You are on page 1of 7

74.

13 Supplying, installation, testing and commissioning of septic tank as per IS:2470 Part-I and as per
EIL drg. No. 7-65-0218, with all necessary accessories like inlet, outlet vent pipes, manhole
covers, C.I. steps etc. including earthwork in excavation, backfilling etc. complete as per
drawings, specifications and directions of Engineer-in-Charge.
74.13.01 Septic tank for 10 users - Cement free issue
CI
C2
C3
C4
C18
C6
C7
C8

Y
Y
Y
Y
Y
Y
Y
Y

Rate as per 1.1.01 (Earthwork in exc. in ord. Cum soil (0-1.5m))


Rate as per 1.1.02 (Earthwork in ord. soil Cum (1.5-3.0m))
Rate as per 1.7.01 (Back filling with Cum excavated soil within 100m lead)
Rate as per 1.10.1 (Disposal of surplus earth Cum lead 100m-1km)
Rate as per 2.1.01 (P/L PCC 1:5:10 for all Cum depths below and upto plinth level in foundations)
Rate as per 2.4.01 (P/L RCC M-15 GRADE Cum with 20mm and down size agg. in substructure)
Rate as per 2.2.01 (P/L RCC OF M-15 Cum GRADE with 20mm and down size graded crushed)
Rate as per 2.2.03 (P/L RCC OF M-20 Cum

GRADE with 20mm in substructure..)


Page No. 303

Analysis of Rates - Damanjodi (Orissa, NALCO)


Date: . 13/07/2005
Ref Inc Code Description
Unit
Qty
Rate
Amount
C9 Y
CIO Y
Cll Y
C12 Y
C13 Y
C14 Y
C17 Y
C15 Y
C16 Y
R0
Rate as per 2.25.01 (Centering and shuttering Sqm
in substrs.)
Rate as per 2.7.01 (Re-steel - HSD Bars as per Ton
IS1786 (free issue))
Rate as per 7.1,01 (B.M. with Class 5.0 in 1:6 Cum
C.M. (Substructure) (Cement Free Issue))
Rate as per 25.8 (13 mm thick cement plaster Sqm
in 1:3 cement mortar, (cement free issue))
Rate as per 28.12.04 (150mm dia. embedded Mts
C.I. rain water pipe conforming to IS : 1729)
Rate as per 74.4.02 (CI soil waste and vent Mts
pipe B/G - 100mm dia (Cement supplied free
of cost by owner))
Rate as per 2.31.2.02 (Cement mortar (1 Cum
cement: 2 fine sand) (cement-free issue))
Rate as per 74.11 (S/I/fixing Medium duty CI Each
manhole frame and cover of size 560mm
(IS: 1726))
Rate as per 74.12 (MS rungs of 16 dia) Each
Total

7.30000 78.18
6.00000 85.17
7.50000 43.00
5.80000 89.00
0.660001421.00
0.100001474.00
0.610001584.00
1.160001567.00

570.71
511.02
322.50
516.20
937.86
147.40
966.24
1817.72

Cost Of 1.00000 Each


Rate Per Each
LESS Round Off
Net Rate Per Each
4.40000
0.09600
10.55000
36.00000
2.00000

2.00000
0.05000
1.00000
5.00000
204.03
6070.00
1313.00
52.00

678.92
443.00
838,00
3030.54
79.00
897.73
582.72
13852.15
1872.00
1357.84
886.00
41.90
3030.54
395.00
28705.53
28705.53
28705.53
4.57
28700.96
74.13.02 Septic tank for 20 users CI
C2
C3
C4
C5
C6
C7
C8
C9
C10

Y
Y
Y
Y
Y
Y
Y
Y
Y

Rate as per 1.1.01 (Earthwork in exc. in ord. Cum soil (0-1.5m))


