Section A-A

min. 5.50 m

40

60 HRC Elevation 70 70

Front Elevation

16

Bulldog Grips 17 25 40 WC Elevation .................

................. 10

Details of CSM Tower See Drawing No. 20D con 70 or 20D con 106

10 12 13 11 14 8 20 mm, l = 290

4 Erection Hooks

Fractured Rock
150

Tower Foundation 150

11 stirrups 12 mm,c/c 30 (square size 80 x 80) 3 x 12 Anchor Rods 25mm 3 x 5 10 mm, l = 300

65

100

300

Fractured Rock Tower Foundation

Deadman Beam 1 : 30
110

15

Fixation Cable

Handrail Cable 2Walkway Cables Bulldog Grips Erection Hook Bridge Axis Line

Plan View
2 Walkway Cables Handrail Cable

A
Fractured Rock

PE pipe 63 mm* 8 rods 20 mm 11 stirrups 12 mm Anchor Reinforcement 3x12 Ribbed Tor steel 25mm 3x5 10 mm to be placed in excavated foundation 15 35 45 140 45 35

10 13

4 Erection Hooks 20 mm 3 x 12 Anchor Rods 25 mm, c/c = 25

65

100

Scale 1 : 50
All Dimensions are in Centimeter

HMG / Ministry of Local Development


Related Steel Drawing is : 20D4S
Hammer dressed Stone Masonry 1:6 2.02 Concrete 1:2:4 10.50 67.20 Concrete 1:3:6 0.70 3.08 Broken stones 11.25 DoLIDAR / Short SpanTrail Bridge Standard

Standard

Quantities
Hammer dressed Stone Masonry 1:6 12.40 18.60

* 4 nos of PE, 63 mm 3.5 m length per cable end.

Bridge Name No Bank : Span

Construction Drawing:

Chisel dressed Stone Masonry 1:4

Nos & spacing of Bulldog Grips


Cable mm 13 26 32 Nos 3 5 6 Spacing [cm] 10 15 20

[m3] Cement bags


Produced by

RCC Deadman Anchor in Fractured Rock Type 2FRD


Handrail Cables 26 or 32 mm 4 Walkway Cables 26 or 32 mm
Date : Nov. 05, 2001

See drawing no. 20Dcon 70 or 20Dcon106

........... ........... 50

Drawing No. 67D con

Nepal

Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).

You might also like