Contact Consumer Affairs Victoria

Victorian Consumer & Business Centre


113 Exhibition Street Building & Renovating
Melbourne 3000
Telephone: 1300 55 81 81 (local call) A Guide for Consumers
Email consumer@justice.vic.gov.au
Website www.consumer.vic.gov.au

Regional offices are located in Ballarat,


Bendigo, Geelong, Morwell, Mildura,
Wangaratta and Warrnambool.

Revised and updated


September 2007

September 2007
BR-12-01-1023

TIS 131 450


Textphone (TTY) or modem users only, ring
the NRS on 133 677, then quote 1300 55 81 81.
Callers who use Speech to Speech Relay dial
1300 555 727, then quote 1300 55 81 81.

CA BUILDING GUIDE_CVR.indd 1 15/10/07 12:41:07 PM


Additional copies
This guide is available from Consumer Affairs Victoria. You can
attain additional copies by calling 1300 55 81 81 (local call) or
visiting www.consumer.vic.gov.au.

To order more than five copies at a time, fax a request to


(03) 8684 6333 or write to:
Consumer Affairs Victoria
GPO Box 123
Melbourne Victoria 3001

Disclaimer
Because this publication avoids the use of legal language,
information about the law may have been summarised or
expressed in general statements. This information should not
be relied upon as a substitute for professional legal advice or
reference to the actual legislation.

© Copyright State of Victoria 2007

This publication is copyright. No part may be reproduced by


any process except in accordance with the provisions of the
Copyright Act 1968. For advice on how to reproduce any material
from this publication, contact Consumer Affairs Victoria.

ISBN  1 921079 12 6

Authorised by Hon Tony Robinson MP


1 Macarthur Place Melbourne 3000

Published by Consumer Affairs Victoria


121 Exhibition Street Melbourne 3000

Printed by Vega Press 274 Ferntree Gully Road Notting Hill 3168

Printed on recycled paper.

CA BUILDING GUIDE_CVR.indd 2 15/10/07 12:41:07 PM


IFC
Foreword

Building or renovating a home is often the single most expensive


exercise a family can undertake.
In most cases, people who carry out a domestic building project have a
positive experience. However, each year around 2000 consumers make
written complaints to Building Advice and Conciliation Victoria (BACV)
– a Victorian Government service established to provide advice and help
resolve building disputes.
The most common complaints relate to contracts, delays and quality
of work.
Building and Renovating: A Guide for Consumers has been designed as an
essential reference tool to help you avoid such pitfalls while planning
and completing a building and renovating project.
The guide explains building laws and contains hints that will assist you
to successfully plan and complete each stage of your building project.
It also contains important tips, such as using a registered builder and
having project details clearly stated in your contract.
I hope that you find Building and Renovating: A Guide for Consumers
useful. I encourage you to hold onto the guide and refer to it throughout
your entire project. Of course, if you have queries or if problems do
occur, you can always contact BACV at Consumer Affairs Victoria on
1300 55 75 59.

HON TONY ROBINSON MP


Minister for Consumer Affairs

Foreword ➔ 1
Contents
Introduction 3
Avoiding common pitfalls 4
Finance 6
Building for our environment 12
Choosing your block 15
Choosing a display home 16
Extending and renovating 18
Becoming an owner builder 22
Buying off-the-plan 24
Your plans 26
Choosing your builder 29
Your contract 32
Your building surveyor 36
Construction 38
Managing a dispute 40
Completion 41
Fences 42
Keeping your home safe 44
Building definitions 46
Useful contacts 52

2 ➔ Building and Renovating


Introduction

Building and renovating your If you are extending your home Most homeowners are keen to
home can be an exciting, expensive you can: get started with their project so
and complex experience. Before they can enjoy the benefits of
use a larger extension company
you even start to build, there is a their new, extended or renovated
that manages your plans,
lot of information to collect and home. Doing the research to make
council and building permits
important decisions to make. confident and informed choices
and construction
can be time consuming and
If you’re considering building a
use an architect or designer and sometimes seem overwhelming.
new home you can choose to:
a smaller building company
But this could be one of the largest
buy a house and land package
use a small design and build transactions you’ll ever make, so it
build a house based on a display company pays to take your time. Knowing in
home on your own land advance exactly what you want and
become an owner builder.
what you can afford, and placing
build a home through a sales
If renovating, you may need to: the details and price clearly in your
agent
engage a range of tradespeople, contract are the foundations for
use an architect or designer and all satisfying home building and
or
a smaller building company renovating experiences. It also pays
engage a builder to supervise the to seek independent expert help.
use a small design and build
entire project and coordinate
company If you’ve never experienced a home
subcontractors for you.
become an owner builder building project before or if it’s
The level of your involvement in been a while since your last project,
buy a home being constructed the project will vary according to this guide will help you to make
off-the-plan. the option you choose. Volume confident decisions before you sign
builders, large extension companies a contract.
and architects or designers may
design and draw up the plans In addition to reading this guide,
and get permits on your behalf. we encourage you to research,
Architects may also help you shop around, negotiate and take
find the right builder at the your time in making decisions.
right price and provide contract If you have any questions, please
administration during construction. call Consumer Affairs Victoria
But regardless of the size or style on 1300 55 75 59. For the most
of your building project, it pays up to date information visit
to know what you are signing up www.consumer.vic.gov.au.
for when applying for permits and
signing contracts and to get advice
from a building lawyer.

Introduction ➔ 3
Avoiding common pitfalls

Every year over 80,000 Victorians


use a builder to complete a home
Contracts, warranty Builders warranty
building project. While the insurance and In Victoria, builders warranty
majority of homeowners do have registered builders insurance covers costs of up to
a satisfying experience, each year $200,000 for fixing structural
Consumer Affairs Victoria assists For all building works – regardless defects for six years and non-
an average of 2000 people with of the size and price – it is wise structural defects for two years,
disputes. Among these disputes, to have a written domestic but only covers you if your builder
the most common complaints are building contract that includes has died, been declared insolvent
about: plans and specifications for works or has disappeared. In all other
and items to be supplied. All cases, it is up to your builder
poor workmanship, such as building contracts include implied to fix or complete works or
cracks in tiles, plaster, flooring, warranties stating your rights to to pay for any costs awarded.
cabinets and bench tops, leaking good workmanship and work that
plumbing and rooves and is fit for purpose. The contract
poorly laid paving or concrete becomes a crucial document in
Using implied
builders who fail to start, settling any conflict that may later warranties
complete or fix works or arise about what you can rightfully
All domestic building contracts,
take larger deposits and stage expect and what the builder is
regardless of the price, include
payments than allowed by law obliged to supply.
warranties by the builder to:
delays in starting or completing For all building projects over
carry out the work in a proper
work $5000 you and your registered
and workmanlike manner, in
builder must sign a major
price increases resulting accordance with the plans and
domestic building contract. And
from continual changes to specifications set out in your
for all contracts over $12,000 your
contract details after work has contract
registered builder will need to take
commenced. out builders warranty insurance for ensure all materials supplied
We have also found that some work at your home. Only registered by the builder are good and
homeowners run into trouble builders can enter into a major suitable for the purpose and,
because they misunderstand their domestic building contract and unless otherwise stated in the
rights and responsibilities and obtain builders warranty insurance, contract, are new
those of their builder and building so it is vital to use a registered carry out the work in
surveyor. builder. You can check a builder’s accordance with all relevant
registration online at www. laws and legal requirements
buildingcommission.com.au or by
calling the Building Practitioners carry out the work with
Board (BPB) on 1300 36 03 20. reasonable care and skill and
complete works by the date (or
within the period) specified by
the contract

4 ➔ Building and Renovating


Each year
ensure new homes, extensions,
renovations and kit homes
(or similar) are suitable for
occupation when completed
ensure other types of work are
reasonably fit for your intended
purpose. Consumer Affairs
Victoria assists
You can use your contract
warranties to ensure your builder:
uses good workmanship

an average of
delivers everything listed in your
contract
ensures everything is in working
order.

The building
surveyor’s role 2000 people with
building disputes
Many homeowners believe their
building surveyor controls the
quality of the entire project and
will safeguard them against poor
workmanship or works that do
not match the description in their
contract.
This is not the case. The building
surveyor’s role is to issue your
Using independent Independent building consultants
are qualified architects, engineers,
building permit, inspect works to expert help building practitioners or building
ensure they comply with building Before you sign your building surveyors who make inspections
regulations, which primarily contract, it is wise to use an or manage works on your behalf.
relate to health, safety, amenity independent building lawyer to They should carry professional
and sustainability, and issue your ensure that the contract contains indemnity insurance. To find an
occupancy certificate. everything required by the law independent building consultant,
and fairly balances your rights contact a relevant professional
It is your builder’s responsibility
and obligations with those of the organisation or look in the Yellow
to deliver everything included
builder. Pages under building consultants
in your contract. And it is your
and building inspection services.
responsibility to ensure that While your builder is obliged to
everything you want is clearly deliver everything that is included Depending on the scope and price
listed in your contract. If you have in your contract, you can monitor of contract you have with your
any concerns, it is also your role to the progress by communicating independent building consultant,
discuss the issues with your builder regularly and by using an the consultant may need to be
so they can be resolved. Unless you independent building consultant registered to carry out the work.
have technical expertise in the area, to supervise the entire project, or to For peace of mind, it is wise to
you should seek the advice of an make checks before you make stage include the cost of these services in
independent building consultant. payments. your budget.