Rate as per 1.1.02 (Earthwork in ord. soil Cum (1.5-3.0m))
Rate as per 1.7.01 (Back filling with Cum excavated soil within 100m lead)
Rate as per 1.10.1 (Disposal of surplus earth Cum lead lOOm-lkm)
Rate as per 2.1.01 (P/L PCC 1:5:10 for all Cum depths below and upto plinth level in foundations)
Rate as per 2.4.01 (P/L RCC M-15 GRADE Cum with 20mm and down size agg. in substructure)
Rate as per 2.2.01 (P/L RCC OF M-15 Cum GRADE with 20mm and down size graded crushed)
Rate as per 2.2.03 (P/L RCC OF M-20 Cum GRADE with 20mm in substructure..)
Rate as per 2.25.01 (Centering and shuttering Sqm in substrs.)
Rate as per 2.7.01 (Re-steel - HSD Bars as per Ton IS 1786 (free issue))
Brick Masonary
Plaster
150 Dia pipe
Mortar
Manhole frame
Ms Runc 16 dia

Page No. 304

Analysis of Rates - Damanjodi (Orissa, NALCO)


Date: 13/07/2005
Ref Inc Code Description

9
7.4
8.6
7.8
0.78
0.15
0.8
1.37
5.4
0.112
11.86
42
2
0.055
1
5

120
140
80
140
3000
4200
4200
4500
300
53300
3000
50
900
2500
9000
300

1080
1036
688
1092
2340
630
3360
6165
1620
5969.6
35580
2100
1800
137.5
9000
1500
74098.1

Unit
Qty
Rate
Amount
Cll Y
C12 Y
C13 Y
C14 Y
C15 Y
C21 Y
C17 Y
R0
Rate as per 7.1.01 (B.M. with Class 5.0 in 1:6 Cum
C.M. (Substructure) (Cement Free Issue))
Rate as per 25.8 (13 mm thick cement plaster Sqm
in 1:3 cement mortar, (cement free issue))
Rate as per 28.12.04 (150mm dia. embedded Mts
C.I. rain water pipe conforming to IS : 1729)
Rate as per 74.4.02 (CI soil waste and vent Mts
pipe B/G - 100mm dia (Cement supplied free
of cost by owner))
Rate as per 2.31.2.02 (Cement mortar (1 Cum
cement: 2 fine sand) (cement-free issue))
Rate as per 74.11 (S/I/fixing Medium duty CI Each,
manhole frame and cover of size 560mm
(IS: 1726))
Rate as per 74.12 (MS rungs of 16 dia) Each
Total
Cost Of 1.00000 Each
Rate Per Each
ADD Round Off
Net Rate Per Each
11.86000

42.00000
2.00000
2.00000
5.00000
1313.00
52.00
678.92
443,00
0.05500 838.00
1.00000 3030.54
79.00
15572.18
2184.00
1357.84
886.00
46.09
3030.54
395.00
32394.60
32394.60
32394.60
6.40
32401.00

74.13.03
CI
Y
C2
Y
C3
Y
C4
Y
C5
Y
C6
Y
C7
Y
C8
Y
C9
Y
CIO
Y
Cll
Y
C12
Y

Septic tank for 50 users - Cement free issue


Rate as per 1.1.01 (Earthwork in exc. in ord. Cum soil (0-1.5m))
Rate as per 1.1.02 (Earthwork in ord. soil Cum (1.5-3,0m))
Rate as per 1.7.01 (Back , filling with Cum excavated soil within 100m lead)
Rate as per 1.10.1 (Disposal of surplus earth Cum lead 100m-1km)
Rate as per 2.1.01 (P/L PCC 1:5:10 for all Cum depths below and upto plinth level in foundations)
Rate as per 2.4.01 (P/L RCC M-15 GRADE Cum with 20mm and down size agg. in substructure)
Rate as per 2.2.01 (P/L RCC OF M-15 Cum GRADE with 20mm and down size graded crushed)
Rate as per 2.2.03 (P/L RCC OF M-20 Cum GRADE with 20mm in substructure..)
Rate as per 2.25.01 (Centering and shuttering Sqm insubstrs.)
Rate as per 2.7.01 (Re-steel - HSD Bars as per Ton IS 1786 (free issue))
Rate as per 7.1.01 (B.M. with Class 5.0 in 1:6 Cum C.M. (Substructure) (Cement Free Issue))
Rate as per 25.8 (13 mm thick cement plaster Sqm in 1:3 cement mortar, (cement free issue))

Analysis of Rates - Damanjodi (Orissa, NALCO)


