September 2007
BR-12-01-1023
Disclaimer
Because this publication avoids the use of legal language,
information about the law may have been summarised or
expressed in general statements. This information should not
be relied upon as a substitute for professional legal advice or
reference to the actual legislation.
ISBN 1 921079 12 6
Printed by Vega Press 274 Ferntree Gully Road Notting Hill 3168
Foreword ➔ 1
Contents
Introduction 3
Avoiding common pitfalls 4
Finance 6
Building for our environment 12
Choosing your block 15
Choosing a display home 16
Extending and renovating 18
Becoming an owner builder 22
Buying off-the-plan 24
Your plans 26
Choosing your builder 29
Your contract 32
Your building surveyor 36
Construction 38
Managing a dispute 40
Completion 41
Fences 42
Keeping your home safe 44
Building definitions 46
Useful contacts 52
Building and renovating your If you are extending your home Most homeowners are keen to
home can be an exciting, expensive you can: get started with their project so
and complex experience. Before they can enjoy the benefits of
use a larger extension company
you even start to build, there is a their new, extended or renovated
that manages your plans,
lot of information to collect and home. Doing the research to make
council and building permits
important decisions to make. confident and informed choices
and construction
can be time consuming and
If you’re considering building a
use an architect or designer and sometimes seem overwhelming.
new home you can choose to:
a smaller building company
But this could be one of the largest
buy a house and land package
use a small design and build transactions you’ll ever make, so it
build a house based on a display company pays to take your time. Knowing in
home on your own land advance exactly what you want and
become an owner builder.
what you can afford, and placing
build a home through a sales
If renovating, you may need to: the details and price clearly in your
agent
engage a range of tradespeople, contract are the foundations for
use an architect or designer and all satisfying home building and
or
a smaller building company renovating experiences. It also pays
engage a builder to supervise the to seek independent expert help.
use a small design and build
entire project and coordinate
company If you’ve never experienced a home
subcontractors for you.
become an owner builder building project before or if it’s
The level of your involvement in been a while since your last project,
buy a home being constructed the project will vary according to this guide will help you to make
off-the-plan. the option you choose. Volume confident decisions before you sign
builders, large extension companies a contract.
and architects or designers may
design and draw up the plans In addition to reading this guide,
and get permits on your behalf. we encourage you to research,
Architects may also help you shop around, negotiate and take
find the right builder at the your time in making decisions.
right price and provide contract If you have any questions, please
administration during construction. call Consumer Affairs Victoria
But regardless of the size or style on 1300 55 75 59. For the most
of your building project, it pays up to date information visit
to know what you are signing up www.consumer.vic.gov.au.
for when applying for permits and
signing contracts and to get advice
from a building lawyer.
Introduction ➔ 3
Avoiding common pitfalls
an average of
delivers everything listed in your
contract
ensures everything is in working
order.
The building
surveyor’s role 2000 people with
building disputes
Many homeowners believe their
building surveyor controls the
quality of the entire project and
will safeguard them against poor
workmanship or works that do
not match the description in their
contract.
This is not the case. The building
surveyor’s role is to issue your
Using independent Independent building consultants
are qualified architects, engineers,
building permit, inspect works to expert help building practitioners or building
ensure they comply with building Before you sign your building surveyors who make inspections
regulations, which primarily contract, it is wise to use an or manage works on your behalf.
relate to health, safety, amenity independent building lawyer to They should carry professional
and sustainability, and issue your ensure that the contract contains indemnity insurance. To find an
occupancy certificate. everything required by the law independent building consultant,
and fairly balances your rights contact a relevant professional
It is your builder’s responsibility
and obligations with those of the organisation or look in the Yellow
to deliver everything included
builder. Pages under building consultants
in your contract. And it is your
and building inspection services.
responsibility to ensure that While your builder is obliged to
everything you want is clearly deliver everything that is included Depending on the scope and price
listed in your contract. If you have in your contract, you can monitor of contract you have with your
any concerns, it is also your role to the progress by communicating independent building consultant,
discuss the issues with your builder regularly and by using an the consultant may need to be
so they can be resolved. Unless you independent building consultant registered to carry out the work.
have technical expertise in the area, to supervise the entire project, or to For peace of mind, it is wise to
you should seek the advice of an make checks before you make stage include the cost of these services in
independent building consultant. payments. your budget.
to make their
insurance
are a lender as well as a
broker, as this may affect their
loan application
recommendations
offer a wide range of loans from
a variety of independent lenders
before starting
can justify their
recommendations.
