft
PLAN TD 15183 Bottoms up strokes = 6641 stks SCR's
START TIME 3/11/2005 6:30 B/U (with slip factor) = 7637 stks Depth 12650 TVD 6690
Drilling Hours 72 Mud weight 11.1
ROP 73.305555556 Hrs Pump No 1 /SPM/ Pump No 2
Drill Time 72 Hrs psi/20/ psi 221.3706
Full Skips 24 530 psi/30/ 500 psi
Feet per Skip 182.16666667 640 psi/40/ 670 psi SIDPP 0 psi
CIRCULATION DETAILS Bbls Stks Time 780 psi/50/ 790 psi SICP 0 psi
Surface to bit 292 2295 76 psi/60/ psi PIT GAIN 10 bbls
Bit to shoe 197 1549 51.6182
Shoe to Surface. 648 5093 ### HANG OFF POINTS
TOTAL = 1137 8936 298 Upper Annular 534.0 ft Kill Rate 30 530 psi
Lower Annular 551.4 ft Kill Mud Wt 11.10 ppg
PUMP OUTPUT Shear rams 541.7 ft ICP 530 psi
Stroke 15 ins 5"-7" Variable Rams 560.0 ft FCP 530 ppg
Liner size 6 ins 5" Middle Rams 563.6 ft
Output @ 97 0.12721 bbls/stk 5" Lower Rams 566.2 ft
Wellhead 569.7 ft
Planned kill speed 30 SPM CIRCULATION DETAILS WELL CONTROL
160 GPM Bbls Stks Time
Surface to bit 292 2295 76
Annular velocity D.C.'s/OH = 130.95 ft/min Bit to shoe 197 1549 52
Annular velocity HWDP/OH = 83.14 ft/min Shoe to Choke 663 5215 174
Annular velocity HWDP/OH = 83.14 ft/min TOTAL = 1152 9059 302
Annular velocity DP/OH = 79.68 ft/min
Annular velocity D.P./CSG = 89.17 ft/min
Annular velocity D.P./Riser = 11.69 ft/min

Page 2
648834900.xls

Well No: F3 Date: 3/5/2023

Hole size: 12.25 ins Last casing = 13 3/8"-68ppf-L80.


Bit depth MD 13,228 ft Csg shoe (MD) 3,103 ft
Bit depth TVD 10,945 ft MUD WT IN HOLE 12.20 ppg Csg shoe (TVD) 3,103 ft
Open Hole 10,125 ft Stands back to SHOE 105.469
CAPACITIES LEAK OFF INFORMATION
5 1/2" DP 11,835.00 ft x 0.020786 bbl/ft= 246.0 bbls Leak off test mud weight 11.8 ppg
5 1/2" HWDP 1,095.00 ft x 0.01458657 bbl/ft= 16.0 bbls Leak off test pressure 382 psi
8" DC 278.00 ft x 0.00874284 bbl/ft= 2.4 bbls Casing TVD 3103 ft
9 1/2" dc 20.00 ft x 0.00803 bbl/ft= 0.2 bbls Max allowable mud gradien 0.74 psi/ft
Depth Check 13,228.00 Total string capacity = 264.6 bbls M.A.A.S.P. 317 psi
Ann Depth Check 13,228.00 Surface to bit strokes = 2600 stks E.M.W. 14.17 ppg
Chokeline 625
ANNULAR CAPACITIES BIT INFORMATION
Riser x 5 1/2"DP 520 ft x 0.31213141 bbl/ft = 162 bbls RUN No 13
13 3/8"CSG x 5 1/2"DP 2,583 ft x 0.12048721 bbl/ft = 311 bbls MANUF Hycalog
12 1/4"OH x 5 1/2" DP 8,732 ft x 0.11638901 bbl/ft = 1016 bbls TYPE rSX19013 D (Large d
12 1/4"OH x 5 1/2" HWDP 1,095 ft x 0.11638901 bbl/ft = 127 bbls NOZZLES No Size
12 1/4"OH x 8"DC 278 ft x 0.08360338 bbl/ft = 23 bbls 7 14 d (small d
12 1/4"OH x 9 1/2" DC's 20 ft x 0.033514 bbl/ft = 1 bbls 0 12
Total ann capacity = 1641 bbls TFA 1.052310820627
Bottoms up strokes = 16127 stks
B/U (with slip factor) = 18546 stks SCR's
Depth 11992 TVD 10825
Mud weight 12.1
Pump No 1 /SPM/ Pump No 3
200 psi/30/ 220 psi
CIRCULATION DETAILS Bbls Stks Time 260 psi/40/ 250 psi
Surface to bit 265 2600 13 300 psi/50/ 340 psi
Bit to shoe 1167 11467 57 psi/60/ psi
Shoe to Surface 474 4653 23 psi/100/ psi
TOTAL = 1905 18720 94
HANG OFF POINTS
PUMP OUTPUT Upper Annular 492.2 ft
Stoke 12 ins Lower Annular 501.9 ft
Liner size 6 ins Shear rams 508.0 ft
Output @ 97 0.1018 bbls/stk 5"Upper Rams 510.5 ft
3 1/2" - 7" Var Rams 514.1 ft
Pump Rate 200 SPM 5" Lower Rams 516.7 ft
855 GPM Wellhead 520.5 ft

