You are on page 1of 5

Chevron Bangladesh Drilling Morning Report

Date: 11/10/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,761.43
Water Depth (m) Target Depth (MD) (mKB)

Rpt No: 24 Hours: 24.00 1,097 / 141

SBU Drilling Well Category : Drlg Well Category 1


Depth End (MD) (mKB): 3,038
Field Name Original Spud Date Country

Original KB to Mud Line (m) Target Depth (TVD) (mKB)

Bibiyana
Actual Start Date

6/13/2013
Actual End Date

Bangladesh 4,410
Total AFE Amount (Cost)

7/19/2013 08:30
AFE/WBS Number

3,865.89 22,183,123

100794 Safety/Inspections
Date Safety Check Tour Des

11/10/2013 00:00 11/10/2013 00:00 11/10/2013 01:00 11/10/2013 04:00 11/10/2013 06:00 11/10/2013 06:00 11/10/2013 06:30 11/10/2013 06:30 11/10/2013 06:30 11/10/2013 07:00 11/10/2013 08:00 11/10/2013 08:30 11/10/2013 09:00 11/10/2013 10:45 11/10/2013 11:00 11/10/2013 11:30 11/10/2013 12:00 11/10/2013 12:15 11/10/2013 12:15 11/10/2013 14:30 11/10/2013 14:40 11/10/2013 17:00 11/10/2013 17:00 11/10/2013 17:30

Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting PTW Audit Safety Meeting Safety Meeting

Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night

Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Forklift Ops @BYWP PM on mud pump #1 @BYWP(PTW) General hot work at workshop Gen. Crane Lifting @BYWP Diesel transfer @BYWP(PTW) Gen. Forklift Ops @BYWP w/Kamal Ent., RADAR Cards, Tnt#10 @BYWP Gen. Housekeeping (K/E) @BYWP Service VFD AC@BYWP (PTW) Gen. Forklift Ops Service centrifuge at NOV @BYWP (PTW) Use camera at rig site @BYWP (PTW) Man riding for work on the torque tube @BYWP (PTW) T-Card Audit RADAR, Ops, Tnt#10 & GEMS#02 @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Welding, cutting, grinding at Workshop Man ridding for checking service loop @ BYWP (PTW) Diesel transfer Ops. Review, Tnt#10 @BYWP Install service loop to the TOP drive @ BYWP (PTW) w/Kamal Ent., RADAR Cards, Tnt#10 @BYWP Gen. Housekeeping (K/E) @BYWP Using web sling at rig floor TOP drive maintenance T-Card Audit Using web sling at rig floor TOP drive maintenance RADAR, Ops, Tnt#10 & GEMS#02 @BYWP
Incident Desc

11/10/2013 18:30 Pre-Tour Safety Meeting 11/10/2013 18:30 Pre-Job Meeting 11/10/2013 19:00 Pre-Job Meeting 11/10/2013 19:30 Safety Procedures 11/10/2013 21:30 PTW Audit 11/10/2013 23:30 Pre-Job Meeting Safety / Environmental Incidents
Incident Cat.

No safety or environmental incident.

Page 1/5

Report Printed : 11/11/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/10/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :

Rpt No: 24 Hours: 24.00 1,097 / 141

SBU Drilling Well Category : Drlg Well Category 1


Daily Operations
Report Start Date

Report End Date

11/10/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

11/11/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

217,512
Operations Summary

5,595,345

7,329

493,346

Continued RIH from 2037m to 2559m. Service top drive @ 2559m. Continued ream down from 2559m to 2585m. Troubles shoot TDS. Resume ream down from 2585m to 2595m. Started POOH from 2595m to 1630m.
Comments

00:00 - 04:30: Pump slug at the shoe and continue tripping out with 12 1/4" milling assembly f/1630m t/90m. Rack back stand of DC. 04:30 - 05:30: L/D stg stab, DC, NB stab and flat bottom mill.
Max Drill Gas Required Matls next day Avg Background Gas Head Count