When using brokers it is also
works
crucial that you:
do not pay an upfront fee
make sure they disclose all
fees and commissions prior to
signing you up
ask to see a copy of the
application and any financial
Getting a home loan Lenders details they send to the lender
Home loans are available from on your behalf.
Consumer Credit banks, credit unions, building It is important to note that before
Code societies and finance companies. the broker can begin negotiating
Some building companies offer on your behalf, they must give you
To ensure fair dealing and protect
financial advice or refer you to a a signed copy of the document of
the interests of consumers, all
lender. Some promote loans for appointment. The appointment
lenders must comply with the
100 per cent of the price of the document must state:
Consumer Credit Code that states
lenders must provide: home. Remember, anyone offering the amount of credit or
financial advice must be licensed. It the maximum credit to be
a statement outlining the is wise to get independent financial negotiated
borrower’s rights and obligations advice and compare loans from
independent lenders before signing any requirements as to the term
a pre-contractual statement
up with the lender suggested by of contract
about certain financial
information that must be your builder. the maximum annual
included in the contract percentage rate(s) the client is
a schedule of comparison rates. Mortgage brokers/ prepared to pay
Finance ➔ 9
Mortgage insurance Some lenders will help to arrange
Key tips for In some cases an institution may
the First Home Owner’s Grant
reducing your lend you 100 per cent of the
application for their borrowers.
Eligibility criteria and application
mortgage purchase price, requiring no deposit forms are available online from the
at all. If you are borrowing 80 per State Revenue Office of Victoria at
Shop around for the
cent or more of the purchase price, www.sro.vic.gov.au.
best possible interest
lenders generally require you to
rate, because that’s your
pay for mortgage insurance. This
single biggest cost. It’s the
is an additional upfront payment,
Controlling the
underlying rate that counts,
not the ‘honeymoon rates’.
usually in the form of a one-off building contract
premium paid at settlement. price
If you’re thinking of
Mortgage insurance protects the Once you have your loan approval,
refinancing, make sure
lender in case you default on the you need to ensure that your costs
you’ll be better off first.
loan and the sale of the property don’t blow out. To avoid borrowing
Don’t get ‘churned’.
does not cover the amount you extra money that will be difficult
If you want additional owe. It is important to note that to repay, it is important to know
features, look for a low if you default and the mortgage how to control the price of your
interest rate loan that has insurance is paid out, the insurance building contract before you start.
them. Paying an extra company will want you to repay
0.5 per cent interest for the debt. By law, your major domestic
a loan with features that building contract must have a price
Under the Consumer Credit Code, and state the legally permissible
may save you money, will
a lender can require you to take out percentage of total price that you
probably end up costing
mortgage insurance. should pay as deposit when works
you more than you’ll save.
commence, and as stage payments
Make extra regular payments Consumer credit after each stage is completed.
if you can. This will make
the most difference in the insurance Only items permitted by law, such
first few years of the loan, Consumer credit insurance can as prime cost and provisional sum
but can be a good idea at be used to guard against losing items, other identified costs, and
any time. your property by defaulting on variations can cause changes in the
loan repayments due to sickness, price. It is easier to stick to your
You may incur substantial costs original budget and avoid financial
for ending or switching from accident or unemployment.
Carefully consider the costs of this trouble by keeping these to a
certain loans that can include: minimum.
insurance to ensure the benefits
termination or break fees, are worth the outlay. Also, study
for exiting your current loan the terms and conditions for any Permissible deposit
early. For fixed rate loans, restrictions or limitations, such as a The law requires that the deposit
in particular, such fees may three-month limit on cover. you pay can be no more than:
be high. You will also have
to pay the lender’s legal fees Under the Consumer Credit Code, 10 per cent of a total contract
for discharging the mortgage it is against the law for a lender to price that is less than $20,000,
over your property require you to take out this type of or
insurance.
fees and costs associated 5 per cent of a total contract
with the new loan
(application fees, stamp
First Home Owner’s price that is $20,000 or more.
duty on your new mortgage, Grant Only sign your contract and pay
the deposit after you have sighted
valuation and legal fees). The First Home Owner’s Grant your builder’s warranty insurance
scheme provides eligible first Certificate of Currency.
home owners with a non-means
tested, one-off payment of
$12,000 that can be used for the
purchase of an existing home or
to build a new home.
