1.0 PRELIMINARIES
1.1
1.2
Obligasi statutory
1.3
Pancang tanda
1.4
Pemeriksaan tapak
1.5
1.6
Insuran kemalangan/kerosakan
1.7
PERKESO
1.8
Insuran kerja
1.9
1.16.1 Pasang
1.16.2 Buka
1.17 Program kerja
1.18 Papan Tanda
1.18.1 Pasang
1.18.2 Buka
1.19 Pemasangan sambungan kekal bekalan air dan elektrik
1.20 Penyediaan dokumen kontrak
1.21 Mengemas/membersih selepas siap
1.22 Ujian proba
1.23
NIOSH
1.24
1.25
1.26
M & E Coordinator
1.27
2.0 BANGUNAN
Site Clearing
2.1.2
Pad Footing
2.1.2.1 Excavate for pad footing
2.1.2.2 Formwork
2.1.2.3 Lean Concrete
2.1.2.4 16mm High tensil bar
2.1.2.5 12mm High tensil bar
2.1.2.6 Concrete grade 35
2.1.3
Stump
2.1.3.1 20mm High tensil bar
2.1.4
Ground Beam
2.1.4.1 Excavate for ground beam
2.1.4.2 Formwork
2.1.4.3 Lean Concrete
2.1.4.4 25mm High tensil bar
2.1.4.5 20mm High tensil bar
2.1.4.6 16mm High tensil bar
2.1.4.7 12mm High tensil bar
2.1.4.8 10mm ms stirrup
2.1.4.9 Concrete grade 35
2.1.4.10
Anti Termite
2.2 FRAME
2.2.1 Column
2.2.1.1 16mm High steel bar
2.2.1.1 10mm links
2.2.1.2 Formwork
2.2.1.3 Concrete
2.2.2
Roof Beam
2.2.2.1 Formwork
2.2.1.2 25mm high steel bar
2.2.1.3 20mm high steel bar
2.2.3
2.4 ROOF
2.4.1
Roof Structure
2.4.1.1 Kerangka T1
2.4.1.2 Kerangka T2
2.4.1.3 Bracing and plates
2.4.2
Roof Finishes
2.4.2.1 Roof decking
2.4.2.2 fibre glass wool, chicken wiremesh etc.
2.4.2.3 aluminium foil
2.5 STAIRCASE
2.5.1
Formwork
2.5.2
Rebar
2.5.3
Concrete
Brickworks
2.6.2
2.6.3
Windows
2.7.1.1 Lintol
2.7.1.2 Naco Frame
2.7.1.3 5mm thick glass panel nako
2.7.2
External Door
2.7.2.1 Lintol
2.7.2.2 Metal Frame
2.7.2.3 Timber Door
2.7.2.4 Ironmongery
2.7.3
INTERNAL WALLS
2.7.3.1 Brickworks
2.7.3.2 Damp proof course
2.7.4
2.7.5
2.7.6
2.7.7
EXTERNAL FINISHES
2.7.7.1 Plaster to wall, column and beams
2.7.7.2 Painting to wall, column and beams
2.7.7.3 Cement render to apron
2.7.8
SANITARY APPLIANCES
2.7.8.1 Sanitary Fitting
2.7.8.2 Accessories
2.7.8.3 OKU toilet
2.7.8.4 Accessories
2.7.9
PLUMBING INSTALLATION
2.7.9.1 Cool water installation
2.7.9.2 2 no 500 gallon water tank
2.7.9.3 Waste water , soil and vent pipe
2.7.9.4 Gully trap
2.7.9.5 Manhole
2.7.9.6 Testing
2.7.10
SUNDRIES
2.7.10.1
2.7.10.2
table top
2.7.10.3
2.7.10.4
counter top
2.7.10.5
Squash equipment
3.1
KERJA-KERJA ELEKTRIKAL
3.1.1 Pemasangan elektrik
3.1.2 Keuntungan
3.1.3 Layanan
3.2
3.3
PENGUDARAAN
3.2.1
Pengudaraan
3.2.2
Keuntungan
3.2.3
Layanan
PENCEGAH KEBAKARAN
3.3.1
Pencegah kebakaran
3.3.2
Keuntungan
3.3.3
Layanan
4.1
4.2
5.1
5.2
5.3
5.4
5.2.1
Saliran, manhole
5.2.2
5.2.3
5.3.2
5.3.3
5.3.4
5.3.5
Hydrant
5.3.6
Paip marker
5.5
Saliran Permukaan
5.5.1
5.5.2
5.7
6.0
5.6.1
Close turfing
5.6.2
Pagar
5.7.1
5.7.2
PENYERAHAN