Avoiding common pitfalls ➔ 5


Finance

Assessing costs per square metre. The standard


of work you require, the ease of
will cost, we recommend that you
add an extra 15 per cent to your
Regardless of which building or site accessibility and whether you estimate, to cover contingencies.
renovating option you choose, choose to do some of the work
it pays to shop around before
committing yourself.
yourself will also affect the final Associated
price.
financial costs
If you’re looking at building a Make sure your building contract
display home, you still need to includes the following costs: Many people take out a home loan
choose the right home at the right to cover the cost of building a new
the building fee, which may home or an extension, while others
price for you.
or may not include the cost of redraw on their existing loan to
If you’ve decided to use a smaller mandatory inspections by the complete renovations or home
building company, you may need building surveyor and may vary improvements.
to talk to architects or draftspeople between companies
and builders to get an idea of the When assessing how much to
planning permit fees (if your borrow, you should also factor in
cost of different sized homes and
council requires a planning additional costs associated with
different quality finishes.
permit) getting a loan such as:
For alterations to a bathroom,
lodgement fee paid to the local legal fees
kitchen, laundry and other
council for recording purposes
rooms, talk to specialist building loan establishment fees
companies and other builders. crossing deposit or asset
Visit display homes and building protection fee paid to the local government charges, such as
advisory centres to help you decide council and refundable at the stamp duty and GST
what you want and what you can end of the project if no damage property inspection fees
afford. has occurred to council property
fees for independent legal and
Obtain a copy of a cost guide inspection fee, a non-refundable technical advice throughout the
to get an idea of building costs fee paid to the council for project
for additions and extensions the cost of their inspection of
and a wide range of renovations furniture storage costs
council assets
and repairs. These are available rent
Goods and Services Tax (GST)
from Archicentre (1300 13 45 13)
moving costs
and Reed Construction Data government levy charges when
(1800 80 60 60). Figures provided the contracted cost of works is building and contents
are general costings. over $10,000. There are three insurance.
levies based on the total cost of
Building prices can vary It is also advisable to include a
your building, which also apply
significantly depending on the margin to allow for potential rises
to owner builders. Your building
builder you select, your choice in interest rates. In the last two
surveyor can advise you of these
of materials, the method of decades, rates have been as low as
costs.
construction, the fixtures and 5 per cent and as high as 17 per
finishes you choose and the Once you have shopped around cent.
economic conditions. Larger works and worked out how much you
achieve a more economical price think your home building project

6 ➔ Building and Renovating


Plan to have
enough funds to
cover unexpected
costs
It is advisable
When shopping around for brokers,
find out if they:
belong to an industry
association

for owner builders are independent or if they only


deal with a certain lender
have professional indemnity

to make their
insurance
are a lender as well as a
broker, as this may affect their

loan application
recommendations
offer a wide range of loans from
a variety of independent lenders

before starting
can justify their
recommendations.
When using brokers it is also

works
crucial that you:
do not pay an upfront fee
make sure they disclose all
fees and commissions prior to
signing you up
ask to see a copy of the
application and any financial
Getting a home loan Lenders details they send to the lender
Home loans are available from on your behalf.
Consumer Credit banks, credit unions, building It is important to note that before
Code societies and finance companies. the broker can begin negotiating
Some building companies offer on your behalf, they must give you
To ensure fair dealing and protect
financial advice or refer you to a a signed copy of the document of
the interests of consumers, all
lender. Some promote loans for appointment. The appointment
lenders must comply with the
100 per cent of the price of the document must state:
Consumer Credit Code that states
lenders must provide: home. Remember, anyone offering the amount of credit or
financial advice must be licensed. It the maximum credit to be
a statement outlining the is wise to get independent financial negotiated
borrower’s rights and obligations advice and compare loans from
independent lenders before signing any requirements as to the term
a pre-contractual statement
up with the lender suggested by of contract
about certain financial
information that must be your builder. the maximum annual
included in the contract percentage rate(s) the client is
a schedule of comparison rates. Mortgage brokers/ prepared to pay

This protects you as a borrower and


finance brokers how long the broker is
appointed for
helps you to compare products. If A mortgage broker can assist in
you need any information about finding the right loan. Even if an agreed maximum amount
credit, call Consumer Affairs you use a broker, it is wise to do of credit application fees and
Victoria on 1300 55 81 81. some research to be sure that the valuation fees the client may be
recommended loan is the right one. required to pay.

8 ➔ Building and Renovating


Lending criteria When shopping around, ask about fees and charges relating to the
policies lenders have for loans loan. For example, the lender’s
For most institutions, your ability to owner builders, the amount advertised interest rate may be 6.30
to borrow will depend on: available as a loan, the equity per cent, but the comparison rate
your income and capacity to required and any other special may be 6.95 per cent. When using
repay conditions. a comparison rate, make sure the
loans you are comparing are of the
the loan to value ratio (a ratio
that compares the total loan
Types of loans same amount and for the same
term.
amount with the purchase price Home loans are generally referred
or property valuation amount) to as a mortgage but there are a The idea of paying off your home
variety of home loans available loan more quickly is very appealing
for new homes, the amount and is used by some mortgage
with different interest rates and
you have as a deposit (most brokers as a method of attracting
payment styles.
minimum deposits are you to their loans. Essentially, there
between 5 and 10 per cent Choosing the right home loan is are only two ways to pay off your
of the purchase price). Some as important as choosing the right home loan much faster:
lenders require proof through builder. Lenders will advise on the
bank statements that a certain types of loan available. Make sure 1. Find a cheaper interest rate
amount of the deposit comes you obtain as much information (which may not exist).
from your own savings. as possible in writing and that 2. Make larger or more regular
you understand the fees, ongoing repayments on your loan.
Most lenders will approve a loan
charges, penalties and other terms
‘in principle’. This allows you to In reality there is no magic trick or
and conditions before signing an
be confident of your spending secret type of loan that will let you
agreement.
limit when planning your building own your home sooner. Substantial
project. The approval is usually There is intense competition savings are only achieved by
valid for six to 12 months but among lenders. The loan that consistently making additional
needs to be renewed after this appears to be the cheapest because payments on your mortgage. You
period. it has the lowest interest rate may therefore need to be very careful
not be the cheapest option in the when brokers claim that you can
Criteria for owner long term. own your home sooner and make
builders You can use a mortgage simulator substantial savings by using a line
and comparison rates to help make of credit mortgage facility.
Lenders generally have stricter an informed choice. Cannex and
criteria for owner builders. Some To anyone paying a mortgage,
Infochoice allow you to compare the idea that you can own your
don’t lend money at all to owner home loans available in Australia.
builders, while others lend only own home free of debt sooner is
These are free services that can be almost irresistible. So how can you
a percentage of the total cost viewed at www.cannex.com.au and
or lend only to building-related really pay off your mortgage faster?
www.infochoice.com.au. Should you refinance? Will extra
tradespeople.
Most lenders have mortgage features, such as a redraw facility,
It is advisable for owner builders to simulator software that creates mortgage offset account or a line of
make their loan application before different models of a mortgage. credit help you? Or should you go
starting works, as it may be difficult This enables you to you enter for a basic ‘no frills’ loan instead,
to get finance once building has various figures for the amount of and make additional payments
begun. If you choose to be an the loan, the duration of the loan, whenever you can?
owner builder, it is also wise to and the frequency of repayments
have a building process plan to (weekly, fortnightly or monthly).
show lenders. This will also help You can compare graphs for each
you to manage your cash flow once model to find out differences in the
you commence the project. It is amount you can pay off each year.
also important to note that some
lenders do not provide mortgage A comparison rate allows you
protection insurance to owner to check the real cost of a home
builders and may charge larger loan. It presents the comparison
inspection and valuation fees. rate as a single percentage figure,
based on the interest rate plus any

Finance ➔ 9
Mortgage insurance Some lenders will help to arrange
Key tips for In some cases an institution may
the First Home Owner’s Grant
reducing your lend you 100 per cent of the
application for their borrowers.
Eligibility criteria and application
mortgage purchase price, requiring no deposit forms are available online from the
at all. If you are borrowing 80 per State Revenue Office of Victoria at
Shop around for the
cent or more of the purchase price, www.sro.vic.gov.au.
best possible interest
lenders generally require you to
rate, because that’s your
pay for mortgage insurance. This
single biggest cost. It’s the
is an additional upfront payment,
Controlling the
underlying rate that counts,
not the ‘honeymoon rates’.
usually in the form of a one-off building contract
premium paid at settlement. price
If you’re thinking of
Mortgage insurance protects the Once you have your loan approval,
refinancing, make sure
lender in case you default on the you need to ensure that your costs
you’ll be better off first.
loan and the sale of the property don’t blow out. To avoid borrowing
Don’t get ‘churned’.
does not cover the amount you extra money that will be difficult
If you want additional owe. It is important to note that to repay, it is important to know
features, look for a low if you default and the mortgage how to control the price of your
interest rate loan that has insurance is paid out, the insurance building contract before you start.
them. Paying an extra company will want you to repay
0.5 per cent interest for the debt. By law, your major domestic
a loan with features that building contract must have a price
Under the Consumer Credit Code, and state the legally permissible
may save you money, will
a lender can require you to take out percentage of total price that you
probably end up costing
mortgage insurance. should pay as deposit when works
you more than you’ll save.
commence, and as stage payments
Make extra regular payments Consumer credit after each stage is completed.
if you can. This will make
the most difference in the insurance Only items permitted by law, such
first few years of the loan, Consumer credit insurance can as prime cost and provisional sum
but can be a good idea at be used to guard against losing items, other identified costs, and
any time. your property by defaulting on variations can cause changes in the
loan repayments due to sickness, price. It is easier to stick to your
You may incur substantial costs original budget and avoid financial
for ending or switching from accident or unemployment.
Carefully consider the costs of this trouble by keeping these to a
certain loans that can include: minimum.
insurance to ensure the benefits
termination or break fees, are worth the outlay. Also, study
for exiting your current loan the terms and conditions for any Permissible deposit
early. For fixed rate loans, restrictions or limitations, such as a The law requires that the deposit
in particular, such fees may three-month limit on cover. you pay can be no more than:
be high. You will also have
to pay the lender’s legal fees Under the Consumer Credit Code, 10 per cent of a total contract
for discharging the mortgage it is against the law for a lender to price that is less than $20,000,
over your property require you to take out this type of or
insurance.
fees and costs associated 5 per cent of a total contract
with the new loan
(application fees, stamp
First Home Owner’s price that is $20,000 or more.

duty on your new mortgage, Grant Only sign your contract and pay
the deposit after you have sighted
valuation and legal fees). The First Home Owner’s Grant your builder’s warranty insurance
scheme provides eligible first Certificate of Currency.
home owners with a non-means
tested, one-off payment of
$12,000 that can be used for the
purchase of an existing home or
to build a new home.

10 ➔ Building and Renovating


Variations to the contract are
changes you or your builder wish
Usual payment schedule to make, or changes that your
building surveyor orders after
the contract has been signed and
Type of contract Percentage of Stage of building building has started. For most
total contract when payment variations, the law requires you
required is made and your builder to agree in writing
to the changes and document the
Contract to build 20 per cent Base stage details, including new price and
to Lock–up stage 25 per cent Frame stage completion date, in your contract
before the work is undertaken.
Contract to build 12 per cent Base stage
to Fixing stage 18 per cent Frame stage Exceptions are variations that the
40 per cent Lock–up stage builder reasonably believes will not:
require a change of price
Contract to build 10 per cent Base stage
all stages 15 per cent Frame stage cause delay
35 per cent Lock–up stage add more than 2 per cent to the
25 per cent Fixing stage original contract price.
Other exceptions are variations
that:
Do not sign a contract and pay If you are considering agreeing
a deposit until after you have to a different payment schedule are required by the building
shopped around and made to the usual one, be sure to seek surveyor, and
informed choices regarding the legal advice and examine your
arise due to circumstances
scope of works and the builder. financial situation carefully. Do
beyond the builder’s control.
When you are ready to sign the not agree to a different payment
contract, ensure that it includes schedule if you cannot afford Keeping variations to a minimum
the usual price schedules and stick to make those payments. Once is vital to controlling your finances
to them. Only agree to a different you sign a contract that includes as continual variations add up and
schedule in exceptional and a different schedule, you are can increase the final contract price
unusual circumstances and ensure obliged to make the payments as above your budget.
you understand the consequences set out in your contract. The best way to avoid variations
of doing so. is to know exactly what you
There is a risk that if you pay too Permissible price want and place all details in your
much for the early stages of the changes contract plans and specifications
project, the builder may be unable before you sign it. That way, except
to finish the work on time or fix Your contract will be easier to for unforeseeable events that are
defects. In some cases builders have manage if you keep prime cost outside of the builder’s control,
taken the bulk of the money early items, provisional sum items and you know exactly how much the
in the project and not finished the variations to a minimum. Prime project will cost.
building at all, leaving homeowners cost items are fittings or fixtures,
with a long and costly legal battle. for example a basin. Provisional
sum items are the supply and
Also, if your builder has died, installation of items, for example
been declared insolvent, or air conditioning.
has disappeared the builders
warranty insurance company Where possible, don’t agree to
may argue that they do not need allowances for prime cost and
to compensate you for advanced provisional sum items. Be specific
payments for work that has not about fittings and extra work by
yet been carried out. including all costs before you sign
the contract, as this will reduce
possible cost increases.