Finance ➔ 11
Building for our environment
When choosing your land you’ll Are there any zoning or local Have you reviewed the natural
probably be influenced by your council planning changes and finished levels of the
budget, and whether you need to underway? block and the crossing and
be near work, public transport, stormwater information?
Is the block suitable for the
schools or other facilities. You
type of home you intend to Do any trees, buildings and
will need to seek expert help
build? associated structures such as
when addressing some items in
foundations and septic tanks
the checklist below. Are services such as gas,
need to be removed?
electricity, water, sewerage and
Checklist the telephone connected? Have you checked whether
the block is prone to termites?
Have you established the Is a legal stormwater discharge
Although your council will
correct location of your point available directly to the
determine whether your block
allotment? Your certificate of allotment?
is located in a designated
title shows your allotment Have you checked with termite area, termites are not
entitlement, however you relevant service providers always confined just to these
need to define your allotment about availability and costs of declared areas. Consequently,
boundaries on the building having services connected? regardless of the location
site to ensure your building, of your block, you should
Does the block and your
when constructed, is correctly carefully consider measures
subsequent plan provide for
positioned. This is determined to protect your new home
privacy, safe entry and exit,
by the position of the survey against termite infestations.
an energy efficient aspect and
pegs located on the allotment
room for all your needs? Is the block located in a flood-
that indicates your allotment
boundaries. A licensed prone, landslip or snowload
Where are the boundaries and
land surveyor can only area?
do you need fences?
position these survey pegs Is your land located in a
Can you get satisfactory
(commonly referred to as a designated bushfire prone
building access to the block?
re-establishment survey). area? If so, you may be
Is the block well drained in required to use special
Have you checked the
regard to potential surface or construction techniques
certificate of title for
sub-surface run-off? when building your home.
restrictions for building
envelopes, easements, Are there any large trees Design and maintenance
covenants and rights of located where you intend to measures to prevent
access? build, or at a distance from it destruction by bushfires can
that is less than 1.5 times the be taken. Contact the Country
Are there any special local Fire Authority (CFA) for
tree’s height?
council planning overlays detailed information on
that apply to the site that may Do you have a copy of the (03) 9262 8444 or visit the
impact on your house design? plan of subdivision for the website at www.cfa.vic.gov.au.
block from the local council?
If so, does it show any cut
and/or filling as extra costs
may be incurred for footings.
Choosing your block ➔ 15
Choosing a display home
Many people decide to build After choosing any variations, Volume builders usually
a house with a large building make sure you ask the sales own the copyright to display
company (volume builder) that person the exact cost of the home designs and plans. This
offers several designs based on home on display and the exact means that you cannot sign a
display homes. This option can cost of building the version that preliminary document and pay
be affordable and can seem you want. It is important to note a deposit for particular plans and
to save time, as the company that changing standard plans can then choose to have the home
already has plans drawn up and lead to significant increases to the built by a different builder.
will usually obtain all permits cost of construction.
If you do sign a preliminary
on your behalf. But there are
When you have chosen a builder, document and decide not to
still important decisions to make
it is wise to choose all your proceed with the building
regarding: which company to
fixtures and fittings before you construction, the builder may be
use, which display model you
sign the major domestic building entitled to keep some or all of the
want, and what changes you
contract. Itemise the details of deposit paid.
want to make to the display
your choices (such as make,
model so that it suits your needs Before entering any agreement,
model, colour or style) in your
and budget. regardless of what it is called, it
contract, and don’t leave any
is wise to seek advice from the
If you are choosing to build a blanks.
Building Advice and Conciliation
home that is an exact replica of
Some volume builders request Victoria service at Consumer
the one on display, the volume
you to sign one or two Affairs Victoria or a building
builder is required by law to
documents before the main lawyer.
include in your contract exactly
contract. These documents are
the same plans and specifications Rather that sign any of these
commonly called preliminary
as those used to build the display preliminary documents, it is
agreements. A preliminary
home. preferable to choose your builder
agreement document may also be
and include all works that you
However, the home on display called a quote, order, preliminary
have agreed the builder will carry
is sometimes the top model in a contract estimate, provisional
out for the construction of your
range. Most volume builders do quote to build on your land,
home in one major domestic
allow you to customise the model authorised tender acceptance or
building contract.
you choose. This means you can contract request.
vary the floor plan, fittings and
These preliminary documents
fixtures to some extent, to suit
may be used in the first instance
your lifestyle and budget.
to obtain a soil report but may
also include costs for drawing up
plans and specifications.
