Professional Documents
Culture Documents
Date: 11/10/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,761.43
Water Depth (m) Target Depth (MD) (mKB)
Bibiyana
Actual Start Date
6/13/2013
Actual End Date
Bangladesh 4,410
Total AFE Amount (Cost)
7/19/2013 08:30
AFE/WBS Number
3,865.89 22,183,123
100794 Safety/Inspections
Date Safety Check Tour Des
11/10/2013 00:00 11/10/2013 00:00 11/10/2013 01:00 11/10/2013 04:00 11/10/2013 06:00 11/10/2013 06:00 11/10/2013 06:30 11/10/2013 06:30 11/10/2013 06:30 11/10/2013 07:00 11/10/2013 08:00 11/10/2013 08:30 11/10/2013 09:00 11/10/2013 10:45 11/10/2013 11:00 11/10/2013 11:30 11/10/2013 12:00 11/10/2013 12:15 11/10/2013 12:15 11/10/2013 14:30 11/10/2013 14:40 11/10/2013 17:00 11/10/2013 17:00 11/10/2013 17:30
Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Pre-Job Meeting PTW Audit Safety Meeting Safety Meeting
Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night
Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Forklift Ops @BYWP PM on mud pump #1 @BYWP(PTW) General hot work at workshop Gen. Crane Lifting @BYWP Diesel transfer @BYWP(PTW) Gen. Forklift Ops @BYWP w/Kamal Ent., RADAR Cards, Tnt#10 @BYWP Gen. Housekeeping (K/E) @BYWP Service VFD AC@BYWP (PTW) Gen. Forklift Ops Service centrifuge at NOV @BYWP (PTW) Use camera at rig site @BYWP (PTW) Man riding for work on the torque tube @BYWP (PTW) T-Card Audit RADAR, Ops, Tnt#10 & GEMS#02 @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Welding, cutting, grinding at Workshop Man ridding for checking service loop @ BYWP (PTW) Diesel transfer Ops. Review, Tnt#10 @BYWP Install service loop to the TOP drive @ BYWP (PTW) w/Kamal Ent., RADAR Cards, Tnt#10 @BYWP Gen. Housekeeping (K/E) @BYWP Using web sling at rig floor TOP drive maintenance T-Card Audit Using web sling at rig floor TOP drive maintenance RADAR, Ops, Tnt#10 & GEMS#02 @BYWP
Incident Desc
11/10/2013 18:30 Pre-Tour Safety Meeting 11/10/2013 18:30 Pre-Job Meeting 11/10/2013 19:00 Pre-Job Meeting 11/10/2013 19:30 Safety Procedures 11/10/2013 21:30 PTW Audit 11/10/2013 23:30 Pre-Job Meeting Safety / Environmental Incidents
Incident Cat.
Page 1/5
Date: 11/10/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
11/10/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)
11/11/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing
217,512
Operations Summary
5,595,345
7,329
493,346
Continued RIH from 2037m to 2559m. Service top drive @ 2559m. Continued ream down from 2559m to 2585m. Troubles shoot TDS. Resume ream down from 2585m to 2595m. Started POOH from 2595m to 1630m.
Comments
00:00 - 04:30: Pump slug at the shoe and continue tripping out with 12 1/4" milling assembly f/1630m t/90m. Rack back stand of DC. 04:30 - 05:30: L/D stg stab, DC, NB stab and flat bottom mill.
Max Drill Gas Required Matls next day Avg Background Gas Head Count
144.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS. Safety Observation Cards
Observation Typ # Rpts Com
76 Observed rope in front of the stair of rig beside the choke manifold could cause trip hazards.Took initiative to remove the rope and clear the trip hazards.Tenet #8 HUMAYUN KABIR-WDI-Crane operator Daily Contacts
Contact
Shayne Atkins Stephen Joubert Jay Darder Kitichai Leekitchakorn Latifur Rahman Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com
INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT INTCSG2, CSGCMT
10.50 Yes 0.50 Yes 3.00 Yes 0.50 Yes 0.50 Yes 1.00 Yes 3.00 Yes 2.00 Yes
Continued reaming with Reaming/Milling assembly F/ 2037 m T/2559 m Rig and TDS service. Repair broken stud on the brace to the TDS torque tube. Continue to ream in the hole with 12 1/4" mill F/2559 T/2570m. Trouble shoot and repair TDS drive fault error. Continue to ream in the hole with 12 1/4" mill F/2570 T/2585m. Trouble shoot and repair TDS drive fault error. Continue to ream in the hole with 12 1/4" mill F/2585 T/2595m. Exccessive torque, stalling. ROP very slow pushing with mill through formation. Note:Tripped TDS offline a total of 7 occasions. Flow check well. TOH f/2595m. No excessive drag seen while tripping out. TOH t/1630m.
