The document outlines a 5 step task involving the removal and replacement of existing parts on a shaft assembly. Step 1 involves dismantling and removing the old shaft components. Step 2 modifies the structure to accommodate new components. Step 3 inserts the new shaft assemblies and aligns them before welding. Step 4 fastens all components and connects power. Step 5 runs tests to check operation.
The document outlines a 5 step task involving the removal and replacement of existing parts on a shaft assembly. Step 1 involves dismantling and removing the old shaft components. Step 2 modifies the structure to accommodate new components. Step 3 inserts the new shaft assemblies and aligns them before welding. Step 4 fastens all components and connects power. Step 5 runs tests to check operation.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
The document outlines a 5 step task involving the removal and replacement of existing parts on a shaft assembly. Step 1 involves dismantling and removing the old shaft components. Step 2 modifies the structure to accommodate new components. Step 3 inserts the new shaft assemblies and aligns them before welding. Step 4 fastens all components and connects power. Step 5 runs tests to check operation.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
Strip and remove rail section Dismantle shaft (old) from coupling and strip plumber blocks Lift and remove shaft(old) Remove base structure of plumper blocks by cutting of bolts Lift and remove plumber block base structure
2 2.1 2.1 2.2 2.3
Modify structure for new conponents
Remove coupling on side no.1 (existing one) Make modification by cutting beam on structure No.2 Weld in structure for triangles no.2 Install triangle structure by bolting on base structure no.2
3 3.1 3.2 3.3 3.4 3.5 3.6 3.7
Inserting new conponents
Base of plumper block lower no.2 Lower shaft assembly on side no.1 Lower shaft assembly on side no.2 Alignment of two shafts Weld base of plumbing blocks Do final alignment Install boss with sprocket and keeper plate
4 4.1 4.2
Fasten all components and make connections
Fasten rail section on both sides Electrician connect power on motors
5 5.1
Check Operation Run cart a few times to check operation