Page 3 648834900.xls
648834900.xls

Well No: 30/15-12 Macallan Date: 3/5/2023

Hole size: 17.5 ins Last casing = 13 3/8"-68ppf-L80. To calculate bbls/ft enter the
Bit depth MD 4,500 ft Csg shoe (MD) 2,000 ft diameters in inches in the shaded boxes
Bit depth TVD 4,400 ft MUD WT IN HOLE 11.00 ppg Csg shoe (TVD) 2,000 ft
Open Hole 2,500 ft
CAPACITIES LEAK OFF INFORMATION CAPACITIES
5" DP 3,615.00 ft x 0.01776 bbl/ft= 64.2 bbls Leak off test mud weight 11 ppg D (diameter) = 5 ins
6 5/8" HWDP 640.00 ft x 0.02428566 bbl/ft= 15.5 bbls Leak off test pressure 200 psi
8" DC 95.00 ft x 0.00874284 bbl/ft= 0.8 bbls Casing TVD 2000 ft = 0.0242856575 bbls/ft
9 1/2" dc 150.00 ft x 0.00803 bbl/ft= 1.2 bbls Max allowable mud gradien 0.67 psi/ft
Depth Check 4,500.00 Total string capacity = 81.8 bbls M.A.A.S.P. 200 psi
Ann Depth Check 4,500.00 Surface to bit strokes = 685 stks E.M.W. 12.92 ppg
Chokeline 675
ANNULAR CAPACITIES BIT INFORMATION
Riser x 5"DP 574 ft x 0.32639924 bbl/ft = 187 bbls RUN No
20"CSG x 5"DP 1,426 ft x 0.30808499 bbl/ft = 439 bbls MANUF ANNULAR CAPACITIES
17 1/2"OH x 5" DP 1,615 ft x 0.27321365 bbl/ft = 441 bbls TYPE D (Large diameter) = 17.5 ins
17 1/2"OH x 6 5/8" HWDP 640 ft x 0.2548628 bbl/ft = 163 bbls NOZZLES No Size
17 1/2"OH x 8"DC 95 ft x 0.23532802 bbl/ft = 22 bbls 3 24 d (small diameter) = 9.5 ins
17 1/2"OH x 9.5"DC 150 ft x 0.20982808 bbl/ft = 31 bbls 1 16
Total ann capacity = 1285 bbls TFA 1.521708941781
Bottoms up strokes = 10758 stks = 0.2098280808 bbls/ft
B/U (with slip factor) = 12372 stks SCR's
Depth 11015 TVD
Mud weight 11
Pump No 1 /SPM/ Pump No 2
psi/30/ psi
CIRCULATION DETAILS Bbls Stks Time psi/40/ psi
Surface to bit 82 685 3 psi/50/ psi SIDPP 0 psi
Bit to shoe 1912 16005 67 psi/60/ psi SICP 0 psi
Shoe to Choke 187 1569 7 psi/100/ psi PIT GAIN 0 bbls
TOTAL = 2181 18259 76
HANG OFF POINTS
PUMP OUTPUT Upper Annular ft Kill Rate 20 400 psi
Stoke 12 ins Lower Annular ft Kill Mud Wt 11.00 ppg
Liner size 6.5 ins Shear rams ft ICP 400 psi
Output @ 97 0.119 bbls/stk 5"-7" Variable Rams ft FCP 400 ppg
5" Middle Rams ft
Planned kill speed 240 SPM 5" Lower Rams ft
1204 GPM Wellhead ft

Annular velocity D.C.'s/OH = 136.61 ft/min


Annular velocity D.C.'s/OH = 121.81 ft/min
Annular velocity HWDP/OH = 112.47 ft/min
Annular velocity DP/OH = 104.92 ft/min
Annular velocity D.P./CSG = 93.04 ft/min
Annular velocity D.P./Riser = 87.82 ft/min

