Imran Ahmed

Address:
L-834 Sector 5M
North Karachi.
Cell no: 0332 3442355
Email: imranmehfooz@hotmail.com.

OBJECTIVE .

Work in a challenging and hardworking environment where our work introduces improvement in
people life, my professional expertise and abilities would be enhanced and I might prove myself.

EMPLOYMENT TRACK.

From April 2014 Worked as Senior Design Engineer in Gulf Consult (Architects, Engineers, Planners)
to Feb 2021

From April 2010 Worked as Telecom Towers Designer and Coordinator in Exponent Engineers (Planners and
to April 2014 Consulting Engineers), deputed with CTI Engineering International Co. Ltd.

From July 2009 Worked as Client / Project Engineer in Procter & Gamble, Port Qasim Plant, Karachi.
to April 2010

From June2004 Worked as Design Engineer in A.A. Associates (Planners and Consulting Engineers)
to Dec 2008

PROFESSIONAL EXPERIENCE .

An extensive experience of 17 years works with major split as below:


• 11 years of structural designing of bridges, multi-story buildings, industrial plants and
infrastructures in Pakistan.
• 5 years Managing site survey activities for getting as-built details of buildings for Telecom
tower installation.
• 1 year as project engineer on site responsible for all issues related to quality and execution of the
project.
KEY SKILLS .

• Managing site survey activities for getting as-built details of buildings for Telecom tower
installation.
• Checking the stability of buildings.
• Designing of Foundations for different Telecom operators.
• Preparing detailed engineering drawings along with Bill of Quantities and feasibility reports.
• Conducting surveys for the as-built and rehabilitation works of buildings and telecom towers.
• Technical proficiency in Detailed Design of Industrial and Residential buildings, Engineering
Design Reviews, Vetting of Structures.
• Thorough understanding of Basic Structural Engineering Concepts.
• Proficiency in Analysis and Design software used in the industry i.e. ETABS, SAFE and SAP
• Multidiscipline engineering knowledge, understanding of engineering codes and standards
including ACI-318, ASCE, UBC, IBC, AISC etc.
• Leading engineering team throughout the entire phases of engineering project.
• Providing guidelines / support to Design & Detail Engineering team
• Handling technical queries related to Design & Detailing
• Management of small & medium scale projects in coordination with Project management team
• A quick learning ability and desire to learn new concepts
• Proficiency in coordination and communication with the clients
MAJOR PROJECTS .

Telecom /Towers

Zong Phase V (HUAWEI) 600 Sites


The project consisted of 600 sites to be done in whole year 2013. We had in our scope the site
survey, feasibility analysis, soil investigation (Green Fields), tower design, framing plan, site
stability and detailed engineering design.

Zong Phase IV (HUAWEI) 400 Sites


Same activities as phase V.

Telanor SWAP Project (EES & BTI) 700 Sites


The project consisted of 700 sites old sites to be done in years 2012 & 2013 in which a replacement
of Battery Bank was to be done. We had in our scope the site survey, feasibility analysis, framing
plan / pad extension / strength analysis and detailed engineering design.

Buildings
• Procter and Gamble Pvt Ltd
It is a complete manufacturing plant of Procter and Gamble Pvt Ltd. Its main unit is a G+7 (43m
height) Steel framed (special concentrically braced frame) building, situated at Port Qasim,
Karachi. All beams and columns are made with steel while slab (which carries up to 30 KN/m2) is
RCC. Structure contains an RCC raft footing. It is designed in accordance with LRFD & UBC-97.
• Fauji Oil Terminal And Distribution Company (FOTCO Jetty)
FOTCO Jetty (Port Qasim) whose 20 x 46 m steel platform was to be strengthened for three new
MLA’s of 56 Tons each. The platform was supported on concrete filled steel piles, this whole
arrangement was strengthened for new MLA loads without disturbing substructure as it was in
water. Additional steel girders were provided in the deck to support the new loads and substructure
was strengthened by providing additional bracings to piles above water level.

• Gulf Consult Head Office


It is a G+20 building for office use. The building has large area on ground floor and twenty story
tower having large spans and strict instructions for element sizes.

• El mundo / Showbiz Project Kuwait


The complex architecture had shopping mall, cinema, play land etc. it was mostly RCC with
shallow beams plus some steel roofs.

• Kuwait Community College Jahra (KCCJ)


A 52000 m² square area educational project, consisting of many blocks. It was mostly RCC
construction with little steel frames.

• Al-Huda Complex Islamabad


It is G+4 RCC structure situated in Islamabad (Seismic Zone-3). It is designed and detailed as
Special Moment Resisting Frame. It had a restriction on beam depth to be 450 mm. It has a raft
foundation.