Finance ➔ 11
Building for our environment

Climate change is now a reality.


Drought affects large areas of the
Sustainable energy You can choose to go beyond
the minimum required standard
state, drinking water supplies are rating of energy rating when including
getting low and across the world Designers and builders in many features, materials and systems that
supplies of traditional sources of countries, including Australia, conserve energy and water and
energy are shrinking. Now more now use an energy rating system minimise waste.
than ever, it makes sense to build of stars to indicate the level of These measures will not only
long-term sustainable practices into sustainability achieved in the help reduce harmful carbon
our lifestyles. design and construction of a home. emissions and reduce your energy
Building and renovating provides The more stars your home building bills, but make your home a
a great opportunity to create a plans and specifications achieve, more comfortable place to live.
home design and install efficient the higher the energy rating on Sustainable features also seem
products that lessen your impact your home. to attract home buyers and can
on the environment and save you Victoria has minimum compulsory increase the re-sale value of your
money. It is much easier to build (mandatory) energy ratings home.
sustainable features into your home for residential buildings. It is The following tips list a range of
during planning and construction essential to check these before sustainable features you can choose
than waiting to fit them when the you commence planning and well from to save natural resources and
home is completed. before you apply for a building costs.
permit. To find out requirements
of the current mandatory energy
rating, check with Sustainability
Victoria on 1300 363 744 or at
www.sustainability.vic.gov.au and
the Building Commission on
(03) 9285 6400 or at www.
buildingcomission.com.au.
Accredited energy raters are
available to assess your plans and
specifications to ensure they meet
the current minimum standard
required by building regulations.

12 ➔ Building and Renovating


Energy efficient Saving energy Take advantage of a government
rebate from sustainability
blocks Design all your daytime victoria for installing solar
When choosing a block of land, windows to face north and power, a solar or high efficiency
consider: all evening areas (such as gas hot water system or heater.
bedrooms) to face south,
blocks that enable you to site Purchase new electrical
providing better night time
the home facing north so that appliances with a high energy
comfort in summer. This takes
you get access to the sun. Avoid efficiency rating. In victoria
advantage of the winter sun and
blocks overshadowed in winter major electrical goods such as
reduces your winter heating bills
by buildings, big trees, fences or refrigerators/freezers, washing
by up to 25 per cent. Greater
other obstructions to the north machines, clothes dryers and
savings can be made by using
dishwashers must have energy
rectangular blocks with long double glazing. During summer,
rating labels that enable you
boundaries running north-south the sun is much higher in the
to compare the efficiency of
or east-west, especially blocks sky than in winter, so north-
different makes and models.
less than 500 square metres facing windows are easily
Appliances are rated on a
shaded with an eave or pergola
north-south running blocks six-star scale: more stars indicate
to keep the home cool. In hotter
wider than 11 metres (less if you more efficient appliances with
parts of the state you may also
have a two storey house and lower running costs. Visit
need to also shade windows
can use north windows on the www.energyrating.gov.au for a
with blinds.
upper floor as well) list of energy labelled electrical
Choose a design that gives you appliances.
east-west running blocks wider adequate distance between
than 12.5 metres, except where Choose energy efficient lighting.
your north windows and your
a street or parkland is to the There are many new products
northern neighbour’s lot.
north, in which case blocks can available for a wide range
be narrower and still provide Use a design that maximises of uses. It is now possible to
good solar access north-south ventilation flow to install energy efficient, compact
cool your house during summer, fluorescent downlights and leds
blocks that allow the north rather than relying on air instead of halogen downlights.
windows to daytime living conditioning.
spaces to be placed 4.5 metres or Contact Sustainability Victoria
more from a single storey house Install ceiling fans, rather than for advice on eco-friendly
to the north, or 8.5 metres air conditioning. products and materials, go to
or more from a double storey Use an accredited energy rater www.sustainability.vic.gov.au.
house to the north when planning and designing
blocks that slope down to the an extension, to identify ways to
north maximise energy efficiency. You
may also receive advice on how
north-south or east-west blocks to increase energy efficiency in
which face onto free open space existing rooms.
to the north, such as a street,
backyard or parkland. Install wall insulation in
old parts of your home
when replacing plaster or
weatherboards.
Install heating that has the
highest energy efficiency rating.
In victoria, gas water heaters,
gas room and ducted heaters
must have energy efficiency
rating labels that enable you to
compare products.

Building for our environment ➔ 13


Sustainable features
attract home buyers and
can increase the re-sale
value of your home
Saving water Recycling Reducing litter and
Saving water is paramount on the Use recycled building materials: stormwater pollution
world’s driest continent. there are a number of quality During construction, your
outlets in Victoria that sell builder must use appropriate
Visit www.ourwater.vic.gov.au
recycled timbers, roofing tiles, measures to prevent rubbish
for advice on what you can do
floorboards, windows and doors. blowing off the site and to stop
when building or renovating
See the Yellow Pages, under muddy or chemical laden water
to make your new home or
Building Materials—Second- entering the stormwater system.
renovation as water efficient as
hand. The Environment Protection
possible.
Design your kitchen with space Authority (EPA) of Victoria
Take advantage of government
for bins that allow you to provides information about your
rebates for a range of water
separate rubbish for landfill from builder’s obligations to manage
saving products. To find out
food that can go in the compost the potential off-site impacts of
more visit www.ourwater.vic.
and paper, plastic, glass and tins your project. Details are available
gov.au.
that can be recycled. from the EPA on (03) 9695 2722
Choose water saving devices and at www.epa.vic.gov.au.
Use a compost bin to turn all
that also reduce your water bills:
your green, fruit and vegetable Find out about your council’s
These include rainwater tanks
wastes into fertiliser for your laws relating to containment of
for flushing toilets, systems that
garden. rubbish and other materials on
recycle household wastewater
the site.
and use grey water to flush Use council recycling bins.
toilets, and replacing older taps Get a copy of Asbestos in the
and shower roses with more Home from the Department of
efficient ones. Human Services (DHS) to find
out about safe handling and
Check plumbing regulations
disposed of asbestos, by calling
that provide changes to the
1300 761 874 or visting www.
water flow measures and water
health.vic.gov.au/environment/
pressure reductions at www.pic.
downloads/asbestos_home
vic.gov.au
2003.pdf.
Design a drought tolerant
garden.

14 ➔ Building and Renovating


Choosing your block

When choosing your land you’ll Are there any zoning or local Have you reviewed the natural
probably be influenced by your council planning changes and finished levels of the
budget, and whether you need to underway? block and the crossing and
be near work, public transport, stormwater information?
Is the block suitable for the
schools or other facilities. You
type of home you intend to Do any trees, buildings and
will need to seek expert help
build? associated structures such as
when addressing some items in
foundations and septic tanks
the checklist below. Are services such as gas,
need to be removed?
electricity, water, sewerage and
Checklist the telephone connected? Have you checked whether
the block is prone to termites?
Have you established the Is a legal stormwater discharge
Although your council will
correct location of your point available directly to the
determine whether your block
allotment? Your certificate of allotment?
is located in a designated
title shows your allotment Have you checked with termite area, termites are not
entitlement, however you relevant service providers always confined just to these
need to define your allotment about availability and costs of declared areas. Consequently,
boundaries on the building having services connected? regardless of the location
site to ensure your building, of your block, you should
Does the block and your
when constructed, is correctly carefully consider measures
subsequent plan provide for
positioned. This is determined to protect your new home
privacy, safe entry and exit,
by the position of the survey against termite infestations.
an energy efficient aspect and
pegs located on the allotment
room for all your needs? Is the block located in a flood-
that indicates your allotment
boundaries. A licensed prone, landslip or snowload
Where are the boundaries and
land surveyor can only area?
do you need fences?
position these survey pegs Is your land located in a
Can you get satisfactory
(commonly referred to as a designated bushfire prone
building access to the block?
re-establishment survey). area? If so, you may be
Is the block well drained in required to use special
Have you checked the
regard to potential surface or construction techniques
certificate of title for
sub-surface run-off? when building your home.
restrictions for building
envelopes, easements, Are there any large trees Design and maintenance
covenants and rights of located where you intend to measures to prevent
access? build, or at a distance from it destruction by bushfires can
that is less than 1.5 times the be taken. Contact the Country
Are there any special local Fire Authority (CFA) for
tree’s height?
council planning overlays detailed information on
that apply to the site that may Do you have a copy of the (03) 9262 8444 or visit the
impact on your house design? plan of subdivision for the website at www.cfa.vic.gov.au.
block from the local council?
If so, does it show any cut
and/or filling as extra costs
may be incurred for footings.
Choosing your block ➔ 15
Choosing a display home

Many people decide to build After choosing any variations, Volume builders usually
a house with a large building make sure you ask the sales own the copyright to display
company (volume builder) that person the exact cost of the home designs and plans. This
offers several designs based on home on display and the exact means that you cannot sign a
display homes. This option can cost of building the version that preliminary document and pay
be affordable and can seem you want. It is important to note a deposit for particular plans and
to save time, as the company that changing standard plans can then choose to have the home
already has plans drawn up and lead to significant increases to the built by a different builder.
will usually obtain all permits cost of construction.
If you do sign a preliminary
on your behalf. But there are
When you have chosen a builder, document and decide not to
still important decisions to make
it is wise to choose all your proceed with the building
regarding: which company to
fixtures and fittings before you construction, the builder may be
use, which display model you
sign the major domestic building entitled to keep some or all of the
want, and what changes you
contract. Itemise the details of deposit paid.
want to make to the display
your choices (such as make,
model so that it suits your needs Before entering any agreement,
model, colour or style) in your
and budget. regardless of what it is called, it
contract, and don’t leave any
is wise to seek advice from the
If you are choosing to build a blanks.
Building Advice and Conciliation
home that is an exact replica of
Some volume builders request Victoria service at Consumer
the one on display, the volume
you to sign one or two Affairs Victoria or a building
builder is required by law to
documents before the main lawyer.
include in your contract exactly
contract. These documents are
the same plans and specifications Rather that sign any of these
commonly called preliminary
as those used to build the display preliminary documents, it is
agreements. A preliminary
home. preferable to choose your builder
agreement document may also be
and include all works that you
However, the home on display called a quote, order, preliminary
have agreed the builder will carry
is sometimes the top model in a contract estimate, provisional
out for the construction of your
range. Most volume builders do quote to build on your land,
home in one major domestic
allow you to customise the model authorised tender acceptance or
building contract.
you choose. This means you can contract request.
vary the floor plan, fittings and
These preliminary documents
fixtures to some extent, to suit
may be used in the first instance
your lifestyle and budget.
to obtain a soil report but may
also include costs for drawing up
plans and specifications.