144.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS. Safety Observation Cards
Observation Typ # Rpts Com

76 Observed rope in front of the stair of rig beside the choke manifold could cause trip hazards.Took initiative to remove the rope and clear the trip hazards.Tenet #8 HUMAYUN KABIR-WDI-Crane operator Daily Contacts
Contact

Shayne Atkins Stephen Joubert Jay Darder Kitichai Leekitchakorn Latifur Rahman Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00 10:30 11:00 14:00 14:30 15:00 16:00 19:00

10:30 11:00 14:00 14:30 15:00 16:00 19:00 21:00

INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT

REAM UNITMAIN UNITRPR REAM UNITRPR REAM UNITRPR REAM

10.50 Yes 0.50 Yes 3.00 Yes 0.50 Yes 0.50 Yes 1.00 Yes 3.00 Yes 2.00 Yes

10.50 19 0.50 19 3.00 20 0.50 19 0.50 21 1.00 19 3.00 21 2.00 19

Continued reaming with Reaming/Milling assembly F/ 2037 m T/2559 m Rig and TDS service. Repair broken stud on the brace to the TDS torque tube. Continue to ream in the hole with 12 1/4" mill F/2559 T/2570m. Trouble shoot and repair TDS drive fault error. Continue to ream in the hole with 12 1/4" mill F/2570 T/2585m. Trouble shoot and repair TDS drive fault error. Continue to ream in the hole with 12 1/4" mill F/2585 T/2595m. Exccessive torque, stalling. ROP very slow pushing with mill through formation. Note:Tripped TDS offline a total of 7 occasions. Flow check well. TOH f/2595m. No excessive drag seen while tripping out. TOH t/1630m.
SSE

21:00

00:00

INTCSG2, CSGCMT

TOH

3.00 Yes

3.00 19

Personnel
Company Total Headcount

Chevron Weatherford Weatherford Weatherford

13 19 Rig Expat 42 Rig National 24 Shamolima Catering

Page 2/5

Report Printed : 11/11/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/10/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :

Rpt No: 24 Hours: 24.00 1,097 / 141

SBU Drilling Well Category : Drlg Well Category 1


Personnel
Company Total Headcount

SSE

Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB)

1 3 5 2 2 0 7 0 5 5 1 0 4 0 0 0 11 0 0 0

Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS Solids Control Wireline SLS PetroBangla Inspection Completion/Liner hands WWT BanglaCat Hunting Casing NOV Tech WWS HES SPM

0 Ayun ent

0 Bangla Industrial

0 MD Totco Tech
Mud/Brine Type Sample Source Checked By YP Calc (lbf/100ft)

11/10/2013 22:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)

3,038.0
Gel 10 sec (lbf/100ft)

2,761.43 NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

11.50
Vis 6rpm Vis 300rpm

17.0
Vis 600rpm

30.0
Funnel Viscosity (s/qt)

32.0
PV Calc (Pas)

22 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

10
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)

11
CaCl2 (mg/L)

53
Electric Stability (V)

84
Water Phase Salinity (mg/L)

73 315,900
Retort Water by Volume (%)

59,000
High Gravity Solids (lb/bbl) Corrected Solids (%)

262,676.00 17.03
API Filtrate (cc/30min) API Filter Cake (1/32")

610.0
Retort Solids (% by Volume) (%)

185.89
NaCl (mg/L)

19.50
HTHP Filtrate (cc/30min)

20.00
HTHP Filter Cake (1/32")

60.50 1
Visibility (km)

75.2/24.8 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

3.4
T Low (C)

Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note

Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

19

11/8/2013

11/10/2013

NPT

FSH

OH

Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.

Operator's Other Contractors

Weatherford Casing & Tubing Running, Tubular Running

20

11/10/2013

11/10/2013

NPT

RREQ

DERRICK

Broken stud on TDS torque tube. Repapir and replace.