• Headquarters Building For The Central Agency For Public Tenders (Vetting)
It was a G+47 office building. The structure had small plan area and 200m height which made it
critical for height and lateral analysis. The design included high-rise checks of drift, comfort level
and structural irregularities.

• Maymar Sector U Flats (Vetting)


This project consisted of 5 Blocks of flats, each having G+14 stories. This was an RCC framed
structure having intermediate seismic zone, distribution of horizontal loads was as per Dual System
(Concrete Shear Wall With Concrete IMRF, R = 6.5). We were dealing the project as a vetting
team.

• Gillani Mega Mart


It was a G+4 structure spreading on large area. It was divided in three parts through seismic joints.
It was analyzed using ETABS 8 and designed as per ACI 2002 special provisions for high seismic
zone.
• Awqaf Commercial Complex
It was a shopping mall including five towers of 11 to 15 stories. It was built in 1980’s and
strengthening to be done now. We analyzed the towers structure above ground and columns were
strengthened with box shaped RCC columns around the existing ones.
• Boubyan Bank Data Center
The bank building had flat slab system, waffle slab on large auditorium and some basement walls.

• Memon Square Hyderabad


It was an RCC structure analyzed using ETABS 8 and designed as per ACI 2002.

• Zamzama Gas Field (BHP Billiton)


The project included the design of ware houses, steel sheds and storm water drainage plans, switch
room, accommodation block extension and office block extension.

• Adamjee Weaving Mills Nooriabad


This is a concrete structure which had to bear additional industrial equipment load including other
gravity loads. It has RCC slab with supplier duct and PC Girder.

• Khas Textile Mills


This textile mill is a concrete structure which has RCC slab with supplier duct and PC Girder.

• Abbott Laboratories
It is a pharmaceutical industry having live loads of 7.5 KN/m2. A huge grillage of RCC beams was
planned in order to acquire more strength of frame and clearance at floor.

• Mak Port Buildings.


• Abdullah Al Mubarak Airbase (AAMA)
• Umm Al-Heyman Buildings
• Messilah Beach Buildings
• Egailah Beaches Buildings
• Al Rahim Textile Mills
• Goodwill Textile Mills.
• Classic Denim Korangi.

Bridges

• Widening and Strengthening of N-70 (Rakhi Gajj To Bewata 33.84 Km)


Project was aimed to improve traveling conditions of the existing highway from Rakhi Gajj To
Bewata. A 33.84 km long tack included many new PC and steel bridges plus strength evaluation
existing PC and RCC bridges. AASHTO LRFD 2007 was used for specification guideline of the
project. SAP, MIDAS Civil and STAAD 2005 were used for structural designing.

• Dualization of N-5 (Ghaggar Phatak To Thatta Bypass)


This project is based on dualization of route between Ghaggr Phatak to Thatta Bypass, evaluation
of existing bridges & culverts and proposal formation of replacement / repair of deteriorated
elements. It has eight bridges and forty culverts to be inspected while all new road, bridges and
culverts to be proposed.

• Bridge on Hub-Uthal Section N-25


This project includes many curved and straight bridges having a variety of height due to irregular
ground profile. Straight PC girders were used with curved RCC slab and RCC piers off different
types.

• Peshawer Torkham Expressway


The project have several bridges with very irregular land profile for example a Bridge has two
simply supported spans of 40m each, which are designed with P.C. Girders. Central Pier is 45m
high, so it is designed with hollow Box Sections. Earthquake Analysis is done with User coefficient
method on SAP.

• Ubairo Sheikh Wahan


This project many curved bridges of moderate span range. Straight PC girders were used with
curved RCC slab and RCC piers. Bridges were modeled on SAP in form of saperate files of
Superstructure and Substructure.

• Konodass Bridge on Gilgit River.


This project includes many straight bridges having a variety of height due to irregular ground
profile. Straight PC girders were used with curved RCC slab and RCC piers off different types.
• Konodass Bridge on Gilgit River.
• Bridge on Sheikh Kitha Canal.
• Northern Bypass upto N-5.
ACADEMIC QUALIFICATION .

 B.E. Civil Engg. from N.E.D. University of Engg and Technology (2000-2003 with 76%)
 Intermediate from D.J. Science College. (1999-2000 with 73%)
 Matriculation Govt Tech High School (1996-1997 with 82%)

COMPUTER SKILLS .

 SAP
 ETABS
 SAFE
 TEKLA TEDDS
 MIDAS Civil
 STAAD
 Auto Cad
 MS Excel
MEMBERSHIP OF PROFESSIONAL SOCIETIES .

 Member of Pakistan Engg Council (MPEC Civil / 24782).

PERSONAL PROFILE .

DOB 3rd June 1981.


Marital Status Married.
Languages English and Urdu.
Hobbies Reading, Internet, Music & Cricket.