16 ➔ Building and Renovating


Changing standard plans
can lead to significant
increases to the cost of
construction
Extending and renovating

You will need to seek If borrowing money for You can usually count on the
independent expert help to the project, use the finance project costing more and taking
complete some of the checks section in this guide to choose longer than expected. Careful
below. an affordable loan and ensure planning before you start will
you control the price of your help you to manage the project
Checklist building contract. well and minimise disruptions to
your daily life.
Ensure the existing home is Check that your existing
structurally sound. house and content insurance Sometimes older homes don’t
is still valid during the period reveal their hidden faults
Find out if you need local of construction. until the outer layers begin to
council planning and be stripped away. Additional
demolition permits. Get a quantity surveyor to
costs can include restumping,
provide independent advice
Find out if you need a underpinning, rising damp
on the cost of the project.
building permit. repairs, termite eradication,
If using an architect, arrange rewiring and re-plumbing.
Obtain a copy of the for tender documents to be
Title of Land. Check for Be prepared for a change of
forwarded to appropriate
any covenants, building lifestyle; once walls start coming
builders.
envelopes, easements and down there’ll be dust everywhere.
overlays that may restrict Get a copy of Asbestos in the Hang plastic sheets and cover
your building before you get a Home from the Department furniture and appliances for
design and plans. of Human Services (DHS) protection. It is important to note
before your start any that contaminants that can cause
Assess the space that you demolition or do-it-yourself allergies may be used during the
want and can afford. Make a work (see page 14). renovation.
detailed list of your specific
requirements and desires. The Use the information in this You may need to arrange
more detailed and precise guide to successfully plan for temporary use of other
this list, the more satisfied and manage each stage of bathroom, toilet or kitchen
you will be with the finished your project. facilities. Some homeowners
renovation. move out for the duration of
Extending, altering and
the renovation. If you decide to
Decide whether you want to renovating a home can be a
do this, remember to factor the
duplicate the original style of stressful time, whether you
cost of rent into your budget and
the house or add a contrasting are contracting a builder or
liquidated damages (penalties
modern style. completing the work as an owner
stated in your contract that the
builder.
builder is required to pay you
if building goes beyond the
contracted completion date).

18 ➔ Building and Renovating


Sometimes older homes
don’t reveal their hidden
faults until the outer layers
begin to be stripped away
Do it yourself safety information about safe handling
and disposal of asbestos (see
Only climb to the second rung
from the top of a step ladder and
Many people extending, page 14). the third rung from the top of an
renovating and completing small extension ladder. Secure the top of
home improvement projects try
to keep costs down by completing
Using ladders safely an extension ladder into position
before you start climbing.
demolitions themselves, or by You only have to fall one to two
metres off a ladder to be seriously When working from a ladder
doing some of the painting or
injured. Fractured limbs, spinal always work only within arm’s
minor works.
cord damage or even death can reach of the ladder and hold the
result. At least 83 Australians have ladder with one hand. Be careful
Handling asbestos died over the last five years after when pulling items from shelves,
safely falling from a ladder. Thousands gutters or rooves, as this may cause
more have been seriously injured. you to lose balance.
Any home, shed or fence built
before the 1990s may contain Protect yourself before using a
asbestos. Asbestos fibres pose a ladder by checking that it has no
considerable health risk if disturbed rusty, broken or missing parts. It CAUTION!
by sanding, hammering, sawing should also have non-slip safety
and removal. Asbestos can be found Never lean a ladder on an
feet and be the right height for
in asbestos cement and corrugated unstable or slippery surface.
the job.
sheeting and some roof tiles, floor Do not ‘walk’ the ladder to a
tiles, plumbing and under floors or Remember to always place the
new position while still on it.
walls in bathrooms and kitchens. ladder on dry, firm and level
ground. Ensure you engage all locks Do not push or pull against
Whether you are completing and fully open a step ladder. Keep other objects when up the
demolition, small do-it-yourself the ladder clear of powerlines and ladder.
jobs, working as an owner builder exposed electrical wiring and place
or engaging a handyman, it is Do not use a ladder if you
the foot of an extension ladder at a
crucial to: are affected by medication
distance from the wall that is equal
or you have a medical
identify asbestos material that to a quarter of the length of the
condition that can cause
you may disturb in the process ladder.
you to lose your balance.
handle asbestos safely When climbing the ladder wear
Never have more than
well-fitting, enclosed shoes and
dispose of asbestos safely. one person on the ladder
always have someone holding the
at a time.
Get a free copy of Asbestos in the ladder at the base. As you climb,
Home from the Department of hold the ladder with both hands
Human Services (DHS) for detailed and carry tools in a tool belt.

Extending and renovating ➔ 19


Avoid using Choose tradespeople
carefully
Check the reputation and

itinerant traders qualifications of tradespeople


before signing up with them. Ask to
see examples of their work and to

who knock on
speak with recent clients.
Ask to see the tradesperson’s
certificate of currency for
public liability insurance,

your door or
which will protect you or third
parties against any damage the
tradesperson may cause.

telephone you
Check the Choosing a builder
section of this guide (page 29)
for trades that are required to be
registered or licensed. If using these

out of the blue


tradespeople, ask for their licence or
registration number.
Only engage tradespeople who can
provide you with a physical address
and landline telephone number,
rather than those who will only
provide a mobile phone number.
Small renovations Minor works Ensure you get their registered
business name along with other
and repairs contracts contact details.
It is wise to request a written minor Avoid using itinerant traders who
Council permits works contract before any work knock on your door or telephone
Before engaging a tradesperson commences for all projects under you out of the blue with incredibly
to complete small renovations $5000 so that you and the builder cheap deals on roofing, asphalting,
and repairs, contact your local or tradesperson are clear about each concreting or painting. They
council to find out whether any other’s obligations, the details of usually only offer the deal for
permits are required for the works the work to be completed, the price a short period and seek a large
you are considering. For instance, and the timeline for completion. deposit before disappearing without
some councils require you to get Remember that you are required completing the job. Since itinerant
a planning permit before painting to complete a major domestic traders do not have a fixed address
the exterior of your home or building contract for works over or legitimate registered business
replacing your roof or guttering. $5000. See the section in this guide name, they are very hard to trace if
You may also need a building on contracts (page 32) for full you want to get your money back
permit for some smaller works. details. or get a job completed.

20 ➔ Building and Renovating


Becoming an owner builder

Owner builders use their own


skills to complete building works
Many people choose to become
an owner builder to reduce the
Rights
on their home or to manage sub- cost of building. But in reality, As an owner builder, if you
contractors who carry out the work. completing a building project enter a contract with a
can be like running a small tradesperson for any building
As an owner builder you are
business. Skills in research, work that is over $5 000 you are
responsible for a range of tasks
administration, organisation, entitled to the protections of
which may include insurance,
finance and communication are the Domestic Building Contracts
occupational health and safety
just as important for the owner Act 1995.
of workers on the site, arranging
builder as building skills. Above If you enter a contract with
permits and inspections, and
all, you need plenty of time to a tradesperson (who is not
ensuring tradesmen have
prepare thoroughly, make well- carrying out exempt building
appropriate registration and
informed choices of tradespeople work) for building work over
insurance.
and carefully supervise all $12,000, that tradesperson
Owner builders may: stages of the project. Without should also have builders
meticulous planning, you may warranty insurance.
undertake all or part of the
end up spending much more than
building works themselves,
you expected and find yourself
except in areas that require
lacking the experience to deal with Tips
licensed tradespeople, such as
complex situations. Clearly plan and define the
electricians and plumbers
scope of works you want
contract out all or part of
the work to appropriate
Obligations completed by tradespeople.

tradespeople Owner builders completing Choose and appoint a building


works that cost over $12,000 surveyor to issue your building
engage a building consultant to permits, inspect for compliance
must obtain a Certificate
check the quality of the work. with building regulations and
of Consent from the BPB.
Advantages of being an owner Application forms for the issue relevant certificates on
builder include: Certificate of consent are completion.
contained in the Owner builder Follow tips throughout this
increased control over the whole
Application Kit provided by guide to ensure smooth
project, including the design
the Building Practitioners management of finances,
saving the cost of the builder’s Board (BPB) on 1300 360 320. contracts and construction.
margin
more flexibility.

22 ➔ Building and Renovating


Without meticulous
planning, you may end
up spending much more
than you expected
Buying off-the-plan

Purchasing a building before it has If you have purchased an off-the- Other issues to consider when
been constructed is commonly plan home and find that there are buying off-the-plan are the selling
known as buying off-the-plan. The building defects, you are entitled price, possible changes to the plans
design of the building and sketches to approach the builder about after works have commenced and
of its final appearance may be these defects, as they are covered the quality of finish in the final
included in advertising material by the implied warranties in the product.
well before occupation is possible. Domestic Building Contracts Act 1995
that run with the land. In some
People are often attracted to off-
circumstances, you may also have
the-plan sales by the reduced
an entitlement to builders warranty
stamp duty they are required
insurance.
to pay. Be aware that you are
still required to pay stamp duty If you find defects in your off-
when buying off-the plan. The the-plan home, initially bring
amount payable depends on how these defects to the attention of
advanced the construction of the the developer, and seek to resolve
building is and its current value: the issue. If this fails to achieve
the closer the construction is to a solution, you may contact the
being completed, the higher the builder directly.
stamp duty.
Contact the State Revenue Office
to find out about stamp duty on
13 21 61 or at www.sro.vic.gov.au.

