SLABS Engineering Private Limited
LABS Engineering is for parking were required at design. Accordingly Tower Crane
Creative structural Ground Floor Level. Construction was selected for the project. Using
Engineering firm by a group till 1st Floor Level is cast in Situ Single Tower Crane Entire Project
of IITian’s and broadly in to and above floors is constructed was erected.
Structural engineering and using precast technology. Project Site at Mangalore
design of Precast high rise Precast Element Summary from the factory was about 450kms
buildings. Following is the brief of variety of but due to road block at
Project Brief: “Meriyeden: Structural precast elements used in intermediate level of the project;
Yenepoya University Family the project. distance to be travelled for
Accomodation Table 1Element Summary of the Project
transporting the panels was about
SLABS designed the Element No. of
750kms. To meet this challenge few
tallest Building in Mangalore using Pieces
Walls 1675 of the pallets were brought to site
Precast Technology. We optimised for casting of panels to increase
Parapet 119
the repeatability of elements so as Erection Speed.
to extract the best use of precast Landing + Midlandings 24
MEP Integration
Technology. Stair Flight 32
Electrical Conduits and
G+8 Storied “Meriyeden” Hollow Core Slabs 1341 Junction boxes were added in Wall
Tower is 33m Tall comprising of Bathroom Pods 208 Panels during Production.
Shear Walls and HCS as structural Beams 88 Routing of Conduit in Plan
framing system used to transfer Sunshade i.e. Chajja 204 was done from structural screed
gravity and lateral loads to the
founding system. Graphic Concrete Panels before pouring the concrete above
Project Scale i.e. built up are used to achieve exposed the HCS.
concrete aesthetics revealing Plumbing Grooves for
Area is of 1 lakh sq.ft. Kitchen Sink Area were provided in
No Plastering required for architects visualizations.
Further as tabulated Light the Wall Panels during Production.
this project as we had high quality As Bathroom PODS were
factory finished Panels which were weight Bathroom PODS were one
of a kind to be used in India for a used; outlet of electrical supply and
aesthetically beautiful and plumbing from POD were
structural of high integrity and project of this scale and type.
Structural Engineering Analysis coordinated with Main Building
strength.
Foundation comprised of ETABS and SAFE was surrounding wall panels to provide
laterite soil with N value less than used to realize seismic behaviour of connectivity to the POD.
10. For this we have done rigorous the Structure and its foundation.
sub soil structure integration study Building 3D Model were
to eliminate pile foundation. We built to realize extensively tonnage,
have used raft foundation for this erection and for preparation of shop
project leading to enormous amount drawings.
of cost saving. Time Period of Construction
Structural Framing Entire Building was
Cross Walls / Shear Walls and HCS constructed along with substructure
were used as primary structural in a time breaking record of 5 Figure 2 Conduits congestion at DB Box
months and handed over the clients. Junction
Figure 4 Routing of Conduits in Plan
within Screed
Concrete and Steel Consumption
Total Concrete along with
UG Sump and Main Building; used
is 5745 cu.m and Steel
Consumption for the project is 478
Mt.