Date: . 13/07/2005
Ref inc Code Description
Unit
Qty
Rate
Amount
C13 Y
C14 Y
C15 Y
C16 Y
C17 Y
RO
Rate as per 28.12.04 (150mm dia. embedded Mts
C.I. rain water pipe conforming to IS : 1729)
Rate as per 74.4.02 (CI soil waste and vent Mts
pipe B/G - 100mm dia (Cement supplied free
of cost by owner))
Rate as per 2.31.2.02 (Cement mortar (1 Cum
cement: 2 fine sand) (cement-free issue))
Rate as per 74.11 (S/I/fixing Medium duty CI Each
manhole frame and cover of size 560mm
(IS: 1726))
Rate as per 74.12 (MS rungs of 16 dia) Each
Total
Cost Of 1.00000 Each
Rate Per Each
LESS Round Off
Net Rate Per Each
2.00000
2.00000
1.00000
678.92
443.00
0.08000 838.00
1.00000 3030.54
79.00
1357.84
886.00
67.04
3030.54
79.00

15.60000 78.18
12.70000 85.17
12.00000 43.00
12.48000 89.00
1.250001421.00
0.560001474.00
1.510001584.00
2.240001567.00
9.70000204.03
0.196006070.00
17.30000
1313.00
65.00000 52.00
Page No.
305

1219.61
1081.66
516.00
1110.72
1776.25
825.44
2391.84
3510.08
1979.09
1189.72
22714.90
3380.00

47115.73
47115.73
47115.73
14.52
47101.21

74.13.04 Septic tank for 100 users-Cement free issue


CI Y Rate as per 1.1.01 (Earthwork in exc. in ord. Cum 83.50000 78.18 6528.03
soil (0-1.5m))
C2 Y Rate as per 1.1.02 (Earthwork in ord. soil Cum 83.50000 85.17 7111.70
(1.5-3.0m))
C3 Y Rate as per 1.7.01 (Back filling with Cum 16.70000 43.00 718.10
excavated soil within 100m lead)
C4 Y Rate as per 1.10.1 (Disposal of surplus earth Cum 51.50000 89.00 4583.50
lead 100m-lkm)
C5 Y Rate as per 2.1.01 (P/L PCC 1:5:10 for all Cum 5.66000 1421.00 8042.86
depths below and upto plinth level in
foundations)
C6 Y Rate as per 2.4.01 (P/L RCC M-15 GRADE Cum 3.40000 1474.00 5011.60
with 20mm and down size agg. in
substructure)
C7 Y Rate as per 2.2.01 (P/L RCC OF M-15 Cum 4.66000 1584.00 7381.44
GRADE with 20mm and down size graded
crushed)
C8 Y Rate as per 2.2.03 (P/L RCC OF M-20 Cum 8.94000 1567.00 14008.98
GRADE with 20mm in substructure..)
C9 Y Rate as per 2.25.01 (Centering and shuttering Sqm 23.00000 204.03 4692.69
in substrs.)
C10 Y Rate as per 2.7.01 (Re-steel-HSD Bars as per Ton 0.59500 6070.00 3611.65
IS 1786 (free issue))
Cll Y Rate as per 7.1.01 (B.M. with Class 5.0 in 1:6 Cum 50.60000 1313.00 66437.80
C.M. (Substructure) (Cement Free Issue))
C12 Y Rate as per 25.8 (13 mm thick cement plaster Sqm 190.00000 52.00 9880.00
in 1:3 cement mortar, (cement free issue))
C13 Y Rate as per 28.12.04 (150mm dia. embedded Mts 2.80000 678.92 1900.98
C.I. rain water pipe conforming to IS : 1729)
C14 Y Rate as per 74.4.02 (CI soil waste and vent Mts 2.80000 443.00 1240.40
pipe B/G - 100mm dia (Cement supplied free
Page No. 306
Date: 13/07/2005

Analysis of Rates- Daman jodi (Orissa, NALCO)