24 ➔ Building and Renovating


Be aware that you
are still required
to pay stamp
duty when buying
off-the-plan
Your plans

Volume builders usually supply It is important to note that Architects and designers retain
plans and specifications and obtain architects or designers cannot copyright on drawings, plans and
planning and building permits for prepare drawings or specifications documentation provided under
you. But if you are using a smaller for building construction works your contract. This means you can
building company to build your unless they: only use the plans once, and only
new home or extension, you may on the site they were designed for,
are registered with the ARBV
need to get a design and suitable unless agreed otherwise. It is wise
in the case of architects; or the
plans and specifications. to have your contract checked by a
BPB in the case of designers/
building lawyer before signing.
draftspeople, and
Using an architect or have professional indemnity
Under your contract, your architect
designer/draftsperson insurance, and
or designer/draftsperson may:

Architects and designers/ liaise with the builder


in the case of architects, comply
draftspeople can offer a full service with professional conduct ensure contract specifications
that may include designing and regulations. are met
drafting and obtaining engineering
computations, foundation data and You can contact the ARBV on inform you of progress
planning and building permits. (03) 9417 4444 or at www.arbv.
work with you to approve
They can help you by developing vic.gov.au and the BPB on
variations
a design that makes the most of (03) 9285 6400 or at www.
your existing home or your block buildingcommission.com.au. certify progress payments
of land. If you are choosing your own identify defects and administer
Registered architects must have architect, designer or draftsperson, their rectification
the necessary qualifications and it is important to note that
decide if the work is complete
experience and must have passed fees are subject to open market
according to your plans and
examinations set by the Architects competition. There are no standard
specifications.
Registration Board of Victoria rates: fees may be based on a
(ARBV). percentage of the cost of works, a For more details, contact the
lump sum, or an hourly rate. ARBV for a copy of their brochure,
Designers/draftspeople must have Working with your Architect or visit
the necessary qualifications and The architect or designer/
the Building Commission’s website
experience and must have satisfied draftsperson should provide
at www.buildingcommission.
the requirements of the Building you with a written contract that
com.au for other information to
Practitioners Board (BPB). outlines the level of services being
consider before embarking on your
provided and what you are getting
project.
for your money. This is to ensure
both parties understand their rights
and obligations.

26 ➔ Building and Renovating


Architects
and designers
retain copyright
on drawings,
plans and
documentation
Ensure your plans Local planning laws Sustainability
suit your land, your Planning permits relate to the Before your plans are drawn up,
budget and the law zoning of your land according to
its use.
it is wise to consider including
features that conserve energy
It is important to ensure that your and water and minimise waste,
plans are complete and take into Before starting to build or renovate
including current mandatory
account the cost of excavation and you or your agent (builder/
energy rating requirements.
relevant local council laws and architect/designer/draftsperson)
See the section Building for our
building regulations, otherwise you must find out from your local
environment on page 12 for full
could end up paying for plans you council whether you need a
details.
cannot use or will need to change. planning permit. If so, you must
obtain one before you can be issued
Regardless of who draws up your with a building permit. Update your plans
plans, it is important that they
have the following information
before signing the
before they start:
Foundation data contract
By law, the builder must obtain Once you have chosen your
foundation data, including soil
foundation data relating to your builder or building company,
tests so that they know the
building before entering the you may discuss some changes
depth of foundations required
contract. to your original plans. Make sure
and the cost of excavations
Volume builders selling house your plans and specifications are
whether the site has been updated and include all details
and land packages should do this
surveyed by a licensed land before you sign the contract. You
for you. But you can obtain the
surveyor. Any variations in the may need to seek advice from a
foundation data yourself, either
levels for sloping blocks may building consultant to check this.
through your architect or designer,
contribute to increased costs for You or your builder may also need
or by engaging a geotechnical
excavation or extra bricks. You to go back to the council to have
engineer. You can then provide the
need to include these costs in the changes approved.
foundation data, along with your
your budget
plans and specifications, to builders This is the stage where you need
local council laws that require you approach for a quote. to make absolutely sure that
design consideration everything you want is in the plans
the features you want to include and specifications. Doing this can
that comply with the current save you money because continual
mandatory energy rating variations add up and can increase
requirements set out in building the final contract price above your
regulations. budget.
You may need the assistance of a
building consultant and building
lawyer to check these aspects of
your plans.

28 ➔ Building and Renovating


Choosing your builder

Registered builders For further information contact: erecting a chain wire fence to
enclose a tennis court
The Building Practitioners Board
Domestic builders in Victoria must
(BPB) 1300 36 03 20 www. erecting a mast, pole, antenna,
be registered for all contracts over
buildingcommission.com.au aerial or similar structure.
$5000, except for those tradepeople
who do not require registration. Architects Registration Board If any tradesperson uses a
The Building Practitioners Board of Victoria (ARVB) 9417 4444 combination of trades, such as
(BPB) is an independent statutory www.arbv.vic.gov.au painting and tiling, to complete
body administered by the Building work that exceeds $5000, then
Energy Safe Victoria
Commission. It is responsible they will need to be registered.
(03) 9203 9700
for registering Victorian builders
www.esv.vic.gov.au
and building professionals and
supervising and monitoring their Plumbing Industry Commission
Getting quotes
conduct and ability to practice. (03) 9889 2211 It is very important to shop around.
Some extension companies and
To be registered with the BPB,
building practitioners must Tradespeople who specialist companies (for example
kitchen and bathroom suppliers)
have the required qualifications, do not require do not provide you with detailed
knowledge, and expertise and carry
builders warranty insurance. registration information and a price unless you
sign a contract and pay a deposit
Other building practitioners It is advisable to have a written for plans and specifications.
include building surveyors, contract for these one-off contracts.
Tradespeople do not need These contracts sometimes give
building inspectors, quantity copyright ownership of your plans
surveyors, engineers engaged in registration to complete one-off
projects such as: to the builder. Signing this type
the building industry, draftspeople, of contract means you cannot
commercial and domestic builders, attaching external fixtures use the plans elsewhere, despite
demolishers, and persons who (including awnings, security paying for them.
erect temporary structures. screens, insect screens and
balustrades) Don’t lock yourself in with a
All plumbers, gasfitters and builder – either by signing over
drainers must be registered or electrical work copyright to the plans or entering
licensed with the Plumbing a major domestic contract – unless
glazing
Industry Commission and must you have made an informed
carry an identification card. installing floor coverings choice and everything you want
Electricians are licensed by the insulating is clearly stated in your contract.
Office of Electrical Safety. If you change your mind after any
painting cooling-off period you may lose
Architects may be referred to as
plastering your deposit and your plans.
building practitioners if they are
registered with the ARBV and carry plumbing work as defined in Whether you are building a new
appropriate insurance. section 221C of the Building home or renovating, it is important
Act 1993 to choose a registered builder you
can communicate with easily, have
tiling (wall and floor)
confidence in and feel you can

Choosing your builder ➔ 29


work with for the duration of the doing an online search at www. Find out about a builder’s
project. Remember, your builder buildingcommission.com.au. reputation by checking:
is not your mate: your builder is
Ask to see the most recent work of the Domestic Building List
providing a service that you are
builders you are considering. Ask of the Victorian Civil and
paying for.
their recent clients: Administrative Tribunal (VCAT).
After getting at least three quotes, This will show whether any
Did the builder start and finish
compare: builders you are considering
on time?
have been a party to any recent
the written quotes you receive.
Were they able to communicate domestic building dispute.
Make sure you know exactly
regularly and clearly with the Details are listed on the VCAT
what the quotes cover – the
builder about any changes website at www.vcat.vic.gov.au
cheapest may have exclusions
suggested by either party
or give a base rate that doesn’t for any enforceable undertakings
or about queries relating to
cover the cost of the actual and prosecutions against the
quality?
materials and finishes you want builder by Consumer Affairs
Did the price increase? Was Victoria. These are listed at
reports from previous clients
the reason for and amount of www.consumer.vic.gov.au
the builders’ recent work. the increase reasonable and
for any breaches by the builder
agreed to?
You can pay an independent quantity of domestic building laws and
surveyor to assess your plans and Did the builder place details and regulations and other consumer
give you an estimate of the cost. prices of changes suggested by laws. These are listed in the
This can help you when comparing either party in writing and get Consumer Affairs Victoria Annual
quotes from builders. Decide which them signed off before making Report, also available online
builder is most likely to: changes?
for any prosecutions or
deliver value for money Did the builder’s sub-contractors disciplinary action against
arrive on time and do a good the builder by the BPB. These
listen to your needs and wants
job? are published in the Building
give you clear and regular Commission’s Inform magazine
Did the builder request any
updates on the progress of the which is available at www.
changes to the size of stage
building buildingcommission.com.au.
payments in the contract or ask
be trustworthy as a business for payments before a stage was If you have employed an architect,
person and skilled builder. complete? (This can be a sign of building designer or a draftsperson,
cash flow problems.) ensure that everything you want is
A good working relationship
between client and builder is clearly defined in your plans and
Were the clients satisfied that
fundamental to the success of a specifications and conveyed to the
the quality of the work matched
domestic building project. Make builder.
the details placed in their
sure you are able to communicate contract? If the builder is in charge of the
clearly, verbally and in writing, with design of the project, the scope of
Ask your architect (if using one) to
your potential builder. Ensure that the works should be clearly defined
recommend two or three builders
you will be able to meet regularly. in the written quotation showing,
who have done good work for
It is important to note that you do wherever possible, type, make
previous clients.
have legal rights to visit the site to and model number of items and
check progress and quality. Find out how long the builders accurately estimated quantities.
you are considering have been
Analyse quotes thoroughly. The
Tips for choosing in business and whether they
have always traded under the
cheapest quote may not be the
your builder same name. You can do this by
best choice. It could be that certain
items have been missed out which
Ask your family or friends if they contacting the Australian Securities
are included in a more expensive
can recommend a registered builder and Investment Commission
but properly detailed quote.
they have recently used. (ASIC) on (03) 5177 3988 or at
www.asic.gov.au. If you have doubts about whether
Check the registration of builders you can get along with a potential
you are considering with the BPB builder, keep looking. Your ongoing
by calling 1300 36 03 20 or relationship will dictate the success
or otherwise of the project.
30 ➔ Building and Renovating
Get at least three quotes
and analyse them
thoroughly. The cheapest
quote is not necessarily
the best one
Your contract

Works requiring Contract Essential contents


contract requirements It is wise to pay a building lawyer
(not one acting for the builder) to
A written major domestic building A major domestic building contract
check the contract and give you
contract is required by law for is a legally binding agreement
advice on any areas that you need
most building works over $5000, you make with your builder to
to change. Using a building lawyer
including: carry out, arrange or manage your
can protect you in the long run,
project. The contract must have a
erection or construction even though seeking such advice
price and should contain plans and
of a home and associated means that you no longer have a
specifications that detail everything
landscaping, paving, retaining cooling-off period.
you want. It should also contain
structures, driveways, fencing,
a warning on how the price may Your contract must include these
provision of lighting, heating,
vary. items:
air conditioning, water supply
or sewerage The specifications should include full details of the terms of the
details of materials, quantities, contract written in English
renovations, alterations,
colours and appliances, including
extensions, repairs and any a detailed description of the
make, model number and
other improvements to a home work, including plans and
manufacturer/supplier. If the term
specifications that contain
work associated with the ‘the builder’s range’ or similar is
enough information to obtain a
renovation, alteration, extension used in the contract, the contract
building permit
or repair of a home, such as specifications should accurately
landscaping, paving, retaining describe what that range is. names and addresses of the
structures, driveways, fencing, parties to the contract
Remember, it is easier to control
garages, workshops, swimming
the contract price and stick to the builder’s registration number
pools or spas
your budget by keeping prime cost with the Building Practitioners
preparation of plans or items, provisional sum items and Board (BPB)
specifications by the builder for variations to a minimum. See the
the date when work is to
the work Finance section in this guide for
start or how that date is to be
details on how to control your
demolition or removal of a determined
contract price (page 6).
home
a statement that the builder will
By law, the builder must give you
any work associated with the do everything that is reasonably
a fully signed copy of the contract,
construction or erection of a possible to start work as soon as
including plans and specifications.
building on land zoned for possible if the start date is not
You are also entitled to receive
residential purposes and for known
copies of any other documents
which a building permit is
relating to the building project, a finish date or the number of
required.
such as foundation data or days required to finish the work
building permits. if the start date is not known.

