S_ALR_87013046 Functionality This Report compares a material cost estimate with the preliminary cost estimate for a manufacturing order. Scenario You can use this report to compare a material cost estimate with the planned costs of manufacturing orders for this material. Requiremen ! Cost estimate was released and preliminary cost estimate was saved. Menu Path Accounting Product Cost Controlling Product Cost Planning Information System O !ect Comparisons "or #aterial S$A%R$&'()*(+, - #aterial Cost .stimate vs. Preliminary Order Cost .stimate
S$A%R$&'()*(+,

Transaction Code

1.

/ou le clic0 on S_ALR_8701304 ! Material Cost "sti#ate $s% Preli#inary &rder Cost "sti#ate%

SAPTOPJOBS

Page 1 of 3

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Planned Costs: Selection

2.

1pdate the following fields2


Field Name #aterial Plant Description Code identifying a product or component Code identifying the operational unit of the company where the material is manufactured and stored The costing variant used during cost estimate calculation. The costing version code. /escription of the Costing date. 5um er identifying the order 33((((4( )3(( Values

Costing variant Costing version Costing date Order

SPC) ) ),.)).3((3 &((((3)

3.

Clic0 the "'ecute

utton.

SAPTOPJOBS

Page 2 of 3

COST CENTER ACCOUNTING PRODUCT COST CONTROLLING END USER TRAINING DOCUMENTS Total values

4.

Clic0 the (ac)

utton.

SAPTOPJOBS

Page 3 of 3