You will need to seek If borrowing money for You can usually count on the
independent expert help to the project, use the finance project costing more and taking
complete some of the checks section in this guide to choose longer than expected. Careful
below. an affordable loan and ensure planning before you start will
you control the price of your help you to manage the project
Checklist building contract. well and minimise disruptions to
your daily life.
Ensure the existing home is Check that your existing
structurally sound. house and content insurance Sometimes older homes don’t
is still valid during the period reveal their hidden faults
Find out if you need local of construction. until the outer layers begin to
council planning and be stripped away. Additional
demolition permits. Get a quantity surveyor to
costs can include restumping,
provide independent advice
Find out if you need a underpinning, rising damp
on the cost of the project.
building permit. repairs, termite eradication,
If using an architect, arrange rewiring and re-plumbing.
Obtain a copy of the for tender documents to be
Title of Land. Check for Be prepared for a change of
forwarded to appropriate
any covenants, building lifestyle; once walls start coming
builders.
envelopes, easements and down there’ll be dust everywhere.
overlays that may restrict Get a copy of Asbestos in the Hang plastic sheets and cover
your building before you get a Home from the Department furniture and appliances for
design and plans. of Human Services (DHS) protection. It is important to note
before your start any that contaminants that can cause
Assess the space that you demolition or do-it-yourself allergies may be used during the
want and can afford. Make a work (see page 14). renovation.
detailed list of your specific
requirements and desires. The Use the information in this You may need to arrange
more detailed and precise guide to successfully plan for temporary use of other
this list, the more satisfied and manage each stage of bathroom, toilet or kitchen
you will be with the finished your project. facilities. Some homeowners
renovation. move out for the duration of
Extending, altering and
the renovation. If you decide to
Decide whether you want to renovating a home can be a
do this, remember to factor the
duplicate the original style of stressful time, whether you
cost of rent into your budget and
the house or add a contrasting are contracting a builder or
liquidated damages (penalties
modern style. completing the work as an owner
stated in your contract that the
builder.
builder is required to pay you
if building goes beyond the
contracted completion date).
who knock on
speak with recent clients.
Ask to see the tradesperson’s
certificate of currency for
public liability insurance,
your door or
which will protect you or third
parties against any damage the
tradesperson may cause.
telephone you
Check the Choosing a builder
section of this guide (page 29)
for trades that are required to be
registered or licensed. If using these
Purchasing a building before it has If you have purchased an off-the- Other issues to consider when
been constructed is commonly plan home and find that there are buying off-the-plan are the selling
known as buying off-the-plan. The building defects, you are entitled price, possible changes to the plans
design of the building and sketches to approach the builder about after works have commenced and
of its final appearance may be these defects, as they are covered the quality of finish in the final
included in advertising material by the implied warranties in the product.
well before occupation is possible. Domestic Building Contracts Act 1995
that run with the land. In some
People are often attracted to off-
circumstances, you may also have
the-plan sales by the reduced
an entitlement to builders warranty
stamp duty they are required
insurance.
to pay. Be aware that you are
still required to pay stamp duty If you find defects in your off-
when buying off-the plan. The the-plan home, initially bring
amount payable depends on how these defects to the attention of
advanced the construction of the the developer, and seek to resolve
building is and its current value: the issue. If this fails to achieve
the closer the construction is to a solution, you may contact the
being completed, the higher the builder directly.
stamp duty.
Contact the State Revenue Office
to find out about stamp duty on
13 21 61 or at www.sro.vic.gov.au.