32 ➔ Building and Renovating


You can only make a
builders warranty insurance
claim if your builder has
died, is insolvent or has
disappeared
the contract price and legally
acceptable deposit and payment
a waiver or negation of implied
statutory warranties, such as
Builders Warranty
schedule, including warnings those applying to fair and Insurance
in relation to progress payment reasonable standard of work, After you’ve signed the contract,
methods unreasonable time delays and your builder must take out
price increases warranty insurance for work on
the date of the contract
a cost escalation or ‘rise and fall’ your home.
details of builders warranty
clause, unless the contract price Make sure you receive a Certificate
insurance cover
exceeds $500,000. The onus is of Currency for the builders
a Notice of your right to a five on the builder to calculate into warranty insurance that applies to
day cooling-off period the contract price any likely works at your property. Contact
rise in costs caused by inflation, the insurer to check that the policy
a section including definitions
wage increases, and the like. If number is correct and applies
of words used in the contract
the builder wants to include to your home. Do not pay your
the checklist required by a cost escalation clause, the deposit until you have sighted the
law. This can be seen at Director of Consumer Affairs Certificate of Currency.
www.consumer.vic.gov.au Victoria must approve it. To
date, the Director of Consumer Remember, you can only make a
the implied warranties in the builders warranty insurance claim if
contract. Affairs Victoria has not approved
any cost escalation clauses your builder has died, is insolvent
or has disappeared.
Illegal contract items the expression ‘practical
completion’ is now obsolete.
Make sure the contract does not If you find it in your contract,
include any of these items: delete it and insert ‘complete in
a compulsory arbitration clause accordance with the plans and
specifications’.
a caveat (a warning of some
right or interest on the land
title) on the building site land

Your contact ➔ 33
Tips If your home is based on a
display model, do the plans
If you have to sign a separate
warning in relation to progress
Before signing your contract, and specifications include payment methods, have you
check that you can answer ‘yes’ to customised items and all received advice from a building
these questions. You may need the requested variations in design, lawyer on this?
assistance of a building lawyer and materials, finishes and costs
Do you understand the
building consultant to be sure. clearly described and illustrated
procedure for variations of plans
Have you obtained approved in your contract? (See Choosing
and specifications?
finance for the building works? a display home on page 16 for
further details.) Are the start and finish dates
Is the builder registered with the clearly stated?
BPB? Are provisional sum or prime
cost items clearly stated in Is the procedure for delays
Has the builder verified to you schedules? and extensions of time clearly
that tests to assess the site for stated?
suitability for the proposed Have you checked that there
is a Certificate of Currency for Are penalty payments for
works have been carried out?
the builder’s warranty insurance exceeding the time for
Have you or the builder/ that applies to work on your construction (liquidated
architect/designer/draftsperson property? damages) clearly stated and
on your behalf, obtained sufficient to cover your costs,
required building permits and/or Do you understand that you
eg. rent?
planning permits from a private should not pay a deposit until
you have seen the Certificate Is the clause containing the five
building surveyor and/or the
of Currency for the builders day cooling-off period included?
local council?
warranty insurance?
Do you understand the
Is the work shown and clearly
Is the deposit within the legal circumstances in which the
described in the contract, plans
limit? builder or owner can end the
or specifications and any other
– a maximum of 10 per cent if contract?
relevant documents such as
engineering computations or the price is less than $20,000, Have you had the contract
soil report? or for long enough to read it
– a maximum of 5 per cent if thoroughly and have it checked
Have you included all special
the price is $20,000 or more. by independent experts?
requirements and finishes in
your plans and specifications? Are the price and progress
payments in accordance with
the law and clearly stated?

34 ➔ Building and Renovating


You may need
the assistance of
a building lawyer
and building
consultant
Your building surveyor

Building permits Note that your building surveyor


does not check the quality of
Do not sign the building
permit as an Owner Builder,
A building permit is written workmanship. You can engage an unless you intend to take full
approval from a registered independent building consultant to responsibility for the project and
building surveyor that shows your do this, if required. have been granted an owner
approved plans and specifications builder’s Certificate of Consent by
Building surveyors are listed in
comply with building regulations, the Building Practitioners Board.
the Yellow Pages or can be
and allows building works to
contacted through the Australian When applying for your building
commence.
Institute of Building Surveyors permit, you or any person acting
You can find out whether on (03) 9415 7600 or through on your behalf may need to
your works require a building the Building Commission at provide a range of documents such
permit by asking a registered www.buildingcommission.com.au as the application form, title details,
building surveyor or checking under Finding a RBP. land survey, plans. Consult your
with the Building Commission building surveyor for a detailed list.
on (03) 9285 6400 or at www.
buildingcommission.com.au.
Applying for a Your building surveyor will request

A building permit can be obtained


permit a fee, assess your application and
grant you the permit or request
from a registered private or council If your builder is acting on your changes to ensure the plans and
building surveyor. behalf to get a building permit, you specifications comply with building
must provide written authority in regulations.
your contract or a separately signed
Choose your own document. Be sure to read the Your building surveyor carries out
building surveyor permit application and only sign if inspections to check that building
you agree. regulations have been met. During
Although you or an agent you construction of a new home or
appoint to act on your behalf It is important to note that if you extension, inspections will occur
(including your builder) can choose appoint your builder to obtain a at base (foundation), frame and
a building surveyor, it is preferable building permit on your behalf, completion stages, and other
to choose your own. This way you you may not have any involvement inspections as specified in the
can be confident that your building in choosing your building surveyor building permit. Remember, your
surveyor will perform independent or the details of the application building surveyor does not ensure
inspections and feel free to instruct documents. In this case you should that the works comply with your
your builder to make any changes receive a copy of the permit once it contract.
needed to comply with building has been issued.
regulations.

36 ➔ Building and Renovating


Your building
surveyor does not
ensure that the
works comply with
your contract
Construction

Carefully check the Make sure that you:

progress of your provide the builder with items


you agreed to supply on time
project
put the details and costs of
Check the progress of your building variations you and the builder
project and communicate regularly agree to in writing and both
with your builder. Remember you sign off on them before the
can only get the materials, size, builder makes the changes.
style and quality of items and (See Controlling the price of your
works specified in your contract. contract in the Finance section
Ask your building surveyor about for more details on variations on
and obtain written verification on page 6)
the outcome of each inspection make stage payments when
so you can be confident that the requested and when the work
works inspected comply with for each stage is complete.
building regulations. Do not make payments in
You can also engage an advance. If your builder has
independent building consultant died, has become insolvent or
or architect to administer the has disappeared, the builders
entire project for you and/or to warranty insurance company
make independent checks before may argue that they do not
you make stage payments. This need to compensate you for
will help you feel confident that advanced payments for work
the work has been completed that has not been carried out.
according to your contract plans
and specifications and implied
warranties.

38 ➔ Building and Renovating


Do not make
contract payments
in advance
Managing a dispute

Act immediately if Dispute resolution If there is evidence that builders


have broken the law, Consumer
things go wrong services Affairs Victoria can take action
If you feel that works are If you and your builder are unable against them, including seeking
incomplete, different from what’s to reach agreement on how to redress for affected consumers.
in the contract, different from resolve a dispute, you should first BACV conciliators may suggest
what you believe you were offered seek free government assistance homeowners take disputes to
under the contract, or defective you through Building Advice and Victorian Civil and Administrative
should: Conciliation Victoria (BACV), a Tribunal (VCAT) when it is clear
joint service run by Consumer that agreement cannot be reached
immediately discuss this issue
Affairs Victoria and the Building through voluntary conciliation.
with your builder in a calm and
Commission.
business-like way. Show the
builder what you believe the Victorian Civil and
problem to be Building Advice and Administrative
send a letter to the builder Conciliation Victoria Tribunal (VCAT)
confirming the details of your (BACV)
conversation and agreed actions Domestic Building List
1300 55 75 59
if necessary, engage an www.consumer.vic.gov.au (03) 9628 9999
independent building www.vcat.vic.gov.au
Because every building situation is
consultant to inspect the work
different, the type of service BACV The Domestic Building List of
so that you can get another
offers will depend on your needs, VCAT (an independent appeal
opinion and be sure you have a
the date of your contract and body) will generally require
reasonable case
whether your builders warranty mediation to resolve issues relating
keep a diary of conversations insurance was issued before or after to major domestic building
you have had with the builder 1 July 2002. contracts before hearing a dispute.
and take photographs
Services include free advice and
if you cannot get a satisfactory voluntary conciliation between you Civil Claims List
response by discussing the and your builder. (03) 9628 9830 or 1800 133 055
problem, place your complaint www.vcat.vic.gov.au
Technical inspections may also
in writing and state clearly what
be available to check work when VCAT also hears domestic building
you want done to rectify the
there is evidence of possible defects. claims under $10,000 through their
problem and when you require
Inspections may be sought by Civil Claims list.
the response. Send this to the
Consumer Affairs Victoria during
builder by registered mail. Keep
the conciliation process and carried
copies of all documents.
out by a Building Commission
inspector.

40 ➔ Building and Renovating


Completion

Check everything Keep all your Get adequate home


before you pay certificates insurance
The works are complete when: The law gives you the right to Whether you have built a new
copies of all documents related home or renovated an existing one,
your building surveyor has
to the building project. On it is wise to know exactly what your
issued the Certificate of Final
completion, make sure the builder home is worth. Make sure your
Inspection and/or Occupancy
or building surveyor gives you: building and contents insurance
Permit, and
covers the true cost of replacement.
a Certificate of Final Inspection
your builder has completed
(for extension/renovations), or
all works according to your
contract plans, specifications a Occupancy Permit (for new
and implied warranties. homes).
Do not make your final payment Keep these certificates along with
until you have thoroughly checked other receipts and documents
that all contract requirements have relating to the project.
been met.
For peace of mind, you can pay an
independent building consultant
to check for defects or unfinished
work.
Make a list of any work that you
believe is faulty or incomplete.
Speak with your builder
immediately about your concerns.
Place your request and any
agreements made with the builder
to finish work in writing and send
it by registered post. If there are
areas of work that are in dispute,
contact Building Advice and
Conciliation Victoria (BACV) at
Consumer Affairs Victoria for help.