SSE
21:00
00:00
INTCSG2, CSGCMT
TOH
3.00 Yes
3.00 19
Personnel
Company Total Headcount
Page 2/5
Date: 11/10/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
SSE
Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB)
1 3 5 2 2 0 7 0 5 5 1 0 4 0 0 0 11 0 0 0
Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS Solids Control Wireline SLS PetroBangla Inspection Completion/Liner hands WWT BanglaCat Hunting Casing NOV Tech WWS HES SPM
0 Ayun ent
0 Bangla Industrial
0 MD Totco Tech
Mud/Brine Type Sample Source Checked By YP Calc (lbf/100ft)
11/10/2013 22:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)
3,038.0
Gel 10 sec (lbf/100ft)
2,761.43 NAF
Gel 10 min (lbf/100ft)
Active Pit
Gel 30 min (lbf/100ft)
11.50
Vis 6rpm Vis 300rpm
17.0
Vis 600rpm
30.0
Funnel Viscosity (s/qt)
32.0
PV Calc (Pas)
22 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)
10
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)
11
CaCl2 (mg/L)
53
Electric Stability (V)
84
Water Phase Salinity (mg/L)
73 315,900
Retort Water by Volume (%)
59,000
High Gravity Solids (lb/bbl) Corrected Solids (%)
262,676.00 17.03
API Filtrate (cc/30min) API Filter Cake (1/32")
610.0
Retort Solids (% by Volume) (%)
185.89
NaCl (mg/L)
19.50
HTHP Filtrate (cc/30min)
20.00
HTHP Filter Cake (1/32")
60.50 1
Visibility (km)
3.4
T Low (C)
Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note
Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor
19
11/8/2013
11/10/2013
NPT
FSH
OH
Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.
20
11/10/2013
11/10/2013
NPT
RREQ
DERRICK
Page 3/5
Date: 11/10/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
Description
Accountable Party
Contractor
19
11/10/2013
11/10/2013
NPT
FSH
OH
Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.
21
11/10/2013
11/10/2013
NPT
RREQ
TOP DRIVE
VFD fault showing on TDS. Loose cable connections Troubleshoot same. Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.
Rig Contractor Weatherford Accessories, Drilling Operator's Other Contractors Weatherford Casing & Tubing Running, Tubular Running
19
11/10/2013
11/10/2013
NPT
FSH
OH
21
11/10/2013
11/10/2013
NPT
RREQ
TOP DRIVE
VFD fault showing on TDS. Loose cable connections Troubleshoot same. Dropped 9 5/8" shoe track and 6 jts of casing in the hole due to misoperation of FMS and spider elevator.
Rig Contractor Weatherford Accessories, Drilling Operator's Other Contractors Weatherford Casing & Tubing Running, Tubular Running
On Loc
19
11/10/2013
NPT
FSH
OH
11/10/2013 11/10/2013
Date Received
15.0 20.0
Consumed Cum On Loc
63.0 125.0
11/10/2013
0.0
12,706.0
142,262.0
------240.98 12.25" Milling Bit, 12" N.B. Stab, 8" Drill Collar, 11 3/4" Stg Stab, 8" Drill Collar, X/O 4 1/2IFB x 6 5/8, HWDP, Drilling Jars - Hydraulic, HWDP
Comment
6.500
BHA to clean out and mill Casing Stabilizers and lock rings. String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)
HWDP Drilling Jars - Hydraulic HWDP X/O 4 1/2IFB x 6 5/8 8" Drill Collar 11 3/4" Stg Stab 8" Drill Collar 12" N.B. Stab 12.25" Milling Bit Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)
49.30 49.30
Original Hole
Cum Depth Drilled (mKB) Pick-Up String Weight (1000lbf)
3,038
Cum Drilling Time (hr)
2,761.43
Flow Rate (gpm) Drilling Torque
3,038
Weight on Bit (1000lbf)
2,761.43
RPM (rpm)
0.00
Stand Pipe Pressure (psi)
0.00
Drill Str Wt (1000lbf)
Date: 11/10/2013
Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:
Total Time: 22.67 Time from Spud: 22.06 Days Since Last DAFW / RI Case :
Run Date
Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts Item Des OD (in) ID (in)
Tubing Strings
Tubing Description Comment Set Depth (MD) (mKB) Run Date
Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)
BOP Test
Date Com
10/29/2013 Wellbores
Wellbore Name
Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Parent Wellbore
Original Hole
Date
5/27/2013
EW (m) DLS (/30m)
7/22/2013
EW (m) DLS (/30m)
Page 5/5