Volume builders usually supply It is important to note that Architects and designers retain
plans and specifications and obtain architects or designers cannot copyright on drawings, plans and
planning and building permits for prepare drawings or specifications documentation provided under
you. But if you are using a smaller for building construction works your contract. This means you can
building company to build your unless they: only use the plans once, and only
new home or extension, you may on the site they were designed for,
are registered with the ARBV
need to get a design and suitable unless agreed otherwise. It is wise
in the case of architects; or the
plans and specifications. to have your contract checked by a
BPB in the case of designers/
building lawyer before signing.
draftspeople, and
Using an architect or have professional indemnity
Under your contract, your architect
designer/draftsperson insurance, and
or designer/draftsperson may:
Registered builders For further information contact: erecting a chain wire fence to
enclose a tennis court
The Building Practitioners Board
Domestic builders in Victoria must
(BPB) 1300 36 03 20 www. erecting a mast, pole, antenna,
be registered for all contracts over
buildingcommission.com.au aerial or similar structure.
$5000, except for those tradepeople
who do not require registration. Architects Registration Board If any tradesperson uses a
The Building Practitioners Board of Victoria (ARVB) 9417 4444 combination of trades, such as
(BPB) is an independent statutory www.arbv.vic.gov.au painting and tiling, to complete
body administered by the Building work that exceeds $5000, then
Energy Safe Victoria
Commission. It is responsible they will need to be registered.
(03) 9203 9700
for registering Victorian builders
www.esv.vic.gov.au
and building professionals and
supervising and monitoring their Plumbing Industry Commission
Getting quotes
conduct and ability to practice. (03) 9889 2211 It is very important to shop around.
Some extension companies and
To be registered with the BPB,
building practitioners must Tradespeople who specialist companies (for example
kitchen and bathroom suppliers)
have the required qualifications, do not require do not provide you with detailed
knowledge, and expertise and carry
builders warranty insurance. registration information and a price unless you
sign a contract and pay a deposit
Other building practitioners It is advisable to have a written for plans and specifications.
include building surveyors, contract for these one-off contracts.
Tradespeople do not need These contracts sometimes give
building inspectors, quantity copyright ownership of your plans
surveyors, engineers engaged in registration to complete one-off
projects such as: to the builder. Signing this type
the building industry, draftspeople, of contract means you cannot
commercial and domestic builders, attaching external fixtures use the plans elsewhere, despite
demolishers, and persons who (including awnings, security paying for them.
erect temporary structures. screens, insect screens and
balustrades) Don’t lock yourself in with a
All plumbers, gasfitters and builder – either by signing over
drainers must be registered or electrical work copyright to the plans or entering
licensed with the Plumbing a major domestic contract – unless
glazing
Industry Commission and must you have made an informed
carry an identification card. installing floor coverings choice and everything you want
Electricians are licensed by the insulating is clearly stated in your contract.
Office of Electrical Safety. If you change your mind after any
painting cooling-off period you may lose
Architects may be referred to as
plastering your deposit and your plans.
building practitioners if they are
registered with the ARBV and carry plumbing work as defined in Whether you are building a new
appropriate insurance. section 221C of the Building home or renovating, it is important
Act 1993 to choose a registered builder you
can communicate with easily, have
tiling (wall and floor)
confidence in and feel you can
Your contact ➔ 33
Tips If your home is based on a
display model, do the plans
If you have to sign a separate
warning in relation to progress
Before signing your contract, and specifications include payment methods, have you
check that you can answer ‘yes’ to customised items and all received advice from a building
these questions. You may need the requested variations in design, lawyer on this?
assistance of a building lawyer and materials, finishes and costs
Do you understand the
building consultant to be sure. clearly described and illustrated
procedure for variations of plans
Have you obtained approved in your contract? (See Choosing
and specifications?
finance for the building works? a display home on page 16 for
further details.) Are the start and finish dates
Is the builder registered with the clearly stated?
BPB? Are provisional sum or prime
cost items clearly stated in Is the procedure for delays
Has the builder verified to you schedules? and extensions of time clearly
that tests to assess the site for stated?
suitability for the proposed Have you checked that there
is a Certificate of Currency for Are penalty payments for
works have been carried out?
the builder’s warranty insurance exceeding the time for
Have you or the builder/ that applies to work on your construction (liquidated
architect/designer/draftsperson property? damages) clearly stated and
on your behalf, obtained sufficient to cover your costs,
required building permits and/or Do you understand that you
eg. rent?
planning permits from a private should not pay a deposit until
you have seen the Certificate Is the clause containing the five
building surveyor and/or the
of Currency for the builders day cooling-off period included?
local council?
warranty insurance?
