You are on page 1of 1

#

Task

Time estimate

1
1.1 1.2 1.3 1.4 1.5

Removal of existing Part


Strip and remove rail section Dismantle shaft (old) from coupling and strip plumber blocks Lift and remove shaft(old) Remove base structure of plumper blocks by cutting of bolts Lift and remove plumber block base structure

2
2.1 2.1 2.2 2.3

Modify structure for new conponents


Remove coupling on side no.1 (existing one) Make modification by cutting beam on structure No.2 Weld in structure for triangles no.2 Install triangle structure by bolting on base structure no.2

3
3.1 3.2 3.3 3.4 3.5 3.6 3.7

Inserting new conponents


Base of plumper block lower no.2 Lower shaft assembly on side no.1 Lower shaft assembly on side no.2 Alignment of two shafts Weld base of plumbing blocks Do final alignment Install boss with sprocket and keeper plate

4
4.1 4.2

Fasten all components and make connections


Fasten rail section on both sides Electrician connect power on motors

5
5.1

Check Operation
Run cart a few times to check operation