Completion ➔ 41
Fences

The Fences Act 1968 The Property Law Settling disputes


(Victoria) Act 1958 The Dispute Settlement Centre of
The Fences Act 1968 (Victoria) This can affect the position of a Victoria offers a dispute resolution
regulates the building of fences in fence when there are discrepancies advisory and mediation service
Victoria. between the survey and title that can help you to settle disputes
description, or if you or your about a range of matters, including
For more details, you can: fences. Call 1800 65 85 28 or visit
neighbour have rights of possession
purchase a copy of the Law after occupying part of the other www.justice.vic.gov.au/disputeinfo.
Handbook from Fitzroy Legal person’s land continuously for If you cannot agree, provide your
Service on (03) 9417 3744 or at more than 15 years. neighbour with a written notice
www.fitzroy-legal.org.au. that sets out where you want the
refer to Victorian Consolidated Avoiding disputes fence, how you want it built and
Acts at www.austii.edu.au. the type you want. Refer to the
When you think about all the Fences Act 1968 for the appropriate
refer to the Victorian Law decisions that need to be made notice. It is preferable, but not
Reform Committee’s quick when building fences, it’s easy necessary, to attach a quotation.
guide on the Fences Act to see why they cause so many
1968, which can be found at disputes between neighbours. You After one month, if you have not
www.parliament.vic.gov.au/ need to determine the location, heard from your neighbour, or you
lawreform/fences/quickguide. type and height; who pays; have not reached agreement, you
who does the work and who can apply to the Magistrates’ Court
to resolve the issue.
Local planning maintains it.
The Court can consider the type
scheme To avoid disputes, it is always best
to talk with your neighbours about of fence that is usually built in the
Check with your local council these issues from the outset. area, materials commonly used and
to find out whether you need a the usual height and colours. With
planning permit. Usually neighbours pay for a fence regard to cost, a common solution
in equal amounts. If one neighbour is for the Court to direct the
wants a bigger, more expensive
The Building Act fence, then it is up to the parties to
neighbour who did not want the
more expensive fence to pay half
and Building reach an agreement as to how they the cost of a normal fence and the
Regulations 2006 will split the costs. person who wanted the expensive
alternative to pay the difference.
Check with your local council or
the Building Commission to find
out whether you need a building
permit.

42 ➔ Building and Renovating


Talk with your
neighbours about
fencing issues
from the outset
Keeping your home safe

Many accidents occur in the home


due to the purchase of unsafe
Smoke alarms Termite
products or the unsafe use of The current law states that you management
products. Always check the safety must install a smoke alarm on or All new homes built within
of the appliances you buy and near the ceiling of every storey termite-infested areas require a
always follow instructions for safe of your home in locations that termite management system. But
use of ladders, tools, furniture and will alert sleeping occupants of termites are known to also infest
appliances. smoke or fire. Regularly check that areas that are not designated
smoke alarms are working. You termite areas. As a result, to avoid
Curtain and blind should replace batteries once a year
or earlier if the alarm makes an
major damage by termites to your
cords intermittent beeping noise.
new or renovated home, it is
wise to consult a qualified expert
Children can be strangled or to inspect your premises, advise
choked by unnecessary loops in Swimming pools on, and install an appropriate
curtain and blind cords. When
ordering new curtains and blinds,
and spas long-term management system
that may involve chemical and
ensure that they have child-safety Any spa or pool capable of physical barriers.
features. You can also avoid hazards containing more than 300 mm
must have child resistant safety Brochures on home safety and
by moving cots, beds and furniture
barriers that are in very good maintenance are available from
away from cords and by wrapping
working order. Remove all other Consumer Affairs Victoria and the
cords around a cleat 1600 mm or
possible access for climbing across Building Commission. The Building
more from the floor.
these barriers. Refer to the Building Commission, Metropolitan Fire
A tie-down tension device secured Brigade and Country Fire Authority
Commission for details and
to the wall near the floor so that have information on smoke alarms
penalties.
the chord is pulled tight is also a and fire safety.
useful measure. Where possible, cut
the cord in half to get rid of the Basketball rings
loop then attach a tassel to the end Basketball rings and backboards
and tie a knot. must be installed and maintained
according to simple guidelines (refer
to the Building Commission for
details). You must regularly check
the safety of basketball backboards,
posts and rings, especially those
exposed to weather. Do not swing
on rings or posts. Dismantle existing
rings that are only mounted on a
single skin of brickwork, for instance
above a garage door, as these can be
dangerous.

44 ➔ Building and Renovating


Always check the safety
of the appliances you
buy and always follow
instructions for safe use
Building definitions

Understanding the language of Building consultant – Building inspector – A


domestic building can help you to An expert experienced in person registered with the
avoid problems. designing and/or constructing Building Practitioners Board
buildings. Building as a building inspector. This
Architect – A qualified consultants who conduct person may operate as a
person who is registered with pre-purchase inspections or private or council building
the Architects Registration give a report on a property inspector and is qualified to
Board of Victoria (ARBV) should have professional inspect buildings to ensure
to provide building design indemnity insurance to compliance with the Building
and contract administration cover serious defects that the Act 1993 and the current
services. report may overlook. Building building regulations.
consultants are architects,
Builders warranty commercial builders, domestic Building permit – Written
insurance – Building builders, draftspeople, approval from a registered
insurance taken out by the inspectors, building surveyors building surveyor that
domestic builder for works or engineers. They may be shows your plans fit in with
over $12,000 (except for required to be registered, building regulations. This
tradespeople who do not depending on the scope permit is required before
require registration where and price of work to be you can commence works.
works cover only one trade). undertaken in managing your Public building surveyors
Builders warranty insurance project or making checks may be contacted at your
only covers you if your builder before stage payments. local council, or private ones
has died, is insolvent or has through telephone directories
disappeared. In these cases it Building contract – A legal or through professional
covers structural defects for six document under the Domestic associations listed in this
years and non-structural defects Building Contracts Act 1995 guide.
for two years. The builder that forms an agreement
must be eligible for warranty between the builder and Building practitioners –
insurance to be registered. Your consumer about home Building practitioners include
builder should provide you building or renovating. A building surveyors, building
with a Certificate of Currency contract written in English inspectors, draftspeople,
for an insurance policy that that usually includes plans engineers engaged in the
applies to work on your home. and specifications is required building industry, commercial
for most domestic building and domestic builders,
Building Act 1993 – This work over $5000 and should demolishers, people who erect
Act is administered by the be signed by both parties. temporary structures and
Building Commission and quantity surveyors. Architects
provides for the regulation may be referred to as building
of building and construction practitioners if they are
standards. registered with the ARBV and
carry appropriate insurance.

46 ➔ Building and Renovating


Building Practitioners Certificate of Final Defects – Work that is faulty
Board – The Building Inspection – Certificate issued or contrary to the contents of
Practitioners Board (BPB) is an by the building surveyor after the signed contract.
independent statutory body final inspection of a renovation
established under the Building shows building work approved Defects liability clause
Act 1993. It is responsible for by the permit is completed. – A clause in a domestic
registering Victorian builders This is essential for future sale building contract that gives
and building professionals, of the home. There may still be the builder three, six or nine
and supervising and associated works in the contract, months to fix defects arising
monitoring their conduct such as paving and landscaping out of contracted works. It is
and ability to practice. that are incomplete. You are recommended that the defect
Architects, plumbers and not required to make your final liability period not be used
electricians are not registered payment until all work under to fix defects that are known
by the BPB. the plans and specifications is at the time of completion
complete, despite receiving the – these defects should be
Building regulations – Certificate of Final Inspection. fixed so that completion has
Building regulations are made been reached before the final
under the Building Act 1993 Completion – When the payment is made.
and are administered by the works to be carried out
Building Commission. under the contract have been Domestic Building
completed in accordance with Contracts Act 1995 – This
Building lawyer – A person the plans and specifications Act sets out minimum terms
with qualifications in law who and the building owner and conditions for major
specialises in matters related has received a Occupancy domestic building contracts
to building. Permit or Certificate of Final (those over $5000) and
Inspection. implied statutory warranties
Building surveyor – for all contracts (over and
A person registered with the Completion date – The under $5000) which you
BPB as a building surveyor. date when building works are and your builder sign. It
Qualified to issue a building completed, according to the also provides frameworks for
permit, inspect for compliance contract. paying deposits and stage
with the Building Act 1993 payments and resolving
and building regulations and Conveyancer – A person who domestic building disputes.
issue Occupancy Permits can assist a building owner This Act is administered by
or Certificates of Final to transfer legal interest in a Consumer Affairs Victoria.
Inspection, which mainly property to a purchaser. May
relate to health, safety and not have qualifications in law Draftsperson/designer –
amenity requirements. and is not to be confused with A person registered with the
Building surveyors do not a building lawyer. BPB to provide drafting and
supervise work or compliance associated services.
with the contract. Cooling-off period – A period
of five business days after both Engineer – A person
parties have signed a domestic registered with the BPB as
building contract when consumers an engineer who is qualified
can change their minds. This must to undertake the design,
be done in writing and sent to the documentation, supervision,
builder preferably by registered inspection and certification of
mail. If you consult a building buildings.
lawyer, this cooling-off period does
not apply.

Building definitions ➔ 47
Fair Trading Act 1999 – Occupancy Permit – Permit Prime cost item – A fitting
An Act administered by issued by the building that is part of the contract
Consumer Affairs Victoria surveyor after final inspection but the actual item has either
that protects consumers of a new home showing not been selected or the price
against illegal behaviour by that the dwelling is safe and is not known at the time
traders, such as goods or suitable for occupation. This the contract is entered into.
services not fit for purpose, is essential for future sale of The builder needs to make a
or misrepresentation of goods the home. An Occupancy reasonable allowance for the
and services. Permit does not necessarily supply and delivery of these
mean that all building work items in the price included in
Fittings – Items, for example, is complete. There may still the contract.
garden ornaments, lighting or be associated works in the
air conditioners that can be contract, such as paving Professional indemnity
removed without damaging and landscaping that are insurance – Insurance
the property (see Prime cost incomplete. You are not carried by a member of a
item). required to make your final profession or industry body
payment until all work is such as a prescribed building
Fixtures – Items such as complete, despite being given practitioner or building
basins, toilets, baths, built- an Occupancy Permit. lawyer designed to protect the
in wardrobes and kitchen consumer from loss owing
stoves that are attached to Owner builder – Someone to acts or omissions by the
the property and cannot be who carries out building professional acting on his or
removed without causing on his/her own property. her behalf.
damage. Owner builders are not in
the business of building. An Progress payments – These
Foundation data – This is owner builder must obtain can also be called stage
a report on the results of soil a Certificate of Consent from payments and are required
tests done on your building the BPB in order to obtain on completion of each stage
site before the building a building permit to carry of building, according to the
commences. This information out domestic building work Domestic Building Contracts
recommends the depths of valued over $12,000. Act 1995 or, if an alternative is
the stumps or type of slab used, by the description in the
or strip footing needed. The Plans – Drawings of contract.
contents of the report may the design of a home or
affect your design and the renovation completed by Provisional sum –
cost of construction. a designer/draftsperson, A reasonable estimate of the
architect or builder. These cost of carrying out work,
Liquidated damages – should be signed by the including the cost of supplying
Penalties paid by the builder, builder and consumer and be materials under a contract
such as rent, travel and out of part of the domestic building (including the nature and
pocket expenses, incurred by contract. location of the building site)
the owner if the home is not for which the builder, after
completed within the time Planning permit – Permits making reasonable enquiries,
stated in the contract. obtained from local councils cannot give a definite price at
that relate to the zoning and the time when the contract is
use and development of land, entered into.
for example residential or
commercial. This is not always
required but, if so, must be
obtained before you can be
given a building permit.