Ref Inc Code
C15-

C16

C17

RO

74.14

74.14.01
CI
Y
C2

C3

Description Unit
of cost by owner))
Rate as per 2.31.2.02 (Cement mortar (1 Cum
cement: 2 fine sand) (cement-free issue))
Rate as per 74.11 (Supply, installing and Each
fixing in position CI manhole frame and cover
of size 560mm diameter)
Rate as per 74.12 (S/F/F in position in RCC or Each
brick masonry walls for manholes/ valve pit
MS Rungs)
Total
Cost Of 1.00000 Each
Rate Per Each
LESS Round Off
Net Rate Per Each
Construction of soak pit conforming to IS:2470 Part-I and as per EIL drg. No. 7-65-0217,
masonry, filling and hand packing brick bats, connecting with septic tank with necessary fittings,
piping etc. complete as per drawings, specifications and directions of EngineerSoak pit for 25 users
Rate as per 1.1.01 (Earthwork in exc. in ord. Cum
soil (0-1.5m))
Rate as per 1.1.02 (Earthwork in ord. soil Cum
(1.5-3.0m))
Rate as per 1.1.03 (Earthwork in ord. soil Cum

Qty Rate
0.80000

838.00

Amount
670.40

3.000003030.54

9091.62

19.00000 79.00

1501.00

152412.75
152412.75
152412.75
8.32
152404.43

in-Charge.
21.90000 78.18

1712.14

21.90000 85.17

1865.22

16.20000 92.18

1493.32

C4

C5

C6
C19

Y
Y

C7

Y-

C8

C9
CIO
C17
Cll
C12
C18

Y 0362
Y 2604
Y 0982
Y 0937
Y 0124
Y 0114

(3-4.5m))
Rate as per 1.10.1 (Disposal of surplus earth Cum
lead 100m-1km)
Rate as per 7.16 (Brick masonry ( 50B) in Cum
C.M. 1:4 in sub-structure (Cement in
contractors scope))
Rate as per 25.1.07 (12 thk 1:4) Sqm
Rate as per 2.31.3.02 (Cement mortar (1 Cum
cement : 2 coarse sand) (cement-contractor
supply))
Rate as per l. 1.04 (earthwork in-ord, soil (4.5 Cum---- 6.0m))
Rate as per 1.7.01 (Back filling with Cum
excavated soil within 100m lead)
Brick Bats Cum
Bricks Class 3.5 Thd
Coarse sand (zone-Hi) Cum
150 dia, 1.8m long CI Pipe (IS:1729) Each
Mason Class-II Day
Beldar Day

60.00000 89.00

5340.00

2.400001606.00

3854.40

6.00000 62.00
0.005002853.00

372.00
14.27

12.42000.....
100,17-

1244.1-1-

12.60000 43.00

541.80

49.00000 450.00 22050.00


6.244001400.00
8741.60
3.20000 410.00
1312.00
1.39000 970.00
1348.30
5.00000 120.00
600.00
12.00000 120.00
- 1440.00

Page No. 307

Analysis of Rates - Damanjodi (Orissa, NALCO)


Date: . 13/07/2005
Ref Inc Code Description
Unit
Qty
Rate
Amount
C14 Y 0115 Coolie .
C15 Y 0123 Mason Class-I
C16 Y 9999 Sundries for straw for filling
R0 Total
R1 ADD Water Charges 1%
R2 ADD Contractor's profit 15%*(R0+R1)
Cost Of 1.00000 Each
Rate Per Each ADD Round Off
Net Rate Per Each
Day
Day
1 L.S
25.50000
5.00000
25.00000
100.00
150.00
2.00

2550.00
750.00
50.00
55279.16
388.42
5884.55
61552.13
61552.13
47.77.
61599.90
74.14.02 Soak pit for 50 users
CI

C2

C3

Rate as per 1.1.01 (Earthwork in exc. in ord. Cum


soil (0-1.5m))
Rate as per 1.1.02 (Earthwork in ord. soil Cum
(1.5-3.0m))
Rate as per 1.1.03 (Earthwork in ord. soil Cum

