Professional Documents
Culture Documents
8b569minor Project
8b569minor Project
Minor Project is a Mandatory Course in 7th Sem and students will continue the same project as Major Project in 8th Semester.
The objective of Minor Project is to enable the student to take up investigative study in the broad field of Electronics & Communication Engineering, either fully theoretical/practical or involving both theoretical and practical work to be assigned by the Department on an individual basis or upto a maximum of four students in a group, under the guidance of a Supervisor. This is expected to provide a good initiation for the student(s) in R&D work. The assignment to normally include: Survey and study of published literature on the assigned topic; Working out a preliminary Approach to the Problem relating to the assigned topic; Conducting preliminary Analysis/ Modelling/ Simulation/ Experiment/ Design/ Feasibility; Submitting a Synopsis on the Study conducted for presentation to the Department Final Evaluation by a Departmental Committee. To achieve the above objectives following activities have to be completed as a part of Minor Project in 7th semester: 1. Students need to attend the training programme on Project Management Techniques. (Details in Annexure I). 2. The formation of groups, selection of project and choice of supervisor. 3. The project is to be done by students individually ( p r e f e r a b l e ) or in a group of maximum 4 students. 4. The Synopsis of the project is to be submitted to Programme Leader. The Synopsis must be clearly printed in A4 size paper (maximum of 4 pages) duly signed by all members and supervisor. (Synopsis Format attached-Annexure II) 5. Synopsis of the project will be reviewed by a departmental committee for approval. Synopsis may need modification to improve the quality of project.
Grading
A student is awarded a letter grade in Minor Project indicating his/her overall performance S: Satisfactory U: Unsatisfactory
Annexure I
2.
3.
4. 5.
6.
7. 8.
Managing people and organizing teams Understanding behavior, Organizational behavior: a background, Motivation, Decision making, Leadership, Stress Monitoring and control Introduction, Visualizing Progress, Earned Value Analysis
9.
Annexure II
Abstract/Project summary (at least 250 words): Methodology to be adopted:Resource requirement (Hardware & software etc):Justification of the project:PERT Chart/Schedule of project completion:References: Research papers / books / websites etc.:Signature(s) of project team guide Date: Name and Signature of project