48 ➔ Building and Renovating


Registered builder – Stages of Building Variations – Changes agreed
A builder who is registered to by the owner and builder
Base stage:
with the BPB to complete that are made to the building
limited or unlimited work. (a) Home with a timber floor plans and specifications
Membership of the HIA or – when the concrete footings within the contract after the
MBAV is not the same as for the floor are poured and the contract has been signed (see
registration. base brickwork is built to floor Controlling the building contract
level. price in the Finance section on
Scope of works – Plans and (b) Home with a timber floor with page 10 for full details).
specifications showing what no base brickwork – when the
and how an owner wants stumps, piers or columns are Victorian Civil and
to build. This should be completed. Administrative Tribunal
included when getting quotes (VCAT) – An independent
and be part of the contract. (c) Home with a suspended
appeal body that may require
These should be sufficient for concrete slab floor – when the
mediation and tribunal
obtaining a building permit. concrete footings are poured.
hearings to resolve disputes
(d) Home with a concrete floor between consumers and
Soil tests – These can also be – when the floor is completed. building practitioners/
called a geotechnical report tradespeople.
and are tests carried out on (e) Home for which the exterior
the building site to find out walls and roof are constructed
Volume builders –
the type of soil and the depth before the floor is constructed
Companies that build large
necessary for solid, stable – when the concrete footings are
numbers of houses based on
footings. The type of soil and poured.
display home models.
foundation depth needed will
affect the design and cost of Frame stage: when a home’s
Zones – Permissible uses
building your home (see also frame is completed and
of land and requirements
Foundation data). approved by a building
for planning permits are set
surveyor.
out in zones of the relevant
Specialist building planning scheme. Contact
lawyer – A qualified lawyer Lock-up stage: when a home’s
your local council for
who has experience in matters external wall cladding and
information about zones in
to do with building. roof covering is fixed, the
your area.
flooring is laid and external
Specifications – Detailed doors and external windows
lists of specific building are fixed (even if those
materials (usually described doors or windows are only
as an Australian Standard), temporary).
appliances and fittings to
be used in a building or Fixing stage: when all internal
renovation. cladding, architraves, skirting,
doors, built-in shelves, baths,
basins, troughs, sinks, cabinets
and cupboards of a home are
fitted and fixed in position.

50 ➔ Building and Renovating


Useful contacts

Organisation Contact
Pre-building

Archicentre – design, inspections and advice 1300 13 45 13 www.archicentre.com.au

Architects Registration Board of Victoria (03) 9417 4444 www.arbv.vic.gov.au

Australian Owner Builders Pty Ltd (03) 9773 6333 www.ownerbuild.com.au

(03) 9285 6400


Building Commission
www.buildingcommission.com.au
(03) 9419 7488
Building Display Centre – seminars, planning
www.buildingdisplaycentre.com.au
and product information
info@buildingdisplaycentre.com.au

Building idea centres See Yellow Pages

Consumer Affairs Victoria – Credit, home loans 1300 55 81 81 www.consumer.vic.gov.au

Department of Infrastructure (DOI) (03) 9655 6666 www.doi.vic.gov.au

Display home centres See Yellow Pages

Energy Safe Victoria – electricians (03) 9203 9700 www.esv.vic.gov.au

Home Finance – (for people with disabilities) 1800 13 33 24

Land Victoria
Department of Sustainability and Environment (03) 8636 2010 www.land.vic.gov.au
(DSE)

Plumbing Industry Commission (PIC) – plumbers 1800 01 51 29 www.pic.vic.gov.au

1800 80 60 60
Reed Construction Data
www.reedconstructiondata.com.au
13 2161
State Revenue Office – stamp duty on purchasing
www.sro.vic.gov.au
new homes and land
sro@sro.vic.gov.au

VicUrban – affordable land 131 852 www.vicurban.com

52 ➔ Building and Renovating


Building for the environment

(03) 9345 1111 or 1800 332 510 (free call)


Australian Conservation Foundation
www.acfonline.org.au
Alternative Technology Association (03) 9639 1500 www.ata.org.au
Building Commission and Sustainability Victoria www.5starhouse.vic.gov.au
– 5 Star Standard building regulations www.buildingcommission.com.au
EPA Victoria (03) 9695 2722 www.epa.vic.gov.au
136 186
Our Water Our Future www.ourwater.vic.gov.au
ourwater@dse.vic.gov.au
Plumbing Industry Commission (PIC) 1800 01 51 29 www.pic.vic.gov.au
Sustainability Victoria 1300 363 744 www.sustainability.vic.gov.au
Commonwealth, State, and Territory government
agencies’ online guide to choosing energy www.energyrating.gov.au
efficient appliances

Professional associations

Australian Institute of Building Surveyors (AIBS) (03) 9415 7600 www.aibs.com.au


Australian Institute of Quantity Surveyors (02) 6282 2222 www.aiqs.com.au
Building Designers Association of Victoria (BDAV) (03) 9416 0227 www.bdav.org.au
Cabinet Makers Association 1300 767 738 www.cmavic.com.au
Engineers Australia (03) 9329 8188 www.engineersaustralia.org.au
Housing Industry Association (HIA) (03) 9280 8200 www.buildingonline.com.au
Law Institute of Victoria (03) 9607 9311 www.liv.asn.au
Master Builders Association of Victoria (MBAV) (03) 9411 4555 www.mbav.com.au
Municipal Association of Victoria (MAV) (03) 9667 5555 www.mav.asn.au
Real Estate Institute of Victoria Ltd (REIV) (03) 9205 6666 www.reiv.com.au
Royal Australian Institute of Architects (RAIA) (03) 8620 3866 www.architecture.com.au

Victorian Municipal Building Surveyors Group (03) 9580 4153 www.vmbsg.com.au

Choosing a builder

Australian Competition and Consumer 1300 30 25 02


Commission (ACCC) www.accc.gov.au

Australian Securities and Investment (03) 5177 3988


Commission (ASIC) www.asic.gov.au

Building Practitioners Board (BPB) – builders’ 1300 36 03 20


registration and enquiries www.buildingcommission.com.au
Consumer Affairs Victoria – enforceable
www.consumer.vic.gov.au
undertakings, prosecutions
VCAT Domestic Building List www.vcat.vic.gov.au

Useful contacts ➔ 53
Independent experts

Building lawyers See Law Institute Legal Referral Service

See Yellow Pages under Building consultants


Building consultants and inspection services and Building inspections services and professional
associations

Law Institute Legal Referral Service (03) 9607 9550 referrals@liv.asn.au

Help with disputes

Building Advice and Conciliation Victoria (BACV) 1300 55 75 59 www.consumer.vic.gov.au

(03) 9285 6400


Building Appeals Board
www.buildingcommission.com.au

(03) 9607 9550


Law Institute Legal Referral Service
referrals@liv.asn.au

(03) 9603 8370


Dispute Settlement Centre of Victoria, Department
1800 65 85 28
of Justice –fence disputes
www.justice.vic.gov.au/disputeinfo

Energy Safe Victoria – electricians (03) 9203 9700 www.esv.vic.gov.au

(03) 9660 6111


Housing Guarantee Fund
www.hgcf.vmia.vic.gov.au
Victorian Managed Insurance Authority
info@hgcf.vmia.vic.gov.au

Plumbing Industry Commission (PIC) - plumbers 1800 01 51 29 www.pic.vic.gov.au

VCAT Domestic Building List (03) 9628 9999 www.vcat.vic.gov.au

(03) 9628 9830 or 1800 133 055 (within Victoria)


VCAT Civil Complaints List
www.vcat.vic.gov.au

Home safety

(03) 9285 6400


Building Commission
www.buildingcommission.com.au

Consumer Affairs Victoria – Product safety 1300 55 81 81 www.consumer.vic.gov.au

www.health.vic.gov.au
Department of Human Services
1300 761 874
Asbestos in the home
www.health.vic.gov.au/environment/safety/
Safe Smart Homes and other information about
index.htm
injury prevention in the home
www.health.vic.gov.au/injury

Country Fire Authority (CFA) (03) 9262 8444 www.cfa.vic.gov.au

Metropolitan Fire Brigade (MFB) (03) 9662 2311 www.mfbb.vic.gov.au

54 ➔ Building and Renovating


Notes
Notes
Additional copies
This guide is available from Consumer Affairs Victoria. You can
attain additional copies by calling 1300 55 81 81 (local call) or
visiting www.consumer.vic.gov.au.

To order more than five copies at a time, fax a request to


(03) 8684 6333 or write to:
Consumer Affairs Victoria
GPO Box 123
Melbourne Victoria 3001

Disclaimer
Because this publication avoids the use of legal language,
information about the law may have been summarised or
expressed in general statements. This information should not
be relied upon as a substitute for professional legal advice or
reference to the actual legislation.

© Copyright State of Victoria 2007

This publication is copyright. No part may be reproduced by


any process except in accordance with the provisions of the
Copyright Act 1968. For advice on how to reproduce any material
from this publication, contact Consumer Affairs Victoria.

ISBN  1 921079 12 6

Authorised by Hon Tony Robinson MP


1 Macarthur Place Melbourne 3000

Published by Consumer Affairs Victoria


121 Exhibition Street Melbourne 3000

Printed by Vega Press 274 Ferntree Gully Road Notting Hill 3168

Printed on recycled paper.

CA BUILDING GUIDE_CVR.indd 2 15/10/07 12:41:07 PM


IFC
Contact Consumer Affairs Victoria
Victorian Consumer & Business Centre
113 Exhibition Street Building & Renovating
Melbourne 3000
Telephone: 1300 55 81 81 (local call) A Guide for Consumers
Email consumer@justice.vic.gov.au
Website www.consumer.vic.gov.au

Regional offices are located in Ballarat,


Bendigo, Geelong, Morwell, Mildura,
Wangaratta and Warrnambool.

Revised and updated


September 2007

September 2007
BR-12-01-1023

TIS 131 450


Textphone (TTY) or modem users only, ring
the NRS on 133 677, then quote 1300 55 81 81.
Callers who use Speech to Speech Relay dial
1300 555 727, then quote 1300 55 81 81.

CA BUILDING GUIDE_CVR.indd 1 15/10/07 12:41:07 PM