Case Study of EOBI COMERCIAL BUILDING PROJECT Fine Dinning Building Consist of (Basement+Groundfloor+3floors)

CONTRACTOR: SKYWAYS CONSTRUCTION PVT LTD


CONSULTANTS: ZEERUK INTERNATIONAL PVT LTD

Project planning
For the Commercial Building Projects, Project Planning is very important. Project is broken down into the number of activities, according to work break down structure. During the projects Several activities are running parallel to each other , in which critical activities were given more importance for the successful completion of a project.

Various Steps of EOBI Comercial Building Project I/8 Islamabad


Erection of Columns Beams construction Slab construction Removing of Shuttering after concrete curing Erection of Shear walls Concreting of Cantilever beam and slab. Construction Practices

Construction of Columns

Beams construction

Slab construction Reinforcement pattern

Slab Reinforcement Detail..

Beam-Beam Beam- Slab Beam Column Joints

Joint Details

Erection of Shear walls

Construction of Cantilever beam and slab.

Concreting of cantilever slab

Beam rest on Beam(Torsional Effect) Beam rest on Column

Constructional practices

Reference Mark for vertical level

1 inch bent allowed when main reinforcement bars of column enters the upper Floor