Do you understand the
Is the work shown and clearly
Is the deposit within the legal circumstances in which the
described in the contract, plans
limit? builder or owner can end the
or specifications and any other
– a maximum of 10 per cent if contract?
relevant documents such as
engineering computations or the price is less than $20,000, Have you had the contract
soil report? or for long enough to read it
– a maximum of 5 per cent if thoroughly and have it checked
Have you included all special
the price is $20,000 or more. by independent experts?
requirements and finishes in
your plans and specifications? Are the price and progress
payments in accordance with
the law and clearly stated?
Completion ➔ 41
Fences
Building definitions ➔ 47
Fair Trading Act 1999 – Occupancy Permit – Permit Prime cost item – A fitting
An Act administered by issued by the building that is part of the contract
Consumer Affairs Victoria surveyor after final inspection but the actual item has either
that protects consumers of a new home showing not been selected or the price
against illegal behaviour by that the dwelling is safe and is not known at the time
traders, such as goods or suitable for occupation. This the contract is entered into.
services not fit for purpose, is essential for future sale of The builder needs to make a
or misrepresentation of goods the home. An Occupancy reasonable allowance for the
and services. Permit does not necessarily supply and delivery of these
mean that all building work items in the price included in
Fittings – Items, for example, is complete. There may still the contract.
garden ornaments, lighting or be associated works in the
air conditioners that can be contract, such as paving Professional indemnity
removed without damaging and landscaping that are insurance – Insurance
the property (see Prime cost incomplete. You are not carried by a member of a
item). required to make your final profession or industry body
payment until all work is such as a prescribed building
Fixtures – Items such as complete, despite being given practitioner or building
basins, toilets, baths, built- an Occupancy Permit. lawyer designed to protect the
in wardrobes and kitchen consumer from loss owing
stoves that are attached to Owner builder – Someone to acts or omissions by the
the property and cannot be who carries out building professional acting on his or
removed without causing on his/her own property. her behalf.
damage. Owner builders are not in
the business of building. An Progress payments – These
Foundation data – This is owner builder must obtain can also be called stage
a report on the results of soil a Certificate of Consent from payments and are required
tests done on your building the BPB in order to obtain on completion of each stage
site before the building a building permit to carry of building, according to the
commences. This information out domestic building work Domestic Building Contracts
recommends the depths of valued over $12,000. Act 1995 or, if an alternative is
the stumps or type of slab used, by the description in the
or strip footing needed. The Plans – Drawings of contract.
contents of the report may the design of a home or
affect your design and the renovation completed by Provisional sum –
cost of construction. a designer/draftsperson, A reasonable estimate of the
architect or builder. These cost of carrying out work,
Liquidated damages – should be signed by the including the cost of supplying
Penalties paid by the builder, builder and consumer and be materials under a contract
such as rent, travel and out of part of the domestic building (including the nature and
pocket expenses, incurred by contract. location of the building site)
the owner if the home is not for which the builder, after
completed within the time Planning permit – Permits making reasonable enquiries,
stated in the contract. obtained from local councils cannot give a definite price at
that relate to the zoning and the time when the contract is
use and development of land, entered into.
for example residential or
commercial. This is not always
required but, if so, must be
obtained before you can be
given a building permit.
Organisation Contact
Pre-building
Land Victoria
Department of Sustainability and Environment (03) 8636 2010 www.land.vic.gov.au
(DSE)
1800 80 60 60
Reed Construction Data
www.reedconstructiondata.com.au
13 2161
State Revenue Office – stamp duty on purchasing
www.sro.vic.gov.au
new homes and land
sro@sro.vic.gov.au
Professional associations
Choosing a builder
Useful contacts ➔ 53
Independent experts
Home safety
www.health.vic.gov.au
Department of Human Services
1300 761 874
Asbestos in the home
www.health.vic.gov.au/environment/safety/
Safe Smart Homes and other information about
index.htm
injury prevention in the home
www.health.vic.gov.au/injury
Disclaimer
Because this publication avoids the use of legal language,
information about the law may have been summarised or
expressed in general statements. This information should not
be relied upon as a substitute for professional legal advice or
reference to the actual legislation.
ISBN 1 921079 12 6
Printed by Vega Press 274 Ferntree Gully Road Notting Hill 3168
September 2007
BR-12-01-1023