30.87000

78.18 2413.42

30.87000

85.17 2629.20

25.57000

92.18. 2357.04

C4

C5

C6
C18

Y
Y

C7

C8

C9
C10

en

Y 0362
Y 2604
Y 0982

C12
C13

Y 0937
Y 0124

C14
C15
C16
C17
R0
R1
R2

Y 0114
Y 0115
Y 0123
Y 9999

(3-4.5m))
Rate as per 1.10.1 (Disposal of surplus earth Cum
lead 100m-1km)
Rate as per 7.16 (Brick masonry ( SOB) in Cum
C.M. 1:4 in sub-structure (Cement in
contractors scope))
Rate as per 25.1.07 (12 thk 1:4) Sqm
Rate as per 2.31.3.02 (Cement mortar (1 Cum
cement : 2 coarse sand) (cement-contractor
supply))
Rate as per 1.1.04 (earthwork in ord. soil (4.5 Cum
- 6.0m))
Rate as per 1.7.01 (Back filling with Cum
excavated soil within 100m lead)
Brick Bats Cum
Bricks Class 3.5 Thd
Coarse sand (zone-in) Cum
150 dia, 1.8m long CI Pipe (IS: 1729) Each
Mason Class-EE Day
Bcldar Day
Coolie Day
Mason Class-I Day
Sundries for straw for filling 1 L.S
Total
ADD Water Charges 1%
ADD Contractor's profit 15%*(R0+R1)

60.00000

89.00 5340.00

2.63000

1606.00

6.59000
0.00500

62.00
408.58
2853.00: 14.27

12.42000 100.17
36.76000

4223.78

1244.11

43.00 1580.68

82.00000 450.00
9.60200 1400.00
4.86000 410.00

36900.00
13442.80
1992.60

1.69444
7.30000

970.00
120.00

1643.61
876.00

19.60000 120.00
40.50000 100.00
7.30000 150.00
35.00000
2.00

2352.00
4050.00
1095.00
70.00
82633.09
624.22
9456.93

Page No. 308

Analysis of Rates - Damanjodi (Orissa, NALCO)


Date: . 13/07/2005
Ref Inc Code

74.14.03
CI
Y
C2

C3

C4

C5

C6
C18

Y
Y

C7

C8

C9
C10
Cll
C12
C13
C14
C15
C16
C17
R0
R1
R2

Y
Y
Y
Y
Y
Y
Y
Y
Y

Page No. 309

0362
2604
0982
0937
0124
0114
0115
0123
9999

Description Unit
Qty
Rate
Cost Of 1.00000 Each
Rate Per Each
LESS Round Off
Net Rate Per Each
Soak pit for 100 users
Rate as per 1.1.0162.06000
(Earthwork
78.18
in exc. in ord. Cum
soil (0-1.5m))
Rate as per 1.1.0262.06000
(Earthwork
85.17
in ord. soil Cum
(1.5-3.0m))
Rate as per 1.1.0352.23000
(Earthwork
92.18
in ord.- soil Cum
(3-4.5m))
Rate as per 1.10.160.00000
(Disposal 89.00
of surplus earth Cum
lead 100m-1km)
Rate as per 7.16 (Brick
2.40000
masonry
1606.00( SOB) in Cum
C.M. 1:4 in sub-structure (Cement in
contractors scope))
Rate as per 25.1.07
6.00000
(12 thk 1:4)
62.00
Sqm
Rate as per 2.31.3.02
0.00500
(Cement
2853.00
mortar (1 Cum
cement : 2 coarse sand) (cement-contractor
supply))
Rate as per 1.1.0412.42000
(earthwork100.17
in ord. soil (4.5 Cum
- 6.0m))
Rate as per 1.7.01107.3800043.00
(Back filling with Cum
excavated soil within 100m lead)
Brick Bats Cum 219.00000450.00
Bricks Class 3.5 .18.70200
Thd. 1400.00
Coarse sand (zone-Hi)
9.46000
Cum 410.00
150 dia, 1.8m long
2.17222
CI Pipe (IS:
970.00
1729) Each
Mason Class-H Day
13.75000 120.00
Beldar Day
52.60000 120.00
Coolie Day
91.50000 100.00
Mason Class-I Day
13.75000 150.00
Sundries for straw45.00000
for filling 1 L.S
2.00
Total
ADD Water Charges 1%
ADD Contractor's profit 15%*(R0+R1)
Cost Of 1.00000 Each
Rate Per Each
ADD Round Off
Net Rate Per Each