Professional Documents
Culture Documents
Key Performance Indicators
Key Performance Indicators
AOI utv
125
120
115
110
105
100
95
90
85
80
Number of user stories
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
8/14/2009
8/15/2009
8/16/2009
8/17/2009
8/18/2009
8/19/2009
8/20/2009
Sida 2
CDF diagram 090814 to 090828
8/20/2009
8/21/2009
8/22/2009
8/23/2009
8/24/2009
8/25/2009
8/26/2009
Sida 3
8/25/2009
CDF diagram 090814 to 090828
8/26/2009
8/27/2009
8/28/2009
production
Sida 4
Release cycle start Release cycle stop Inherited defects New defects Open defects Closed defects
9/1/2009 9/30/2009 0 2 2 1
10/1/2009 10/31/2009 1 3 4 1
Done user stories Defect rate
10 20%
14 29%
4
3.5
2.5
1.5
0.5
0
9/1/2009 10/1/2009
9/1/2009
10/1/2009
10/1/2009
Defect rate
Row 13
Row 14
Row 15
Row 16
Row 17
Row 18
Row 19
Row 20
To design Design done Design time Wait to construction To construction
2/2/2009 2/3/2009 1 1 2/4/2009
2/2/2009 2/3/2009 1 1 2/4/2009
3/6/2009 3/8/2009 2 2 3/10/2009
Construction done Construction time Wait to acc test To acc test Acc test done
2/6/2009 2 4 2/10/2009 2/11/2009
2/6/2009 2 4 2/10/2009 2/11/2009
3/17/2009 7 2 3/19/2009 3/22/2009
Acc test time Wait to RfP To RfP To archive Wait to archive (production)
1 1 2/12/2009 2/28/2009 16
1 1 2/12/2009 2/28/2009 16
3 1 3/23/2009 3/30/2009 7
Total wait time Cycle time (RtP - To archive) Process efficiency
23 27 15%
23 27 15%
14 26 46%