Carbide stroke late over gauge hole = 0 Strokes


Open Hole Ann Vol Gauge Hole = ### Bbls
Actual Ann Hole Vol 658.1826 Bbls
Metal Displacement in Open Hole 40.6018519 Bbls
OH pipe capacity 46.26029 Bbls
Hole Capacity 0.2980179 Bbls/Ft
Hole ID 17.5

Page 4
648834900.xls

Well No: 30/15-12 Macallan Date: 3/5/2023

Hole size: 26 ins Last casing = 13 3/8"-68ppf-L80. To calculate bbls/ft enter the
Bit depth MD 2,200 ft Csg shoe (MD) 600 ft diameters in inches in the shaded boxes
Bit depth TVD 2,000 ft MUD WT IN HOLE 9.60 ppg Csg shoe (TVD) 600 ft
Open Hole 1,600 ft
CAPACITIES LEAK OFF INFORMATION CAPACITIES
5" DP 1,315.00 ft x 0.01776 bbl/ft= 23.4 bbls Leak off test mud weight 11 ppg D (diameter) = 5 ins
6 5/8" HWDP 640.00 ft x 0.02428566 bbl/ft= 15.5 bbls Leak off test pressure 0 psi
8" DC 95.00 ft x 0.00874284 bbl/ft= 0.8 bbls Casing TVD 600 ft = 0.0242856575 bbls/ft
9 1/2" dc 150.00 ft x 0.00803 bbl/ft= 1.2 bbls Max allowable mud gradien 0.57 psi/ft
Depth Check 2,200.00 Total string capacity = 40.9 bbls M.A.A.S.P. 44 psi
Ann Depth Check 2,200.00 Surface to bit strokes = 402 stks E.M.W. 11.00 ppg
Chokeline 675
ANNULAR CAPACITIES BIT INFORMATION
Riser/Mud L x 5"DP 574 ft x 0 bbl/ft = 0 bbls RUN No
30"CSG x 5"DP 26 ft x 0.73731256 bbl/ft = 19 bbls MANUF ANNULAR CAPACITIES
24"OH x 5" DP 715 ft x 0.53525588 bbl/ft = 383 bbls TYPE D (Large diameter) = 28 ins
24"OH x 6 5/8" HWDP 640 ft x 0.51690504 bbl/ft = 331 bbls NOZZLES No Size
24"OH x 8"DC 95 ft x 0.49737027 bbl/ft = 47 bbls 3 28 d (small diameter) = 5 ins
24"OH x 9.5"DC 150 ft x 0.47187033 bbl/ft = 71 bbls 1 24
Total ann capacity = 851 bbls TFA 2.245747873758
Bottoms up strokes = 8360 stks = 0.7373125616 bbls/ft
B/U (with slip factor) = 9614 stks SCR's
Depth 11015 TVD
Mud weight 11
Pump No 1 /SPM/ Pump No 2
psi/30/ psi
CIRCULATION DETAILS Bbls Stks Time psi/40/ psi
Surface to bit 41 402 2 psi/50/ psi SIDPP 0 psi
Bit to shoe 1612 15835 66 psi/60/ psi SICP 0 psi
Shoe to Choke 0 0 0 psi/100/ psi PIT GAIN 0 bbls
TOTAL = 1652 16238 68
HANG OFF POINTS
PUMP OUTPUT Upper Annular ft Kill Rate 0 400 psi
Stoke 12 ins Lower Annular ft Kill Mud Wt 9.60 ppg
Liner size 6 ins Shear rams ft ICP 400 psi
Output @ 97 0.102 bbls/stk 5"-7" Variable Rams ft FCP 400 ppg
5" Middle Rams ft
Planned kill speed 240 SPM 5" Lower Rams ft
1026 GPM Wellhead ft

Annular velocity D.C.'s/OH = 51.76 ft/min


Annular velocity D.C.'s/OH = 49.11 ft/min
Annular velocity HWDP/OH = 47.25 ft/min
Annular velocity DP/OH = 45.63 ft/min
Annular velocity D.P./CSG = 33.13 ft/min
Annular velocity D.P./Riser = #DIV/0! ft/min

Carbide stroke late over gauge hole = 0 Strokes


Open Hole Ann Vol Gauge Hole = ### Bbls
Actual Ann Hole Vol 831.5579 Bbls
Metal Displacement in Open Hole 34.2293028 Bbls
OH pipe capacity 30.27629 Bbls
Hole Capacity 0.56003969 Bbls/Ft
Hole ID 24.011

Page 5

You might also like