Rig Contractor Weatherford Accessories, Drilling

Page 3/5

Report Printed : 11/11/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/10/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :

Rpt No: 24 Hours: 24.00 1,097 / 141

SBU Drilling Well Category : Drlg Well Category 1


Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail

Description

Accountable Party

Contractor

19

11/10/2013

11/10/2013

NPT

FSH

OH

Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.

Operator's Other Contractors

Weatherford Casing & Tubing Running, Tubular Running

21

11/10/2013

11/10/2013

NPT

RREQ

TOP DRIVE

VFD fault showing on TDS. Loose cable connections Troubleshoot same. Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.

Rig Contractor Weatherford Accessories, Drilling Operator's Other Contractors Weatherford Casing & Tubing Running, Tubular Running

19

11/10/2013

11/10/2013

NPT

FSH

OH

21

11/10/2013

11/10/2013

NPT

RREQ

TOP DRIVE

VFD fault showing on TDS. Loose cable connections Troubleshoot same. Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.

Rig Contractor Weatherford Accessories, Drilling Operator's Other Contractors Weatherford Casing & Tubing Running, Tubular Running
On Loc

19

11/10/2013

NPT

FSH

OH

Mud Additive Amounts


Des Date Rec Consumed

Barite Base Oil Df1 Job Supply Amounts


Supply Item Des

11/10/2013 11/10/2013
Date Received

15.0 20.0
Consumed Cum On Loc

63.0 125.0

Diesel Drill String/BHA BHA #9, Clean out / Milling BHA


Bit Run Nozzles (1/32") String Components Drill Bit Length (m) String Length (m)

11/10/2013

0.0

12,706.0

142,262.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in) Max Nominal OD (in)

BHA ROP (m/hr)

------240.98 12.25" Milling Bit, 12" N.B. Stab, 8" Drill Collar, 11 3/4" Stg Stab, 8" Drill Collar, X/O 4 1/2IFB x 6 5/8, HWDP, Drilling Jars - Hydraulic, HWDP
Comment

6.500

BHA to clean out and mill Casing Stabilizers and lock rings. String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)

HWDP Drilling Jars - Hydraulic HWDP X/O 4 1/2IFB x 6 5/8 8" Drill Collar 11 3/4" Stg Stab 8" Drill Collar 12" N.B. Stab 12.25" Milling Bit Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)

159.41 9.68 28.05 1.10 27.56 2.47 9.35 2.56 0.80


On Bottom Drill Time (hr)

49.30 49.30

Interval ROP (m/hr)

Original Hole
Cum Depth Drilled (mKB) Pick-Up String Weight (1000lbf)

3,038
Cum Drilling Time (hr)

2,761.43
Flow Rate (gpm) Drilling Torque

3,038
Weight on Bit (1000lbf)

2,761.43
RPM (rpm)

0.00
Stand Pipe Pressure (psi)

0.00
Drill Str Wt (1000lbf)

Weight of String in Air (1000lbf)

Slack-Off String Weight (1000lbf)

30 Page 4/5 Report Printed : 11/11/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/10/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :

Rpt No: 24 Hours: 24.00 1,097 / 141

SBU Drilling Well Category : Drlg Well Category 1


Casing Strings
Casing Description Comment Set Depth (MD) (mKB)

Set Depth (TVD) (mKB)

Run Date

Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts Item Des OD (in) ID (in)

Tubing Strings
Tubing Description Comment Set Depth (MD) (mKB) Run Date

Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)

BOP Test
Date Com

10/29/2013 Wellbores
Wellbore Name

Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Parent Wellbore

Original Hole Directional Surveys


Description

Original Hole
Date

Planned survey Survey Data


Date Description MD (mKB) Incl () Azm () TVD (mKB) VS (m) Date NS (m)

5/27/2013
EW (m) DLS (/30m)

Actual Surveys Survey Data


Date MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m)

7/22/2013
EW (m) DLS (/30m)

Page 5/5

Report Printed : 11/11/2013

You might also like