10323300F-067- Rev.

COST ESTIMATE
PROJECT TITLE Repair welding 12E001 () Other
A_Material Cost

PR No.

Date 3/6/2012

Rev. 0

By Krit-arit

Check

Appr.

Page

() Mechanical

B_Construction Cost

Item
1

Description
Material Include - Consumable - Crane (For remove and install bellow) - Etc

Q'ty
1.00

Unit
Job

Unit P
146,700

Amount

Item
1

Description
- Construction Cost - Welding window - Cutting Expansion bellow 3 EA - Remove and Install expansion bellow 3EA - Welding Expansion bellow 3EA - NDE PT, Phase arrey - Repair welding as Specialist comment - Etc

Q'ty
1.00

Unit
Job

Unit P
1,145,300

Amount

Sub Total VAT Total Material Cost (Baht) 1 ) Construct Engineer 2 ) Design Engineer 3 ) Estimale Engineer Cost Before Vat Mat'l Sumary Cost Mat'l Baht Baht Costr. Costr.

7 % Baht Baht Baht Technicial Technicial Technicial Baht Baht Manhour Manhour -

Sub Total O.P.T Total Before Vat VAT Total Construction Cost (Baht) Baht Baht Baht Total Man_Hour Service Charge :

20 7

% %

1,292,000 258,400 108,528 1,658,928

Baht

Baht Baht

Total : Total :